A Holistic Viewpoint for Selecting the Vertical Haulage System – Shafts and ConveyorsBy R M. Krek
The haulage system used to convey ore from an underground mine to a surface stockpile at the mine process plant is a vital component of the mine’s overall infrastructure and economic viability. The sy
Mar 24, 2014
-
Strategies for Mine Planning and DesignBy S Coward, C Xu, P A. Dowd
"This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif
Nov 24, 2014
-
Defying Gravity – Brownfield Continuous ImprovementBy J Robinson, L D’Uva
"The Gold Fields group and Gekko Systems have successfully worked together on multiple projects, including at the St Ives, Agnew and Granny Smith operations in Western Australia, and the Damang operat
Oct 10, 2016
-
Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra DeltaBy P Clark
This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project
Mar 8, 2011
-
Clem Jones Tunnel – A Study of the use of Precast Concrete for Quick and Efficient ConstructionBy M Hawkins
The Clem Jones Tunnel (formally known as the North-South Bypass Tunnel), a A$2.88 billion road tunnel project in Brisbane, Queensland, was successfully completed almost seven months ahead of schedule.
Mar 8, 2011
-
Optimum Management of Truck Tyres in a MineBy S Casas Castellanos
"Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o
Nov 15, 2016
-
Alumina Reduction Challenges in the Benefi ciation of Low-Grade Haematite Iron OresBy N Murthy
Alumina is a major impurity in Australian iron ores and as the higher grade ores become depleted there will be a stronger focus on treating lower grade haematite/goethite ores and developing suitable
Jul 11, 2011
-
Integrating Blastholes into Exploration Data to Improve Coal Recovery and ModellingBy H Stedman
Integrating exploration and operational blastholes into one database significantly enhances geological modelling. Benefits include: improved coal predictions, stronger interpretation of structurally c
Aug 18, 2014
-
Profitable and Productive Partnerships ù Optimising Coal Recovery in Close Proximity to the Hunter RiverBy D Stacey, J Matthews
Hunter Valley Operations in partnership with Orica Explosives designed a process to optimise coal extraction at depths greater than 65 m below the Hunter River in a safe and cost effective manner. The
Jan 1, 2001
-
The Solid Foundation of a CareerThe following paper outlines the types of employment immediately available to graduates following their university degree, a discussion on mine manager requirements, mentions career advancement and ti
Jan 1, 2006
-
Cybulski Revisited - Lessons on DustBy D R. Chalmers
Coal dust explosions have occurred in coal mines across the world. The Mitsui Miike Coal Mine disaster in 1963 was an example of how this hazard was not managed effectively, resulting in the loss of 4
Jul 1, 2013
-
Copula-Based Spatial Modelling of Geometallurgical VariablesBy G N. Musafer, M H. Thompson, R C. Wolff, E Kozan
The most important aspect of modelling a geological variable, such as metal grade, is the spatial correlation. Spatial correlation describes the relationship between realisations of a geological varia
Sep 29, 2013
-
The PUTRA Light Rail Transit (LRT) System Two in Kuala Lumpur: Tunnelling a Case StudyOn 15 August 1998 the first section of the PUTRA LRT system was opened to the public as a free service prior to official commencement of revenue service on 1 September 1998. It is a remarkable achieve
Jan 1, 1999
-
Reduction in Diesel Particulate Matter at Oaky NorthBy A Melloy, D Holt, M Jurak
Oaky North is AustraliaÆs highest producing underground coal mine. In 2011, the mine produced 8.7 Mt of high-quality coking coal. The high quantities are a result of the constant strive for optimising
Jul 1, 2013
-
Some considerations on rock dynamics issues in MarsBy Ö Aydan
Rock dynamics is one of the most important topics in the field of rock mechanics and rock engineering. The spectrum of rock dynamics is very wide and it includes the failure of rocks, rock masses and
Nov 29, 2022
-
From paper to bytes – digital mapping implementationBy A Whaanga
The use of photogrammetry has greatly increased the accuracy of 3D mapping underground. However, this has not reduced the need or desire for geologists to produce plans and sections showing an interpr
Mar 22, 2022
-
Evaluation of the Blue Cube MQi Slurry Analyser for Application in an Advanced Control System for the Optimisation of a Gold Sulfide Flotation CircuitBy D van der Spuy, T Kewe, K Keet, N Moffatt, A P. Paine
The Blue Cube Mineral Quantifier Inline (MQi) instrument uses reflective light spectroscopy and advanced chemometrics to measure mineral or elemental grade in a slurry line. The instrument takes scans
Sep 1, 2014
-
Benchmarking Comminution Energy Consumption for Improved EfficiencyBy G R. Ballantyne, M S. Powell
A comprehensive Australia-wide survey of comminution energy consumption at copper and gold mines was presented by the authors at the 11th AusIMM Mill Operators’ Conference 2012. The database has been
Sep 1, 2014
-
A System of Diluting Methane to Safe LevelsBy R Hughes
"Spring Creek Mine uses high pressure water to extract the thick Main seam in the Upper Rewanuicoal measures. The extraction method results in the creation of large voids which collapsespontaneously.
Jun 1, 2012
-
Predicting and modelling Bond Work Index using chemistry (as a proxy for mineralogy)By K Gardner, R Fraval, V Singh
Using new technology to create optimised infill drill programs in underground or open pit settings, it is possible to quantify the value of a drill program. The computer designed programs are optimise