Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Co-Extraction of Coal and Methane

    The concept and practices of co-extraction of coal and methane have emerged in recent years to improve coal mining safety and productivity, utilise methane resources, and reduce fugitive emissions in

    Aug 1, 2013

  • CIM
    Development of Mining System for Seafloor Massive Sulfide in Japan

    By T. Kawai

    Japan Oil, Gas and Metals National Corporation (JOGMEC) has started an exploration program for Seafloor Massive Sulfides (SMS) in the EEZ of Japan, and launched an investigation program for mining, pr

    Aug 1, 2013

  • CIM
    Digital Transformation in Metallurgical Facility Design, Construction and Operations

    By D. Ofstie, B. Kargutkar

    BIM, or Building Information Modeling, is transforming the way metallurgical facilities are built, operated and maintained. BIM provides a digital representation of the facility, complete with all phy

    Jan 1, 2015

  • CIM
    Efficient Scale Up Of Sensor Based Sorting Systems

    By J. Kolacz

    "A new sensor based sorting system has been developed, providing a possibility for laboratory scale testing and further scale-up of the separation results to the industrial operation. The new system c

    Jan 1, 2016

  • CIM
    Numerical Analysis of Magnetic Pulse Forming and Deformation Structure of Pure Al and Cu Sheets

    By Shinji Muraishi, Shinji Kumai, Yasutaka Kedo, Takashi Kambe

    "Magnetic pulse forming (MPF) is one of the extreme high-speed forming processes. A metal sheet which is accelerated by electromagnetic force is collided onto a mold and fine and sharp details of the

    Jan 1, 2018

  • CIM
    Case Study: Using Polymer Ducting for Face Ventilation of Coal Mines

    By Bryon Cerklefskie, Michael Schulte

    "This case study explores the usage of polymer ducting as a replacement to curtains and FRP for face ventilation in two coal mines. There are two mines looked at, one is the highest elevation undergro

    Jan 1, 2019

  • CIM
    A Simplified Approach for Evaluating Concrete Deterioration in Vertical Shaft Lining

    By G. Q. Zhou, H. C. Liang, X. D. Zhao

    "This study describes the strain behavior in vertical shaft lining (VSL) embedded in thick soil deposits and its application in assessment of concrete deterioration. The observed strain in VSL continu

    Jan 1, 2019

  • CIM
    Hydraulic Underground Mining of Oil Sands ? The Next Big Step?

    By Dwayne D. Tannant

    This paper presents a new mining concept for oil sands called ?hydraulic underground mining of oil sands? or HUMOS. While this mining method is still at the conceptual stage it has great promise to al

    May 1, 2001

  • CIM
    Cable Bolt Bearing Capacity – An In Situ Parametric Study

    By K. Soucek, J. Ptácek, A. Hastíková, R. Kukutsch, P. Konícek, P. Waclawik

    "Cable bolts are used frequently as a secondary support system (with steel arch support) in difficult stress-strain conditions of deep coal mines. The load transfer mechanism of cable bolts depends on

    Jan 1, 2015

  • CIM
    Prince Colliery underground rope haulage system

    By John T. Ling

    "This paper describes the operation of a rope haulage used as the main system of transportation in an underground coal mine. Prince Colliery, which is operated by the Cape Breton Development Corporati

    Jan 1, 1999

  • CIM
    Bloom Lake: Flowsheet Improvement and Recommissioning

    By A. Belleau, F. Lavoie

    "Quebec Iron Ore Limited (QIO), a subsidiary of Champion Iron Limited (Champion), secured assets in early 2016 from the previous Bloom Lake operations in the heart of the Labrador Trough region of Nor

    Jan 1, 2019

  • CIM
    Ultragold: Real-Time Gold-in-Slurry Analysis with 100 Ppb Accuracy

    "Real-time, on-stream analysis of the metal content of process slurries is an essential prerequisite for process monitoring and advanced control of mineral processing circuits. On-stream X-Ray Fluores

    Jan 1, 2017

  • CIM
    The Effect of Carbonate Ions on the Electrokinetic Properties of Bastnäsite, Monazite and Dolomite

    By K. E. Waters, E. R. L. Espiritu, G. R. da Silva

    "Rare earth (RE) elements are essential components of emerging green technologies. The increase in demand for these applications have driven the search and development of new rare earth deposits such

    Jan 1, 2016

  • CIM
    In Situ Image Analysis of Batch Settling of Flocculated Minerals with Physical-Statiscal Feature Extraction Method

    By M. R. MacIver, M. P. Pawlik

    "An image analysis method based on chord length distributions is applied to the batch settling of polyacrylamide flocculated kaolin suspensions. Two features of the interaggregate void space, the void

    Jan 1, 2016

  • CIM
    Final Wall Stability in Metal Open Pit Mines Using Presplit Blasting

    By Kazem Oraee

    Implementing stable final pit walls in open pit mines during the open pit design phase and mine exploitation has become one of the most important concerns of mining engineers in recent years. Failure

    Aug 1, 2013

  • CIM
    Application of GPR in Canadian Mines

    By F. P. Hassani, A. Hara, M. Momayez

    To be competitive on the international market, the Canadian mining industry must reduce its costs, increase its productivity and maintain a high standard of safety. There is a great need today for imp

    Jan 1, 1996

  • CIM
    Feed Size Changes For Increased Throughput at Newmont Carlin?s Dry Grinding Circuit

    By Adrian Dance

    Newmont Mining Corporation?s Carlin (?Carlin?) operation processes roaster feed through a double rotator, dry grinding mill following secondary crushing. Metso Process Technology & Innovation (?PTI?)

    Jan 1, 2012

  • CIM
    Consolidated rockfill optimization at Kidd Creek Mines

    By Parviz N. Farsangi, Ferri P. Hassani, Allen G. Hayward

    "Kidd Creek Mines places approximately 10 000 tonnes of consolidated rockfill (CRF) daily. Consolidated rockfill comprises sized aggregate mixed with different ratios and amounts of binders. Consolida

    Jan 1, 1996

  • CIM
    Mining strategy for the Retreat Zone at Noranda's Bell-Allard mine

    By V. Falmagne

    The mining sequence at Noranda?s Bell-Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modellin

    Apr 1, 2004

  • CIM
    Case Study – Blind Shaft Sinking for BHP Jansen Project

    By Patrick Rennkamp, Wolf-Dieter Trodel, Andy Fearn

    "The Jansen shafts are completed using purely mechanical excavation. This paper summarises the geology, a description of the shafts, the method used for excavation and the results achieved along with

    Jan 1, 2019