    Interdisciplinary And Inventive Approaches To Drilled Shaft Remediation

    By William D. Oder, Seth H. Hamblin, Les R. Chernatskas, Jonathan L. Ernst

    Large diameter drilled deep foundations are a widely utilized solution throughout North America and the world. Numerous design and construction techniques developed over the past 100 years have made t

    Oct 1, 2022

  • DFI
    Cooling Water Intake Shafts for the Oak Creek Expansion

    By Edward Jacobsen, Patrick J. Lydon

    "The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake

    Jan 1, 2008

  • DFI
    Deep-Sea Quay Wall for Offshore Wind Energy Terminal on Maasvlakte 2 Rotterdam – NL

    By Patrick van der Schaaf

    "During 2016, foundation piling works were completed to allow for the construction of a production and storage/handling terminal in Rotterdam. It is there that steel foundations will be produced for o

    Jan 1, 1900

  • DFI
    Comparison of Load Test Results between ACIP Piles Installed in Sand in Pre-Drilled Holes versus Conventional Installation

    By Tracy Brettmann, Shailendra Endley, Jason Leary, Shashank Valluru

    "Augered Cast-in-Place (ACIP) piles have long been used for deep foundation support in sands due to their high capacity and speed of installation. Very little information exists on the effects on capa

    Jan 1, 2017

  • DFI
    Design, Construction, and Long-Term Monitoring of a Pile-Supported LNG Tank in Savannah, Georgia

    By Cheng Lin, Guoming Lin

    "This paper presents a case history for the design, construction and long-term performance monitoring of a driven prestressed concrete (PSC) piled foundation supporting a large liquefied natural gas (

    Jan 1, 1900

  • DFI
    Anchored Hollow Bar Tangent Pile System For Underpinning

    By Marco D. Boscardin, Benjamin H. MacKinney, Kenneth R. Allard, Kenneth A. Pidgeon, Adriane G. Boscardin

    This paper presents a case history for a unique application of a system of vertical micropiles with horizontal soil nail bracing and shotcrete facing for underpinning. The system was used to support a

    Oct 1, 2022

  • DFI
    Repair Methods For Corroded Steel Piles

    By C. Vipulanandan

    With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but als

  • DFI
    Thermo-Mechanical Behavior of Energy Piles: Full-Scale Field Test Verification

    By Tracy Brettmann, Melis Sutman, C. Guney Olgen

    "The use of energy piles for geothermal heat exchange has been steadily increasing during the last decade, yet there are still pending questions on their behavior during temperature changes. This pape

    Jan 1, 2017

  • DFI
    Earth Pressure Distribution On Diaphragm Wall During Excavation

    By Ting Chinsu

    Diaphragm wall with tie-back cable is widely used for deep excavation, especially in the area with high density of buildings. This paper presents the measured earth pressure distribution on diaphragm

    Jan 1, 1991

  • DFI
    Delving Deeper Into Foundation Slurry Rheology

    By Greg Plutko

    Laboratory testing has shown that the Marsh Funnel test can be significantly impacted by long-chain polymer entanglement. In general, shorter hydration time leads to more chain entanglement which in-t

  • DFI
    EFFC/DFI Best Practice Guide to Tremie Concrete for Deep Foundations, Edition 1

    By EFFC/DFI Concrete Task Group

    Concrete technology continues to advance rapidly and modern mixes with five components – cement, additions, aggregates, (chemical) admixtures and water – often have characteristics which differ signif

    Jan 1, 2016

  • DFI
    Repair Methods for Corroded Steel Piles (0af709a8-9f1e-4f35-81ea-c69c3ee7fb05)

    By C. Vipulanandan, M. Dawood, Dongmei Pan

    "With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but al

    Jan 1, 2017

  • DFI
  • DFI
    Augercast Piles - History And Advancements

    By Larry Rayburn

    Augercast piles evolved in the late forties from the process of pressure grouting open holes backfilled with stone. In 1956, a patent was issued for a cast in situ pile by pumping high pressure grout

    Jan 1, 2005

  • DFI
    Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction

    By Alan D. Fisher

    Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen

    Jan 1, 2013

  • DFI
    Design, Construction, And Instrumentation Of An Atypical A-Frame Micropile Wall In Aspen, Colorado

    By Kyle Kershaw

    Micropiles are routinely used in the United States for foundation support and stabilization of slopes. In recent years, several retaining walls have been constructed using micropiles in an A-frame ty

    Jan 1, 2007

  • DFI
    The Road to Innovation in Geotechnical Construction (f2290583-6329-4b39-a4c9-b746aba3a1f4)

    By Peter J. Nicholson

    "IntroductionDuring my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concre

    Jan 1, 2017

  • DFI
    The Road To Innovation In Geotechnical Construction

    By Peter J. Nicholson

    During my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concrete or steel i

  • DFI
    Newtown Creek Pile Foundation Work 2009

    By Thomas Trochalides

    Newtown Creek Water Pollution Control Plant in Brooklyn, NY is the largest of 14 Water Pollution Control Plants in New York City. It services over 1 million people with a current processing capacity

    Jan 1, 2010

  • DFI
    Equipment Installation - Recent Developments: General Report On 'Installation Equipments' ? 1 Introduction

    By A. Paviani

    The subject of this session is "Equipment Installa­tion, Recent Developments". This is a subject which is not usually addressed at conferences of Foundation Engineering. It is rare to find sessions

    Jan 1, 1994