Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Rock Mass Rating System For Evaluating Stope Stability On The Bushveld Platinum MinesBy B. P. Watson
Several large falls of ground occur annually in the narrow, tabular stopes mined in the Bushveld Complex. These falls comprise safety risks and cause substantial production losses and compromise effor
Jan 1, 2004
-
A Comparison of Limit Equilibrium and Numerical Modelling Approaches to Risk Analysis for Open Pit MiningBy H. T. Chiwaye
Risk analysis is an important step in the design of rock slopes in open pit mining. Risk is defined as the product of the probability of slope failure and the consequences of the failure, and is gener
Jan 1, 2010
-
1D Numerical Simulation of Velocity Amplification of P-Waves Travelling Through Fractured Rock Near a Free SurfaceBy G. Swan, E. Nordlund, P. Zhang
"SynopsisThe most widely used support design damage criterion for rockburst-prone mines is based upon kinetic energy, which is proportional to the square of the ejection velocity and is commonly expre
Jan 1, 2015
-
Interaction Between The Block Cave And The Pit Slopes At Palabora MineBy Peter Townsend, Sergei Diachenko, Allan Moss
The Palabora Mining Company has successfully extended the life of its operation by developing a 30,000tpd block cave underground mine below the now closed open pit. The process of transitioning from
Jan 1, 2006
-
A critical evaluation of processes to produce primary titanium - SynopsisBy D. S. van Vuuren
Over the last 60 years many different processes were conceived to reduce the cost of titanium produced by the Kroll process. However, success eluded all previous efforts, which were consequently termi
Jan 1, 2009
-
Cyanidation Of Reef And Surface Gold Ores ? SynopsisBy L. Rademan
The kinetic leaching behaviour of a low-grade surface gold ore and a high-grade reef ore were evaluated to determine the achievable gold recovery from these ores and particularly mixtures of these ore
Jan 1, 2012
-
Critical investigation into the problems surrounding pillar holing operationsBy L. Mpolokeng, J. P. Labuschagne, H. Yilmaz
"An investigation into pillar cutting was carried out at a platinum mine on the western limb of the Bushveld Complex. The focus was on crush pillar design and implementation in order to ultimately imp
Jan 1, 2015
-
New systems for geological modelling-black box or best practice?By C. Birch
"A ‘geologically constrained’ orebody model has long been hailed as vital for a Mineral Resource statement that is compliant with the South African Code for Reporting of Exploration Results, Mineral R
Jan 1, 2014
-
A New Bubble Pick-up Technique as a Rapid Flotation Test MethodBy A. F. Lee
A pick-up apparatus capable of yielding quantitative results has been described. Studies of some collector-mineral systems have been presented to illustrate the versatility of the apparatus and prove
-
Pushback 8 South ? A Case Study In Pit Slope ManagementBy P Knight, P A. Walker, H E. Speight
Pushback 8 South is the final cut back on the south wall of the East Pit at BHPBilliton?s Mt Whaleback iron ore mine in the Pilbara region of Western Australia. Development of the cutback commenced i
Jan 1, 2006
-
Separation Performance Of Raw Coal From South Africa Using The Dense Gas-Solid Fluidized Bed Beneficiation TechniqueBy J. He
The separation performance of a raw coal sample from South Africa based on the dense gas-solid fluidized bed beneficiation technique was investigated. Analysis showed that the raw coal sample distribu
Jul 1, 2013
-
Using MIP for strategic life-of-mine planning of the lead/zinc stream at Mount Isa MinesBy M. L. Smith, G. Karunatillake
Lead-zinc production at MIM, Mount Isa includes three mines, a lead concentrator, zinc filter plant and lead refinery. Lead production is vertically integrated with lead-silver bullion shipped from Au
Jan 1, 2003
-
Some Myths About DC Arc Furnaces ? SynopsisBy R. T. Jones
DC arc furnaces are widely used for steel scrap melting as well as for reductive smelting of ore fines. Industrial smelting applications include the smelting of chromite to produce ferrochromium, the
Jan 1, 2011
-
Uncertainty in Rock Mechanics and Rock Engineering—Then and NowBy H. H. Einstein
This paper reviews how uncertainty has been dealt with over the past 40 years using the decision making cycle as a frame of reference. The review of the phases of this cycle, as applied to rockmechani
Jan 1, 2003
-
Development and testing of a vehicle collision avoidance system based on GPS and wireless networks for open-pit minesBy A. Nieto
A vehicle proximity warning–collision avoidance system is being developed using GPS and wireless local area networks to improve safety of off-highway trucks in open pit mines. After two-and a-half yea
Jan 1, 2003
-
Large-Scale Design And Testing Of An Improved Fine Coal Dewatering System - Synopsis (0b7ce52d-2bd9-4f5e-84a7-9ce2b2e08562)By M. Le Roux
Fine coal (-500 µm) is notoriously difficult to dewater. It is not uncommon for a dewatered product to have a moisture content as high as 30 per cent after vacuum filtration. This poses several handli
Jan 1, 2012
-
The Importance Of Both Geological Structures And Mining Induced Stress Fractures On The Hangingwall Stability In A Deep Level Gold MineBy G. B. Quaye
The deep level gold mining environment is characterized by high stresses that give rise to intense mining induced fracturing of the rock mass surrounding the stopes. In a geologically disturbed region
Jan 1, 1998
-
The interaction of rock mass properties and the project specific boundary conditions as basis for the design of deep excavation pitsBy R. Katzenbach, M. Vogler, U. Adamietz
Abstract The design of deep excavation pits in rock mass is dependent as well on the mechanical properties of the rock mass as for example the orientation and the type of discontinuities like bed
Jan 1, 2003
-
Improving processing by adaption to conditional geostatistical simulation of block compositions"Exploitation of an ore deposit can be optimized by adapting the beneficiation processes to the properties of individual ore blocks. This can involve switching in and out certain treatment steps, or s
Jan 1, 2015
-
Determination Of Optimal Cut-Off Grade Policy To Optimize NPV Using A New Approach With Optimization FactorBy A. Bascetin
One very important aspect of mining is deciding what material in a deposit is worth mining and processing, versus what material should be considered waste. This decision is summarized by the cut-off g
Jan 1, 2007