Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Integrated Advanced Grinding Control System at Newmont AHAFO

    By A. Broussaud

    The paper describes the advanced grinding control system implemented at Newmont Ahafo gold mine, Ghana in 2009 and 2010. It shows how the different components of the Advanced Process Control (APC) sys

    Jan 1, 2012

  • CIM
    Improving Melt Cleanliness and Mechanical Properties of AZ91e Permanent Mould Castings with Melt Filtration

    By A. Elsayed

    Lightweight metals such as magnesium show potential in replacing aluminum alloy castings for engine cradles, cylinder heads and transmission cases. Unfortunately, magnesium alloys are susceptible to e

    Jan 1, 2011

  • CIM
    The Discovery and Delineation of the Heavy Mineral Sand Orebodies at Graauwduinen, Namaqualand, Republic of South Africa

    By G. L. Palmer

    "Abstract- ln 1986, anomalous sampling results for heavy minerals were obtained at various sites in Namaqualand on the west coast of the Cape Province. Drilling in 1987 at Graauwduinen penetrated up t

    Jan 1, 1994

  • CIM
    Assessment of Ozone-Pre-Treatment of Sulfide Bearing Gold Ores to Prevent the Impact of Cyanicides

    By Michel Épiney, COREM, Mario Drapeau, Caroline Olsen, Claude Bolduc, Benoit Levasseur

    "Several metal sulfide minerals (such as copper, zinc and iron), generally abundant in precious metal-containing ores, are known to dissolve during the cyanidation process. These unwanted reactions co

    Jan 1, 2016

  • CIM
    Synthesis and hydrogen storing properties of nanostructured Mg-based compounds

    In order to avoid impurity problem and enhance absorption/desorption kinetics of Mg-based compounds, nanostructured Mg-based compounds were synthesized from Mg, Ni and other elemental nanoparticles pr

    Jan 1, 2005

  • CIM
    The Manufacture of Steel Wheel-Centres, Tyres and Axles at Newcastle, N.S.W., Australia

    By C. M. Anson

    This paper describes the progresses used in the manufacture of steel wheel-centres, tyres and axles at the works of the Commonwealth Steel Products Co., Newcastle, N.S.W., Australia. The plant is a

    Jan 1, 1925

  • CIM
    Centralizing Maintenance Resources in Mining Operation

    By Pedram Sahba

    In today?s emerging economy, pooling resources is a growing trend to reduce overall system costs. Two important resources of every maintenance department are repair shops and spare parts. In this work

    May 1, 2013

  • CIM
    New Failure Prediction Method for Underground Excavations

    By D. Milne, G. Snell

    "A new method to predict stope hangingwall failure in underground excavations is proposed. This method compares movement rate for stope hangingwalls, determined from changes in strain or deformation,

    Jan 1, 2018

  • CIM
    Development and Production of X80 Hot-Rolled Thick Steel Strips in WISCO

    By C. -S. Xie, J. -H. Kong

    The microstructure and mechanical properties of X80 hot-rolled thick steel strips with a thickness of 17.5mm produced in Wuhan Iron & Steel Company (WISCO) are introduced in the paper. The steel strip

    Jan 1, 2005

  • CIM
    Current developments at Rio AIgom, Elliot Lake

    By K. D. Hester

    This paper will review the metallurgical aspects of the completed expansion program at Quirke, and the current rehabilitation and refurbishing program at Panel. During the Quirke program, completed a

    Jan 1, 1979

  • CIM
    Characterization and Erosion of Plasma Sprayed Ni-20Cr Coating on a Ni-Base Superalloy Superni 75

    By S. B. Mishra

    Ni-20Cr metallic coating was deposited on a Ni-based Superalloy (3Fe-19.5Cr¬0.3Ti-Balance Ni) by a shrouded plasma spray process; NiCrA1Y was used as a bond coat. Erosion studies were conducted on unc

    Jan 1, 2005

  • CIM
    Pyrrhotite Rejection at the Strathcona Mill

    By J. Coffin, M. Muinonen, D. Fragomeni, R. Multani, C. Deredin

    "Rejection of pyrrhotite from pentlandite is of critical importance to the economics of nickel concentrate production and the main goal of the Strathcona milling operations. A joint team of XPS, Glenc

    Jan 1, 2018

  • CIM
    Suncor Energy Inc. - Oil Sands

    By Brad Bjornson, Geoff Stevens, Mike Ashar, Cliff Britch

    "LocationThe facilities are located 30 km north of Fort McMurray, Alberta (or 470 km northeast of Edmonton, Alberta).Brief Description of OperationThe operation includes the mining of oil sands, extra

    Jan 1, 2000

  • CIM
    Effect of Pressure Depth on the Globulization of AZ91 Magnesium Alloy

    By M. Hajian Heidary

    In this investigation, effect of pressure depth on the globulizations of AZ91 magnesium alloy was studied. Cylindrical samples of AZ91 alloy with 1 cm and 2cm in height and 2.5cm in diameter (H/D = 0.

    Jan 1, 2007

  • CIM
    Optimization Of Refractory Lining Design And Installation Practice To Reduce Vessel Downtime And Maximize Performance Of Anode Refining Vessels

    By A. J. Rigby

    Anode vessels are often relined with refractory every one to two years and a typical reline time can take between 16-20 days. Modem refractory designs using dense, corrosion resistant brick applied di

    Jan 1, 2007

  • CIM
    Is the Double Drum Hoist Still Viable at Depth? Recent Experiences

    By Bennett McLaughlin

    The Penna Shaft is the deepest single?lift shaft in North America. AGNICO-EAGLE started sinking the Penna shaft in 1995 with a hoisting plant capable of hoisting 1 800 tonnes per day from a 2 240-metr

    May 1, 2003

  • CIM
    Process Mineralogy of the Refractory Gold Part of the Lapa Ore Deposit

    By S. Mathieu, R. Mennillod-Blondin, P. Cousin, N. Valle, H. Bouzahzah, P. Marion

    The gold deposit of the Lapa mine has a complex mineralogical gold state with coarse and fine native gold, aurostibite and submicroscopic gold within arsenopyrite. A specific mineralogical characteriz

    Jan 1, 2011

  • CIM
    Experiences with Real Time Equipment Monitoring ? Using Advanced Analytics to Equipment Life and Reduce Costs

    Mining Equipment Challenges Equipment Availability Unplanned downtime Maintenance Costs Secondary damage and catastrophic failures (T282 $750k) Emergency work is 4x the cost of planned work Ins

    May 1, 2013

  • CIM
    Acoustic Emission Monitoring of Fracturing Process of Migmatite Samples

    By Matej Petružálek, Tomáš Svitek, Tomáš Lokajícek

    "Migmatite from the Skalka region (Czech Republic) was chosen as the experimental rock material. It has macroscopically visible plane parallel structure (foliation). The foliation was caused mainly by

    Jan 1, 2015

  • CIM
    Laboratory Investigation of Stress Gradient Effect at Spalling Experiments on Granite

    By L. Jacobsson, J. E. Lindqvist

    A series of laboratory tests were conducted to study stress-induced spalling on medium to coarse-grained granite specimens. The specimens made from cylinders had two manufactured notches on opposite s

    Jan 1, 2015