Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Recovery Of Bitumen By Implementation Of Column Flotation In The Athabasca Oil SandsColumn flotation has been successfully implemented on a production scale in the Athabasca oil sands. In this application, bitumen is recovered and mineral matter is simultaneously rejected from a midd
Jan 1, 2012
-
Benefits of Early Collaboration Between Designers and Suppliers in Tunnel DesignBy Günther M. Volkmann
Continuous developments in tunneling require knowledge transfer between designers and suppliers to optimize the application of support systems. This collaboration allows the designer access to the lat
Jan 1, 2008
-
Reserve calculations, mining, and milling of Homestake Mining’s Open Cut project describedBy Jerry D. Pfarr, Gary Loving, David G. McDowall
Introduction The Open Cut is one of the best known landmarks in South Dakota's Black Hills. It is the site of the original discovery of the Homestake ledge, or lead, in 1876. Between that time a
Jan 10, 1987
-
Methods For Preventing Decompression Of Soft Ground During Soft Ground Tunneling For The Paris MetroBy J. Janin, J. F. Bougard
Development of improved transportation networks in major urban centers has led more and more to underground construction, the only reasonable solution for decreasing surface traffic congestion. Excava
Jan 1, 1974
-
Government Minerals Policy Assailed at AMC Conference"Lax, misguided, and dangerous" is Rep. James Santini's description of the official US position on strategic nonfuel minerals. Santini (D-NV), chairman of the House Mines and Mining Subcommittee,
Jan 11, 1980
-
An Analysis Of Recent MSHA Accident Datafor Underground Metal Mines Using BackfillBy J. B. Seymour
This paper provides an overview of the current use of backfill for ground support in underground metal mines in the United States and a summary of recent accident data reported for these mines by the
Feb 27, 2013
-
Engineering Geology and Cavern Design for New York CityBy Christopher Snee
??care has to be taken that the design is driven by sound geological reasoning and rigorous engineering logic rather than by the very attractive images that appear on the computer screen.??Hoek 1999
Jan 1, 2008
-
CEET (Comminution Economic Evaluation Tool) (For Comminution Circuit Design And Production Planning)By G. Kosick, G. Dobby
CEET, an acronym for Comminution Economic Evaluation Tool, was jointly developed by MinnovEX Technologies Inc. and 13 major mining companies for the purpose of designing and predicting the performance
Jan 1, 2001
-
Industry Technologies Featured at MPES MeetingThe development of technologies to improve mining and mineral processing is an ongoing process. These new technologies are the result of the industry’s drive to lower costs and improve productivity.
Jan 1, 2006
-
Guadarrama Tunnel Construction with Double Shield TBMsBy F. Mendaña
The characteristics of the igneous and metamorphic bedrock, extra-hard and abrasive, of the Guadarrama Tunnels, a bi-tube project of length 28.4 km without any intermediate attack, are first commented
Jan 1, 2007
-
Analysis Of Enhanced Coalbed Methane Recovery Through Carbon Sequestration In The Central Appalachian BasinBy M. J. Miller, N. Ripepi, M. Karmis, J. M. Conrad
Unmineable coal seams present an opportunity to sequester carbon dioxide emissions from power plants, while enhancing the recovery of coalbed methane. Injected carbon dioxide is adsorbed and stored o
Jan 1, 2006
-
Metallurgical Development And Design For The Pascua Lama ProjectBy R. A. Williams
The Pascua Lama Project is situated on the border of Chile and Argentina at an elevation of 4,800 m. The ore contains gold, silver and copper, and an initial milling production rate of 33,000 t/d is
Jan 1, 2001
-
Geology of the Vulture MineBy Don C. White
The Vulture mine near Wickenburg, Arizona was a major gold producer from 1863 to 1942, having yielded about 11t(12.1 st) Au and 8t (8.8st) Ag. Gold occurs as coarse native metal and electrum in quartz
Jan 1, 1990
-
Implementingan Efficient Mine Planning SystemBy H. Gurgenli
Mining companies require accurate short-term mining forecasts to meet budget targets and customer needs. Challenging mining conditions along with employee turnover and lack of standard geologic modeli
Jan 1, 2011
-
Optimisation Of Single-Layer Cover Made Of Desulphurized Tailings: Application To The Doyon MineBy I. Demers
Doyon mine, Quebec, Canada evaluates the possibility of desulphurizing their tailings to produce material to be used in as cover over the acid generating tailings disposal site. Laboratory tests were
Jan 1, 2008
-
Alignment Of Short-Term And Operational Plans Using Discrete Event SimulationThe fundamental objective of mine plans are usually to maximize the mine profit by extracting ore at the lowest possible cost over the mine life while some technical constraints are satisfied. Since t
Jan 1, 2012
-
Numerical Evaluation Of Effectiveness Of Drainwells In Dewatering Overburden At Surface Coal MinesBy R. L. Howell, L. C. Atkinson
Typical sedimentary sequences overlying coal seams consist of interbedded sandstones, siltstones, shales, and rider coal seams. In many surface coalmine settings, these sediments are saturated; and p
Jan 1, 2000
-
Us Geological Surveys Coal Resource Assessment Of Top-Producing Coal Beds And Coal Zones In The Northern And Central Appalachian Basin Coal RegionsBy L. F. Ruppert, P. A. Freeman, R. C. Milici, S. J. Tewalt, L. J. Bragg
The U.S. Geological Survey has completed a dig-ital coal resource assessment of six of the top-producing coal beds and coal zones in the northern and central Appalachian Basin coal regions. These inc
Jan 1, 2001
-
Coal 1988By M. L. Mellish
The year 1988 unexpectedly turned out to be a good year for the US coal industry. In fact, it was a third consecutive year of record coal production. Accord¬ing to preliminary Energy Information Admin
Jan 1, 1989
-
Liebherr?s T282 B trucks operating in BrazilIn September, a fleet of 363-t (400-st) Liebherr trucks became operational in Brazil and have already begun moving iron ore in Para state. Prior to the arrival of the the trucks the Brazilian fleet
Jan 1, 2010