Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Three Decades of Gold Production at the Newmont Tanami OperationsBy A Cranley, A Giblett, S Thacker
The Newmont Tanami Operations are located in the Northern Territory, approximately 550 km north-west of Alice Springs. The Granites process plant commenced operations in 1986 as a 300?000 t/a ball mil
Sep 1, 2014
-
A Multidisciplinary Approach to the Optimisation and Control of a Copper-zinc Grinding and Flotation CircuitBy D Hatton, S Wilson, F Orrante, M Taghimohammadi, F van der Walt, N Arslan, M Westcott
"Cayeli Bakir Isletmeleri is an underground copper-zinc mine in turkey. The ore is highly variable with feed grades ranging from 1–4 per cent copper and 1–10 per cent zinc. Due to this variability, or
Oct 10, 2016
-
Some Metallurgical Aspects of the Kidston Gold MineBy Plyley WF
Kidston Gold Mine is a 3.5 million tonnes per year operation located 280 kilometres west of Townsville, Queensland. Kidston's ore body consists of 44.3 million tonnes graded at 1.79 grams per ton
Jan 1, 1986
-
The impact of rip lines on erosion at the Ranger Mine SiteBy M J. Saynor, J B. C Lowry
The Ranger Uranium Mine is located in the wet-dry monsoonal tropics approximately 250 km east of Darwin in the Northern Territory of Australia (Figure 1). Mining of open-cut ore bodies commenced in 19
Jul 25, 2018
-
The Introduction and Application of Carbon-in-Pulp in a Heap Leach ProjectBy Mann LD
The Haveluck gold deposit, located 2.5km north of Meekatharra, contained 1,284,000 tonnes at an average grade of 1.8 g/t gold of drill delineated proved and probable ore prior to commencement of pro
Jan 1, 1982
-
Recent Developments at Olympic DamThe Olympic Dam deposit is located some 600 km north of Adelaide in South Australia. It was discovered in 1975 by Western Mining Corporation and in 1979 a joint venture was formed with British Petr
Jan 1, 1996
-
Achieving 435-2540 Tonnes Per Shift from Continuous Miner Sections, A Report on the USAÆs Most Productive Coal MinesBy Kissell F. N, Volkwein J. C
The U.S. Department of Interior's Bureau of Mines has the opportunity to visit many U.S. mines, including some that claim 2 to 5 times the national average of 334 raw tonnes/unit shift (tps)
Jan 1, 1988
-
Geology of the Renison Bell Tinfield TasmaniaIn the Renison Bell area of western Tas mania, a series of Lower Cambrian quartzites, shales, carbonate beds ("dolomites"), cong- lomerates, tuffs and argillites have been folded into a broad monocl
Jan 1, 1973
-
Modelling of Multiple Narrow Veins from Geology to Mining - the Tasmania Reef, Beaconsfield, TasmaniaBy P B. Hills
This paper discusses the computerisation of the drill hole database, some historical records and the creation of a three-dimensional model of the gold bearing structures for resource estimation and mi
Jan 1, 1999
-
Big Bell Coming Back for Seconds, Thirds and FourthsIn October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t
Jan 1, 1998
-
Newmont Tanami Operations – Tailings Storage FacilitiesBy S Thacker, M Noakes
The Newmont Tanami Operations (NTO), formerly the Granites Gold Mine, commenced operation in the mid-1980s with tailings deposition evolving over the past three decades as production has increased and
Jul 27, 2015
-
Making Studies Work – Organisation, Communication and ManagementBy P McCarthy
"This paper is based on 30 years of involvement in feasibility studies as a participant, study manager and the leader of a firm that provides study components and overall study management. The followi
Mar 8, 2016
-
Simulation Modelling of Grade Variability for Iron Ore Mining, Crushing, Stockpiling and Ship Loading OperationsBy K Jupp, T J. Howard
Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia, about 50 km north of the town of Southern Cross. Ore is trucked from three geographical
Jan 1, 2009
-
Plant Design for ClosureBy D P. Murphy, R F. Dewhirst
Traditionally closure has been seen by the Resource sector solely as a green or an environmental issue, focused primarily on the requirement to rehabilitate the site following cessation of production
Jan 1, 2006
-
Productivity improvement through collaborative shift planning and trackingBy E Deucker, A White
Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their
Oct 16, 2017
-
PanAust Limited’s approach to mine waste and tailings stewardshipBy L P. Trout, D G. Reid
PanAust Limited (PanAust) has successfully constructed and commissioned two mining operations in Lao PDR over the past decade and undertaken major studies for three new mine developments. The managem
Jul 23, 2018
-
Specification and Selection of Hand-held Gas Monitors (Detectors) for Underground MinesBy D J. Brake
There are many sources of gas in underground mines including development and production blasting, strata gases, spontaneous combustion, diesel equipment, chemicals used for a wide range of functions,
Aug 31, 2015
-
Using Dynamic Simulation Throughout a Process Plant's Life CycleUsing Dynamic Simulation Throughout a Process Plant's Life Cycle
Sep 13, 2010
-
Differences between the Engineering Cultures of Australia and BrazilBy C Fountain
Australian mining and engineering companies have increasingly been investing in the mining industry in Brazil. It is a country of enormous mineral and agricultural wealth, with a well-established mini
Aug 8, 2011
-
Future skills and workforce evolution – training and skills development for mining operation engineer and drill and blast engineer in surface mineral mine PT Indo Muro KencanBy H Utama, R Heryadi
PT Indo Muro Kencana (PT IMK) is a surface gold and silver mine located in Mt. Muro area, Central Kalimantan province, Indonesia. The mining operations of multiple open pits using combination of excav
Sep 1, 2024