    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • AUSIMM
    Dilution Control in Southern African Mines

    The economic viability of many Southern African massive mining operations is threatened by excessive dilution. In many operations currently in progress, some stopes are experiencing as much as 115 per

    Jan 1, 2000

  • AUSIMM
    Laboratory evaluation of ventilation effects on the self-heatingincubation behaviour of high volatile bituminous coals

    By B Beamish

    The concept of a ‘critical velocity zone’ in the longwall goaf environment for the development of a spontaneous combustion event has been supported by numerical modelling. However, there is no experim

    Oct 12, 2022

  • AUSIMM
    The Integration of Geometallurgy with Plant Design

    By G Harbort

    Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat

    Aug 8, 2011

  • AUSIMM
    Study on Improving Roasting Behaviours and Metallurgical Properties of Brazilian Hematite Pellets by Adding Magnetite with High Sulfur Content

    By Z Li, J Pan, D Zhu, W Zhou

    In order to enhance the roasting behaviours and metallurgical properties of hematite pellets, which have the problems of high roasting temperature and low compressive strength, a process of producing

    Aug 12, 2013

  • AUSIMM
    Blasting Near Mine Surface Infrastructure

    By A J. Moore

    Blasting operations in open cut mines results in airblast, ground vibration and rock movement with the potential for wild flyrock. In some mines there is a trend towards blasting closer to established

    Nov 8, 2011

  • AUSIMM
    Acid Rock Drainage Prevention Using Inert Gas Mixture Technology

    By H Barrie, L Ameglio

    "Current methods for acid rock drainage (ARD) mitigation revolve around insulation of the waste from oxygen in the atmosphere with water and dry (soils and liners) covers. Both are of limited effectiv

    Jul 27, 2015

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • AUSIMM
    Research and Application of New Dust Control Technologies for the Iron Ore Industry

    By S Wangchai, D B. Hastie, P W. Wypych, A P. Grima

    Industries that handle and process ‘dusty’ ores are facing increasingly difficult challenges to ensure sustainable operation and development. Most existing dust-control measures treat only the symptom

    Jul 13, 2015

  • AUSIMM
    Economic recovery and upgrade of metals from middling and tailing streams

    By M Hourn, G Anderson, V Lawson, P Voigt, D Mallah

    As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flow sheets to achieve saleable concentrate become more difficult to design and construct.

    Sep 11, 2017

  • AUSIMM
    Driving improvements to underground diamond drilling effectiveness through real-time implicit modelling at Olympic Dam

    By J Taylor, M Smith, A Tunnadine, D Nikolakopoulos

    As Olympic Dam rapidly expands into the Southern Mine Area (SMA) the Mine Geology team has concurrently ramped up underground diamond drilling to sustain rates of above 175 km/a. With >10 underground

    Mar 22, 2022

  • AUSIMM
    The Influence of Charge Distribution on the Grindability of the Blasted Material

    By J Seccatore, G Sadao, M Cardu, G De Tomi, L Finoti, F Galvão, J Romero Huerta, A Rezende, J Bettencourt

    In the mining industry, rock blasting can be considered as the first phase of comminution. The downstream phases of comminution are mechanical, and consist in consecutive stages of crushing and millin

    Aug 24, 2015

  • AUSIMM
    Applications of Fine Screens in Grinding Circuits

    By J E. Wheeler, S B. Valine, L G. Albuquerque

    It has long been known that closed circuit grinding with a classifier improves grinding efficiency, reduces unit specific power consumption, and reduces over grinding. The classification device remove

    Oct 29, 2012

  • AUSIMM
    The Status of Mine Water Pollution in South Africa

    This paper presents an overview of the current status of mine water management in South Africa. The regulatory framework within which mine water management operates is set out, based on the principles

    Jan 1, 2003

  • AUSIMM
    Opportunities and Constraints for Regional Resource Synergies in Minerals Processing Regions

    By S Harris, A Bossilkov

    The Kwinana (Western Australia) and Gladstone (Queensland) industrial areas are among the few dozens of heavy industrial areas globally that demonstrate significant levels of regional resource synergi

    Jan 1, 2006

  • AUSIMM
    Strategic Optimisation at Sierra Rutile - A Case Study in Maximising Project Value

    By P Myers, T Elkington, S Wonday

    Sierra Rutile LimitedÆs (SRL) heavy mineral sand mining operation in Sierra Leone, West Africa, is embarking on a new phase of its life. After confronting many challenges during the 1990s and 2000s, S

    May 24, 2012

  • AUSIMM
    Critical control management – our journey so far and the road ahead

    By A Deakin

    It has been almost a decade since the release of the International Council of Mining and Metals (ICMM) Health and Safety Critical Control Management: Good Practice Guide (2015a). During this time the

    Apr 16, 2024

  • AUSIMM
    Lighting up the dark – the use of 3D seismic to optimise mine plans at structurally complex Blackwater mine

    By N Pranoto, E Lawell, T Dean, M Grant

    The Goonyella Riverside Mine is located 30 km north of Moranbah in Central Queensland, Australia. Recent mining activities have exposed the north–south striking Kenya and Zimbabwe thrust Faults. These

    Mar 22, 2022

  • AUSIMM
    Flotation Mechanism Design for Improved Metallurgical and Energy Performance

    By R Coleman

    The flotation mechanism plays a key role in the flotation process. It is used to provide the contact between solid particles and bubbles and also the energy for these particles and bubbles to attach.

    Aug 8, 2011

  • AUSIMM
    Development and Testing of a Small-Scale Uranium Leach for Geometallurgical Applications

    By N L. Turner, K Ehrig, V Liebezeit, D J. Robinson, L L. Kuhar, N Francis

    Conventional industry tests used to determine leach recoveries are often fully monitored and may be time-consuming and expensive. Such tests may be limiting in geometallurgical applications where larg

    Sep 29, 2013