Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Comparative economics of bacterial oxidation and roasting as a pre-treatment step for gold recovery from an auriferous pyrite concentrate

    By S. R. Gilbert, C. O. Bounds, R. R. Ice

    "Many ores are upgraded to produce auriferous sulphide concentrates (principally pyrite) which are not amenable to direct cyanidation. Often these refractory gold-bearing concentrates contain undesira

    Jan 1, 1988

  • CIM
    Coarse Gold Recovery Using Flotation in a Fluidized Bed

    By Eric Bain Wasmund, Lance Christodoulou, Julio Jairo Carmona Franco, María Fernanda Castillo, Jose Concha

    "A number of technologies are in practice for selectively removing coarse gold from conventional grinding circuits. These circuits are often designed so that the grinding mill output is size classifie

    Jan 1, 2015

  • CIM
    A Novel Separation Process for Detoxifying Cadmium-Containing Residues from Zinc Purification Plants

    By Diankun Lu, Ganfeng Tu, Edouard Asselin, Feng Xie

    A novel separation process for detoxifying cadmium-containing residues arising from zinc hydrometallurgical processes has been developed. An initial investigation indicated that a high concentration o

    Jan 1, 2014

  • CIM
    Closing the loop—Using actual concentrator performance to determine the true value of ore sources

    "The Antamina orebody is a geologically complex, polymetallic skarn located in the Peruvian Andes. A range of copper and copperzinc ores are campaigned separately through the concentrator producing co

    Jan 1, 2005

  • CIM
    New Technology for Hoist Conveyance Monitoring and Analysis

    Many mines in Canada, the US and S. Africa are reaching the hoisting limit. Very little payload will be possible without compromising safety due the excessive weight. It has been suggested (DeLorme, 2

    May 1, 2002

  • CIM
    Seismic Response to Mining at the Brunswick No.12 Mine

    By Brad Simser

    The Brunswick No. 12 Mine is a 10 000 tonne per day producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stopin

    May 1, 2003

  • CIM
    A History of Improvements at the Kemess Concentrator

    By Paul Grady, Martin Froehling, Curtis Mohns, Eliab Roman

    "Since the idea of processing rock to unlock the valuable minerals inside was put into practice, efforts to improve production began. Methods have been learned that allow for operation in environments

    Jan 1, 2005

  • CIM
    Towards a Better Understanding of Stirred Milling Technologies - Estimating Power Consumption and Energy Use

    By Jonathan Allen, Peter Radziszewski

    "Stirred mill technology dates back to 1928 where the idea to use “an agitator and spherical grinding media” was presented. The year 1948 saw the successful application of DuPont’s “sand mill” for pig

    Jan 1, 2014

  • CIM
    Crystallex’s Las Cristinas gold project

    By J. R. Goode

    "The Las Cristinas deposit in Venezuela contains reserves of 12.8 million ounces of gold at a grade of 1.20 g/t (Crystallex, 2004). The deposit comprises fully oxidized saprolite (SAPO) overlying a la

    Jan 1, 2005

  • CIM
    Gold Gravity Recovery at the Mill of Les Mines Camchib Inc., Chibougamau, Québec

    By L. Lui, A. Cauchon, A. R. Laplante

    "The gravity circuit at Les Mines Camchib Inc. consists of two pinched sluices to bleed a feed to one of two 76 cm (30"") Knelson concentrator. The Knelson concentrate is upgraded to smeltable grade w

    Jan 1, 1990

  • CIM
    Electromagnetic Wire-Rope Testing --- Disparate LMA Results, an Ongoing Problem

    By Marcel M. Djivre

    Electromagnetic wire rope testing is the only practical non-destructive method to evaluate the current condition of wire ropes in general, and in the mining industry in particular. The method has been

    May 1, 2004

  • CIM
    Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)

    By N. Coli

    The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant

    May 1, 2009

  • CIM
    COM 2014 Keynote: Process Control Applications in Mining & Metallurgical Plants Symposium Manual Control, Process Automation - Or Operational Performance Excellence? What is the Difference?

    "The mining industry uses many types of mineral and metallurgical plants to produce saleable product from ore mined. Plant design history has left current operations with a mixture of manual operation

    Jan 1, 2014

  • CIM
    Antamina Productivity Increase through Improvements Implemented in the Primary Crushing

    By Carlos León, David Estrella, Javier Linares

    "Recently, Antamina has completed an expansion program of its operations which increased the thoughput in grinding from acapacity of 109 to 130 ktpd. After commissioning, throughput could be exceeded

    Jan 1, 2013

  • CIM
    Application of the SART Process to Heap Leaching of Gold-Copper Ores at Maricunga, Chile

    By Kevan J. R. Ford, Chris A. Fleming, Robert D. Henderson

    "Kinross Gold Corporation’s Maricunga mine in Chile presents an ideal opportunity to apply the SART process to a heap leach operation. Given increasing levels of cyanide complexed copper in current pr

    Jan 1, 2008

  • CIM
    Environmental Stewardship ? How do you balance impact with mitigation?

    By Carol E. Jones

    Outline ? Reclamation is a primary mitigation. ? Understand baseline environment and land use. ? Determine reclamation goals. ? Selecting reclamation technology. ? Determine technical risk. Rec

    May 1, 2008

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • CIM
    Golden Giant Mine Mill Process Description and Operating Highlights

    By R. Tessier, C. R. Larsen

    "INTRODUCTIONOn November 10, 1982 Nor and a Inc signed an agreement with Golden Sceptre Resource Ltd. and Goliath Gold Mines Ltd. to construct a mine and milling facility.The Golden Giant mine is loca

    Jan 1, 1986

  • CIM
    Dynamic Modeling and Virtual Prototype Simulation of the GAP-Oil Sands Interactions

    By Samuel Frimpong

    The interaction of oil sands with a ground articulating pipeline (GAP) system has been simulated with the dynamic model established in this work by combining the multi-body and soil dynamics with the

    May 1, 2004

  • CIM
    The State of Art in Environmentally Sustainable Nickel Smelting: Boliden Harjavalta Nickel Smelter

    By P. Pyykkö, E. Peuraniemi, J. Järvi, P. V. Latostenmaa, V. Törölä, S. Junnikkala

    "Nickel concentrate smelting started in Harjavalta in 1959. First, flash smelting - Peirce-Smith converting route was applied, and the high-grade converter matte was further refined to nickel cathodes

    Jan 1, 2014