    Analysis Of Driving Stress Measured In The RC Long Pile

    By Yu Zhenquan

    At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa

    Jan 1, 1991

  • DFI
    Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? Synopsis

    By M. Pernot

    A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati

    Jan 1, 2010

  • DFI
    Earth Retention Using Augered Cast-In-Place Piles - A. Introduction - 1. Applications

    By William S. Heckman

    a. When to use: high surcharges, vertical capacity required, limit noise and eliminate vibrations, low headroom, eliminate vibration induced settlements. b. Advantages: eliminates impact noise and

    Jan 1, 1997

  • DFI
    Evaluation For Stone-Column Composite Foundation In Rayleigh Wave Method

    By Zhang Baoshan

    In this paper, the forced features and dynamic behaviors of stone-column composite foundation are concisely related. The characteristics of Rayleigh wave method is summarised. This method is proposed

    Jan 1, 1991

  • DFI
    Construction Of Long Tubular Column Foundations Under Deep Water ? Synopsis

    By C. L. Liao

    The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter

    Jan 1, 2010

  • DFI
    Bearing Capacity Of Precast Nodular Piles In Tianjin Soft Clayey Soil

    By Xu Youzai

    Static loading teets of five nodular piles and four non-nodular piles were performed in Tianjin soft clayey soil in which measurements of axial force and movements were made. Distribution of shaft res

    Jan 1, 1991

  • DFI
    Sleeved Pile Foundations For The W. Seattle - Harbor Islands Swing Bridge And The Seattle Access Projects

    By Kent C. Werle

    This brief discusses the installation and application of sleeved piles of two different types for two different projects, the W, Seattle to Harbor Island Swing Bridge Project and the Seattle Access Pr

    Jan 1, 1990

  • DFI
    Influence Of Diameter On The Bearing Capacity Of Lateral Loaded Drilled Shaft

    By Bin Zhang

    Drilled shafts are a popular type of foundation for transportation applications. They feature the advantages of providing high bearing capacity and generating low construction noise. Advancements in

    Jan 1, 2007

  • DFI
    A Small Diameter Vibration Pile With Soil Compaction

    By Miklós Kovács

    A new type of the cast in situ piles is introduced. The installation of the new pile is based on a pushing in/gaining back procedure. A temporarily closed tip element with square shaped cross-section

    Jan 1, 2002

  • DFI
    Application Of The Dynamic Increasing Energy Test (DIET) In Load Transfer Analysis Of Precast Piles Driven In Soft Clay Formation

    By Jean Balech

    This paper presents some results of dynamic loading tests performed on concrete piles driven in soft clay formation. The load transfer mechanism, measured in the dynamic increasing energy test (DIET),

    Jan 1, 2002

  • DFI
    Deep Compaction Of Saturated Loess By Means Of Sand-Gravel Piles ? Synopsis

    By Z. G. Lin

    In Xian, China, compaction by means of soil (or lime-soil) piles is one of the effective methods widely used for densifying loess and eliminating its collapsibility. However, as a result of groundwate

    Jan 1, 2010

  • DFI
    Capacity Of Slender Steel Piles

    By J. Wennerstrand

    Slender steel piles have found an increased use in Sweden in resent years. These piles are often driven throw soft normally consolidated clay to refusal in till or at the rock surface. In contrast to

    Jan 1, 1989

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 1997

  • DFI
    Pile Foundation - A Critical Study Of Some Design Aspects. - Synopsis

    By S. L. Karunakaran

    Selection of an appropriate foundation system requires great skill and ingenuity on the part of the designer. Certain guidelines for choosing between a pile and raft foundation are presented. A number

    Jan 1, 1996

  • DFI
    Non-Destructive Geophysical Evaluation Of Deep-Mixed Soil: A Computer Modeling Study

    By David A. Staab

    Numerical modeling was used to investigate the feasibility of using two geophysical imaging techniques, cross-borehole ground penetrating radar (XBGPR) tomography and electrical resistivity (ER) tomog

    Jan 1, 2004

  • DFI
    Combined Loading Tests On Large Diameter Piles

    By A. Lyndon

    Combined loading tests are described to three 1.2m diameter cast-in-place bored piles, 12m long, formed through cohesionless material into stiff sandy clay. The maximum loading conditions imposed at t

    Jan 1, 1989

  • DFI
    A Quality Control System For Augered Cast-In-Place Pile Installation

    By George G. Goble

    The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very

    Jan 1, 1997

  • DFI
    Jet Grouting As Soil Improvement In Southeast Florida

    By Evelio N. Horta

    The influence of soil improvement replacement area in foundation settlements is discussed for soil improvement methods used in Southeast Florida. A 3D Finite element analysis is used for two typical c

    Jan 1, 2007

  • DFI
    Lower Risks With ECR®/EFT®-Measurements In Underground Constructions

    By Patrick P. A. Wolfs

    In the summer of 2000, the ECR®/EFT® was first introduced in the Netherlands. After the first project a field test was performed together with other geophysical methods to prove the liability of these

    Jan 1, 2006

  • DFI
    High Risk Control For Piling And Deep Foundations - A Systematic Approach

    By Martin van Staveren

    In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu