Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimal slope profiles for maximum mine pit-wall steepness in banded iron formation rocks

    By S Utili, A Agosti

    The Overall Slope Angle (OSA) of pitwalls plays a crucial role in the financial return of an open pit mine. In current practice, pitwall profiles are designed to be planar in cross-section within each

    Nov 29, 2022

  • AUSIMM
    Bauxite Residues ù A High Volume Resource

    By E Jamieson

    For a number of years, Alcoa World Alumina Australia (Alcoa) has been investigating opportunities to produce economically viable products from bauxite residues. Three of these potential products are d

    Jan 1, 2004

  • AUSIMM
    Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the Congo

    By M G. Millad, M Zammit

    The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa

    Aug 18, 2014

  • AUSIMM
    Automated Sampling of Iron Ore for Analysis at the Saldanha Iron Ore Terminal in South Africa

    By P Hofmeyr, D Pretorius

    Iron ore, which is transported by rail from the iron ore mines at Sishen in the Northern Cape, to the Saldanha Iron Ore Terminal in the Western Cape, needs to be analysed while loading to be exported.

    Aug 21, 2012

  • AUSIMM
    A Simplified Creep Analysis for Low Strength Seams in Rock Pillars

    By M Habte

    This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a

    Mar 8, 2011

  • AUSIMM
    Chamfered backs to improve open stope stability in poor ground conditions

    By G Capes

    A novel open stope design approach is presented that delivered improved performance in a mining area with poor ground conditions at the Olympic Dam mine. During 2019, a large open stope had an unplann

    Mar 29, 2023

  • AUSIMM
    An empirical system for primary and secondary support in US coalmines

    By C Mark, Z Agioutantis

    This paper presents an empirical design methodology that is based on successful US roof support systems using both primary and secondary support in coal mining entries and intersections. The recent na

    Nov 29, 2022

  • AUSIMM
    Structure Response of a Brick Veneer House to Open Pit Coal Mine Blasting

    By A B. Richards

    A brick veneer house located on a open-pit coal mine lease has been subject to ground vibration levels of up to 222 mm/s, and air vibration levels of up to 145 dBL. The dynamic response of the structu

    Jan 1, 2001

  • AUSIMM
    Simulating Block Cave Secondary Breakage ù An Application of Information and Operations Management Tools in Mass Mining Systems

    By M Scoble, E Rubio

    The re-engineering of manufacturing production systems has demonstrated the benefits from using production information for optimising processes. This paper explores the techniques and issues in the ac

    Jan 1, 2000

  • AUSIMM
    Modelling the Impact of Flash Flotation from Batch Cell Flotation Tests Using Limn

    By P Holtham, R Dunne, D Stoll

    Flash flotation is a process designed to remove coarse, liberated, fast floating minerals from hydrocyclone underflow. Irrespective of liberation, coarse particles would normally remain in a grinding

    Oct 29, 2012

  • AUSIMM
    Isasmelt - A 250 000 TPA Copper Smelting Furnace

    MIM Holdings Limited (MIM) committed to a long-term future in copper in the Carpentaria Mineral Province in 1996 with the development of the Enterprise and Ernest Henry mines, and an upgrade of MIMsÆ

    Jan 1, 1998

  • AUSIMM
    Truck Fleet Utilisation and Fuel Saving in Aitik

    Aitik, a Boliden owned and operated open pit mine located in northern Sweden, will expand production from 18 Mt per year today to 36 Mt per year copper ore during 2010. The challenge for the mine oper

    Jan 1, 2007

  • AUSIMM
    Geopolymer Concrete for a Sustainable Future

    By S E. Wallah, D Hardjito, B V. Ran

    The manufacture of Ordinary Portland Cement (OPC) is not only energy-intensive but also releases a significant volume of carbon dioxide (CO2) to the atmosphere. In addition, OPC in concrete often caus

    Jan 1, 2004

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Assessing the effectiveness of erosion predictions from a landform evolution model with field observations from a rehabilitated landform

    By G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard

    Landform evolution models (LEMs) can assess the effectiveness of landform designs applied to a rehabilitated landform by predicting where erosion may occur. Here, we compare erosion predictions produc

    Aug 2, 2023

  • AUSIMM
    Increasing Capacity and Efficiency of Grinding Circuits with High Frequency Screens

    By J Wheeler

    The objective of this paper is to examine the operation of high frequency screens in closed circuit grinding, where the outcomes achieved indicate favourable economic gains at the comminution stage an

    Aug 8, 2011

  • AUSIMM
    Optimising Flow in the Mining Value Chain

    By A Dunne, R Kruger, H Coleman, P G. Laurens

    External and internal challenges in mining are increasing the difficulty and complexity of operating mines. The external mining environment has a big impact on mining operations and is driving the foc

    Jul 13, 2015

  • AUSIMM
    Utilising Electronic Detonators at Hail Creek Mine for ‘Dynamic Buffering’

    By A Baker

    Hail Creek Mine is an open cut coal operation owned by Rio Tinto. It is located 120 km south west of Mackay in the Bowen Basin region of central Queensland. Opened in late 2003, the mine produces two

    Nov 8, 2011

  • AUSIMM
    Investigation on Collector Optimisation in the Reverse – Iron Ore Flotation

    By M S. Cassola

    It’s expected that the world economy will face a stable and continuous growth in the demand of iron ore, reaching more than two billion tonnes per year within the next year. After decades exploiting r

    Jul 11, 2011

  • AUSIMM
    Vibration control blasting for low stability final walls

    By G Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Nov 30, 2018