Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)By Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement ProjectBy Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang
During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati
Jan 1, 2019
-
Design Of Laterally Loaded Single Pile In Sand Near Slope - A Proposal For Subgrade Reaction FactorsBy Salim Mezazigh
Usually different methods for designing a single pile submitted to a lateral loading are available. They are based on theory of elasticity with the parameters E,v or subgrade reaction method using the
Jan 1, 2002
-
Load Distribution for Underpinning System Using Inherent Rigidity of Concrete DamBy Rick Deschamps, Amanda Blank, Matthew W. Drewek, Michael P. Walker
The Prairie du Sac Dam, located on the Wisconsin River, northwest of Madison, Wisconsin, was constructed 1912-1914. The spillway is an Ambursen-type, consisting of a series timber pile supported pier
Sep 8, 2021
-
Innovation In South East Asia - SynopsisBy Brian Littlechild
Whilst there is much innovative work being undertaken in South East Asia in the space allowed in this paper we have settled on describing in more detail the work that has been done with shaft grouting
Jan 1, 2000
-
Tension Tests On Driven Pipe Piles In Sand - SynopsisBy Alan J. Lutenegger
A series of tension tests were performed on prototype scale steel pipe piles at two sites to evaluate the influence of scale and pile plugging on the unit skin friction developed in axial tension. The
Jan 1, 2000
-
Load Tests On Belled Piles With Polystyrene Foam Between The Shaft And The BaseBy José Carlos A. Cintra
This paper addresses a new experimental procedure to measure the shaft friction and the base resistance of bored piles during static load tests. It is proposed that a set of polystyrene foam discs, pl
Jan 1, 2002
-
Pullout Capacity of Pile Groups in SandBy S. P. Mukherjee, Smita Tung
"Piles are generally subjected to uplift in case of under ground and water front structures. Sometimes piles are also to resist uplift loads in transmission towers, dry rock, and so on. Experimental i
Jan 1, 2015
-
Guidelines For Selection Of Parameters For Design Of Caisson Foundations For Certain Conditions. - SynopsisBy Dinesh R. Katti
Caissons which are locally known as well foundations, which may very in diameter from 30 m to more than 30 m and in majority of the cases having depth to diameter ratio between 1 to 1.5, are normally
Jan 1, 1996
-
RResearch On Dynamic Inspection Of Prototype Models Of Reinforced Concrete PilesBy Xuhui
Pile foundations are underground projects which are carried out under complicated site conditions, so it is difficult to summarize their characteristic patterns from the everchanging practical pile fo
Jan 1, 1991
-
Numerical Analysis of Mono and Group Suction Piles under Lateral Loadings in Layered Deposits (6db428d8-c029-43b4-b834-4c0cdce8dd47)By Ilhan Chang, Ernest Nsabimana, Kiseok Kwak, Juhyung Lee, Young-Hoon Jung
"Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silt
Jan 1, 2017
-
The FHWA Geotechnical Program for 2017"Every year during the Transportation Research Board (TRB) Annual Meeting in Washington D.C., the Federal Highway Administration (FHWA) National Geotechnical Team (NGT) takes time to talk about what w
Jan 1, 2017
-
The Geo-Impuls Programme: Towards Reducing Geotechnical Failure in the NetherlandsBy Paul M. C. B. M. Cools, Martin Th. van Staveren
In 2010, the 5-years joint industry programme Geo-Impuls started in the Netherlands. The ambitious goal of this programme is to reduce geotechnical failures in our civil engineering projects by half i
Jan 1, 2017
-
Ground Improvement By Jet Grouting For A Natural Gas Combined Cycle Power Plant In TurkeyBy Alp Gokalp
The aim of this article is to present an application of jet grouting technique in stiff clays for foundations of the natural gas combined cycle power plant, under construction in Aliaga, Turkey. The p
Jan 1, 2002
-
Wick Drains into the unknownBy Brian McGlynn
There are many factors that can result in a site characterization being limited. For example, a client may undervalue the importance of a good geotechnical report, or an owner may feel that it would t
May 1, 2023
-
Large Scale Geotechnical Works on Norways Largest Infrastructure ProjectBy Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
With the increase in population over the last decade, and anticipated population growth over the coming years, Norway is making significant investments in the Country’s infrastructure. Part of this in
Sep 8, 2021
-
Parametric Analysis Of Piled Rafts Founded On A Tropical Clay Of BrazilBy Renato P. Cunha
The paper presents the results of a comparative and parametric analysis in which a numerical program developed exclusively for groups of deep foundations under general loading (vertical, horizontal an
Jan 1, 2002
-
CPT Role in Rigid Inclusion Design and Quality AssuranceBy Jesus Gomez, Mary Nodine
Rigid inclusions are widely used in the U.S. as a ground improvement tech- nique, particularly for industrial, low- rise and highway applications with poor subsurface conditions, where control of sett
May 1, 2023
-
Soil Fatigue Analysis for Pile Driving Simulations Using an Impact HammerBy Peter Middendorp, David J. Tara, Gerald E. Verbeek, Jan Fischer
"For pile driving simulation the model used must be accurate for the entire process, i.e. from the start of pile driving until the pile has reached its target depth. Of the various model components (h
Jan 1, 2017
-
Soil Mixing Monitoring System Quality Control for the SR-83 Project in FloridaBy Danny Winters, Wesley Schmutzler, Christopher Lewis, Matteo Bertoni
"SR 83/US 331 is a primary North/South roadway in Walton County that is a crucial link for tourism and commerce between the Walton County beaches and the heavily traveled I-10 corridor in the panhandl
Jan 1, 2017