I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - ImplementationBy Darrell L. Beddard
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t
Jan 1, 1996
-
Stability Analysis Of Jack-Up Rig At The Bohai Oil Field ? IntroductionBy H. Cheng
The Bohai Oil Company has applied all together 11 jack-up oil drilling rigs (movable platforms) (1) which can be classified in terms of their forms of foundations into two types: the integral mat and
Jan 1, 2010
-
Micro-Pile Foundations in Difficult Subsurface ConditionsBy D. Dreher Whetstone, Paul M. Blakita, Christopher M. Reith, Ravi P. Malviya
"Micro-piles are small diameter (5 to 10 inches), cast-in-place piles which can develop high load capacities by bonding with soil or rock. Micro-piles are particularly well-suited for moderate to heav
Jan 1, 2005
-
Piled Foundations for the New Wembley Stadium, LondonBy Anthony L. Reynolds, Clifford J. Wren
"The adoption of a significant pile testing regime, the use of Eurocode 7 as the design standard, the development of lean construction techniques, and lateral thinking in overcoming some considerable
Jan 1, 2005
-
Goethals Bridge Replacement Foundation Design Modifications Due to Field ConditionsBy John P. Turner, Mark Jen, Bobby Daita
"The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-
Jan 1, 2016
-
Sustainability and Consideration of the Re-Use of Foundations for the Hurricane Deck BridgeBy Timothy C. Siegel, Paul J. Axtell
The Missouri Department of Transportation (MoDOT) recently replaced the Hurricane Deck Bridge that carries Highway 5 traffic across the Osage Arm of the Lake of the Ozarks in Camden County, Missouri.
Jan 1, 2017
-
Vibrations Caused by Pile DrivingBy K. Rainer Massarsch
"Part 2 of 2 (Continued from Summer 2004 edition) By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenVibrations, which are caused by the installation of piles in dry or permeable soils, can
Jan 1, 2004
-
Marine Clay Stabilisation Using An Encased Stone Column With Tyre Chips As AggregatesBy Rangaswamy. K, Naga Sivaji
A stone column is one of the most commonly employed methods of ground improvement techniques. This method used to increase the strength, decrease the compressibility of loose granular and finegrained
Nov 1, 2022
-
Design of Grillage and Helical Pile Foundation for Limited Access Transmission LineBy Benjamin Jennings, Jason Herron
In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis
Jan 1, 2017
-
Innovative Drilled Shaft Installation Process Through Existing Bridge FoundationsBy Tracy Brettmann
The Highway 146 Bridge Expansion Project across the Clear Creek Channel in Houston, Texas was designed on driven precast concrete piles. However, during construction, the piles along one side of the b
May 1, 2022
-
Large Diameter Helical Piles for Refinery ExpansionBy Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
Engineering Foundation Support For Las Vegas Strip's Tallest Hotel CasinoBy Nicholas P. Gura
This paper presents the analysis, design, and load test program results for drilled shafts to support a 70-story hotel tower and associated 10 story podium structures located in Las Vegas, Nevada. A
Jan 1, 2007
-
Cofferdam Solution for Steeply Sloping Rock Using Flat-Sheet PilesBy Norm Kirk, Robert Bittner
"The addition of a new powerhouse at the existing Tulloch Hydroelectric site on the Stanislaus River in the western foothills of the Sierras Nevada Mountains of central California required a deep exca
Jan 1, 2017
-
Replacing Top Layer Of Soft Clay With Compacted Engineering Fill To Improve The Lateral Capacity Of PilesBy Venugopal Bonani, Kumaran M., Thomas John
Liquid storage tanks are usually located in nearshore or coastal regions with soil profiles containing thick layers of compressible soils. These storage tanks are usually of large diameter up to 90m a
Sep 1, 2022
-
Lateral Response of Pole on Engineered Driven Timber Pile Footing at Ararat Windfarm Terminal StationBy Frank Albrecht, Brian McCarthy
"The Ararat Terminal Station (ARTS) is located 190km to the north-west of Melbourne, approximately 1.7km to the north of Elmhurst Township in the Pyrenees region of western Victoria, Australia. The si
Jan 1, 1900
-
Nyct's 207th St Yard FloodwallBy Christian L. Escalera
Over seven years ago, on October 29, 2012, Superstorm Sandy pummeled the Northeast of the United States inflicting heavy damage on New York City Transit’s (NYCT) system. Since then, NYCT has been meth
-
Suction Bucket InstallationBy Avi Shonberg
With the advancement of offshore wind farm projects towards deeper waters and larger wind turbine generators, founda- tion solutions other than the monopile have received increasing attention over the
Jul 1, 2022
-
Rock Socket Capacity Certification Using the Point Load Index TestBy Burt G. Look, David W. Lacey
"Certification of foundation capacity during the construction phase is often assessed by strength or weathering state descriptors based on visual observations. This case study used the Point Load Inde
Jan 1, 1900
-
Real-Time Anchor Testing and Data ManagementBy Bora Okumusoglu, Devon K. V. Mothersille
"AnchorTest is an innovative software package, specifically developed for tablets, that permits ground anchor test data assessment and management in real time. The solution has two components: a front
Jan 1, 2017
-
Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff WallBy Gene Bryant, Wesley Schmutzler, Matteo Bertoni
The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00
Jan 1, 2019