Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Electrokinetic and Settling Behaviors of Aurora Oil Sands Tailings

    By C. Liu

    Zeta potentials and settling rates of an oil sands tailings sample taken from Syncrude Canada Ltd's Aurora Stacker Pilot Operation were studied. Two clay minerals, kaolinite and illite, were also

    Jan 1, 2006

  • CIM
    MODERN SEAFLOOR HYDROTHERMAL DEPOSITS - OCEAN RIDGES - On the Nature of Lipids in Hydrothermal Formations at the Broken Spur and the Vent Field of the Mid-Atlantic Ridge

    By V. I. Peresypkin, A. Y. Lein, N. S. Bortnikov, Yu. A. Bogdanov

    "Abstract - The lipid component in hydrothermal deposits of the Logachev vent field, at 14°45_N of the Mid-Atlantic Ridge (MAR) and Broken Spur vent field, at 29°N of the MAR, was studied. Biochemical

    Jan 1, 1999

  • CIM
    Base-Metal Deposits of the Bathurst-Newcastle District: Characteristics and Depositional Models (e2fcbc36-94fa-4bf9-92bb-6227c20c24f4)

    By Steven R. McCutcheon

    "The Bathurst-Newcastle district, a subcircular area approximately 50 km in diameter, contains 37 massive-sulfide Zn-Pb-Cu deposits that have defined tonnages, and has 58 additional significant occurr

    Jan 1, 1992

  • CIM
    On-Stream Analysis by X-Ray Spectrograph

    By P. Shibley, P. R. Clarke

    Since this was an interim report of the initial operation of a long term project it is not available for publication. It is expected when the project is completed a full report of the work will be pub

    Jan 1, 1968

  • CIM
    Robotics and Automation for Oil Sands Bitumen Production & Maintenance

    By M. G. Lipsett

    General Challenges for Mining & Mineral Processing Operations ? Capital-intensive industry ? Ongoing cost pressures ? Remote locations ? Workforce demographics ? Dynamic, unstructured, rugged en

    May 1, 2008

  • CIM
    Fluxing Molten Converter Slags with Spent Potlining (SPL) for Metal Recovery

    By Dawei Yu, Kinnor Chattopadhyay

    In the nickel industry, molten slags produced from a Pierce-Smith converter contain significant amounts of valuable metals in the forms of oxides and physically entrained matte droplets. A slag cleani

    Jan 1, 2015

  • CIM
    Aggregate resource management in New Brunswick

    By D. E. Barnett

    "Paramount to sound aggregate resource management is an awareness of what resources exist. For the past six years, New Brunswick has been conducting granular aggregate resource inventories in and arou

    Jan 1, 1982

  • CIM
    Gibraltar Mine SAG Mill Expansion Grinding Ciruit Design (5e5517e1-bab6-43d2-8866-c7d882036c0e)

    By R. J. Rotzinger, K. W. Major

    The Gibraltar Mine and Mill facility were commissioned in 1972 by Gibraltar Mines Ltd utilizing a flowsheet consisting of two stages of crushing followed by a rod mill / ball mill grinding circuit. Du

    Jan 1, 2012

  • CIM
    The Impact of Operating Cost on Life-of-Mine Costs of Hydrometallurgy Facilities

    By J. R. Porter, C. Panaou

    "A significant effort is expended on preparation of the capital estimate for feasibility studies. The development of the operating cost estimate is usually allocated a significantly smaller budget and

    Jan 1, 2012

  • CIM
    A Study on Anti-Jerk Control of Building Maintenance Robot System

    By Seunghoon Lee

    The increase in the number of higher and larger buildings is expected to require the buildings' outer wall maintenance process, which includes cleaning, painting and monitoring, still depends on

    Aug 1, 2013

  • CIM
    Synthesis of Scorodite Coated in-Situ with Hydrated Ferric Oxide and its Leaching Stability

    By Pingchao Ke, Zhihong Liu

    "To overcome the problem that scoroditeis not stable in neutral and alkaline solutions, we proposed and investigated a synthesis method of scorodite coated in-situ with hydrated ferric oxide in the Fe

    Jan 1, 2017

  • CIM
    Underground water bulkhead construction at Pamour No. 1 mine

    By H. Kalsi

    "IntroductionRoyal Oak Mines Inc. is currently operating the Parnour No.1 mine located 10.5 miles east of Tinunins, adjacent to Highway No. 101. The operation produces gold ore at a rate of 3300 tpd.

    Jan 1, 1994

  • CIM
    Gîtes de wollastonite, province tectonique de Grenville, Quebec

    By G. J. Simandl, H. -L. Jacob, S. Paradis, G. Valiquette

    "Nos travaux de terrain dans le Grenville, effectués dans le cadre d'un projet d'inventaire des gîtes de wollastonite, ont démontré qu'il existe un secteur exceptionnellement favorable

    Jan 1, 1990

  • CIM
    Scraper Loading in the Springhill Collieries

    By Ian L. Price

    Description of the Springhill Coal Field The Springhill coal basin, which lies in the approximate centre of Cumberland county, Nova Scotia, is of Carboniferous age, and forms a syncline plunging to

    Jan 1, 1946

  • CIM
    Developments in slurry pump technology

    By G. A. Davidson, P. G. Williams

    "New developments in centrifugal slurry pump technology are discussed in relation to their importance for improving pump operation and reliability.Experimental data obtained by measuring the velocity

    Jan 1, 1992

  • CIM
    The Co-Fe-S System

    By W. Curlook, L. M. Pidgeon

    THE PURPOSE of this investigation was to study part of the ternary system Co-Fe-S. Jensen ( 1) established the solubility limits of sulphur in pyrrhotite. The compound with 61.7 per cent Fe, correspon

    Jan 1, 1953

  • CIM
    Aunor Mine

    By B. S. W. Buffam

    "The property of Aunor Gold Mines, Limited, is in Deloro township, Ontario, about 3 miles southeast of Timmins. It consists of a group of eleven claims between the Buffalo Ankerite and Delnite mines.I

    Jan 1, 1954

  • CIM
    Journal materials for a water lubricated bearing

    By J. C. Thornley, H. L. J. Drummond

    "Fifty years of wear on the original carbon steel shaft of this hydro turbine necessitated repair operations in 1980. Both austenitic and martensitic stainless steels have been used individually as jo

    Jan 1, 1985

  • CIM
    Implementation of a Hybrid Brattice to Control Dust Dispersion in Underground Coal Mine Faces

    By J. C. Kurnia

    Presence of fine dust in air causes serious health hazard for mine operators resulting in such serious problems as coal workers? pneumoconiosis and silicosis. Major sources of dust appear of course al

    Aug 1, 2013

  • CIM
    Sequential evaluation model of phased exploration data leading to sample optimization - A case study of Rampura-Agucha zinc-lead deposit, India

    By S. N. Bhatnagar, S. K. Haldar

    "Mineral exploration is an expensive speculative venture and calls for optimization of sampling. Exploration is generally planned in grid pattern to be conducted in phased manner. The objective of any

    Jan 1, 1987