Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • DFI
    Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay Deposit

    By Wanchai Teparaksa

    Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large

    Jan 1, 2002

  • DFI
    UB Digs Deep and Builds Over Adjacent Subway for New Medical Building Hub

    By Lisa R. Papandrea, David Chen, Walter E. Kaeck

    "Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su

    Jan 1, 2016

  • DFI
    Partnering for Cutoff Wall Project Success

    By Osvaldo Valdez, Matteo Bertoni, Aem Ragy

    The East St. Louis Deep Cutoff Wall project is located in the area of East St. Louis, Illinois, across the Mississippi River from the city of St. Louis, Missouri, along the left descending bank of the

    Sep 1, 2023

  • DFI
    Pile Inspector's Guide To Hammers ? Introduction

    The pile inspector is a critical element in the quality control process necessary for a successful pile installation project. This guide is intended to provide the inspector with a basic understanding

    Jan 1, 1995

  • DFI
    Caisson Foundations For Mississippi River Bridges In The New Orleans Area

    By William B. Conway

    This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du

    Jan 1, 2013

  • DFI
    Dynamic Load Testing Of Non-Uniform Piles

    By Thai Nguyen Ph. D

    Dynamic Load Test (DLT) on driven piles has been performed routinely all over the world. In several recent projects, even 100% testing has become a norm where every single pile is dynamically load tes

    Oct 1, 2022

  • DFI
    Challenges And Recommendations For Quality Assurance Of Deep Foundations

    By Frank Rausche

    Although Quality Control (QC) during construction is preferable for deep foundations, there are many instances when it is necessary to resort to Quality Assurance (QA) methods if, for various reasons,

    Jan 1, 2008

  • DFI
    Temperature, Velocity, Density, And Moisture In Drilled Shafts

    By Khamis Y. Haramy

    Curing temperature, density, and moisture significantly affect the velocity measured in the crosshole sonic logging, the rate of strength gain, and the final strength of concrete in drilled shafts and

    Jan 1, 2007

  • DFI
    Prestressed Concrete Sheet Pile Retaining Wall to Support Railroad Embankment Widening Adjacent to a Wetland

    By Abhijit R. Sheth, Craig M. Benedict, John Brun, Ara G. Mouradian

    "Amtrak recently replaced the 1907-era bascule two-track bridge over the Niantic River between East Lyme and Waterford, Connecticut. The project included new approach embankments, with approximately 2

    Jan 1, 2017

  • DFI
    Vertical Load Test on a Drilled Shaft Installed in Glacially Derived Sediments

    By Robert C. Simpson, Ghada S. Ellithy

    "There are several methods for estimating the axial capacity of drilled shafts installed in coarse-grained soils. Most methods estimate the ultimate capacity for side friction and tip resistance. Desi

    Jan 1, 2015

  • DFI
    Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult Geology

    By A. Rod Kern, Michael A. McNicholas, Yaser Taheri

    Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing

    Jan 1, 2019

  • DFI
    Field Testing Of Energy Piles At Virginia Tech

    By Olgun

    Energy piles are a new innovative renewable energy technology to access and exploit the relative constant temperature of the ground for efficient heating and cooling of buildings. Examples of energy

  • DFI
    Large Diameter Auger Cast Piles At Audi Field, Dc United's New Soccer Stadium

    By Christophe H. Locussol

    D.C. United, the professional soccer team located in Washington, D.C., completed a 20,000 seat capacity stadium in July 2018 named Audi Field. The project initially considered a foundation system cons

  • DFI
    Pile Diameter Effects On Initial Modulus Of Subgrade Reaction For Laterally Loaded Piles

    By Hubert Law, Amin Rahmani

    This paper evaluates the effects of pile diameter on the initial modulus of subgrade reaction and proposes modifications to the subgrade reaction moduli that are commonly used in the current state of

  • DFI
    Inspector's Manual For Driven Pile Foundations ? Introduction

    This manual provides basic practical instruction on the inspection of driven piles. It covers the essential components of pile driving, such as the pile driving hammer, hammer accessories, the pile an

    Jan 1, 1997

  • DFI
    Estimating Kinematic Demands From Lateral Ground Deformations On Pile-Supported Wharves

    By Arash Khosravifar Ph. D. P. E., Thomas Torkelson P. E., Milad Souri Ph. D. P. E.

    Kinematic demands from lateral ground deformations can be a major cause of damage to maritime and highway transportation structures such as wharves, piers, and bridges. These kinematic demands are dif

    Oct 1, 2022

  • DFI
    Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case History

    By Raffaella Granata, Daniele Vanni

    "This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o

    Jan 1, 2016

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Integrity Evaluation of Driven Concrete Piles Utilizing Embedded Data Collectors (ac1e1b32-2f59-488d-aca4-5ee1b43eb226)

    By Donald T. Robertson, Kurt Hecht, Michael K. Muchard

    "This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during

    Jan 1, 2017