Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Roof characterisation for hazard planning at Oaky North mine using geophysical dataBy B Vorster, T Medhurst, A Huey
Roof conditions at Oaky North Mine can be prone to stress related damage and/or time dependent degradation. The ability to identify these areas prior to mining has proved challenging using traditional
Nov 29, 2022
-
Upgrading the Gravity Circuit at Marvel LochBy W Newton, J Price
This paper outlines the design, justification and performance of a gravity circuit upgrade at the Marvel Loch treatment plant. The design of the upgrade was simple but effective. The key components of
Jan 1, 2000
-
Study on change in mould slag characteristics during casting Ti containing steel gradesBy M Ranjan, C R. Borra, P Palai, P P. Sahoo
Change in mould slag composition during casting of medium alloy steel is caused by the redox reaction between molten steel and mould flux. Mould flux generally contains a certain amount of SiO2, but e
Aug 21, 2024
-
Multisource rock characterisation at microscale for a better understanding of processing characteristicsBy B Bonfils, P Lois Morales, C Evans
One of the main challenges for current and future mining and processing methodologies is to understand the characteristics of the rock so that its behaviour in one or more parts of the mining process
Nov 21, 2018
-
Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for æGoldÆWMC Limited, owner/operator of Olympic Dam, the worldÆs largest underground uranium mine and the fourth largest underground copper mine has now completed an expansion that has been classed as a benchm
Jan 1, 2000
-
Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the DogBy J Jackson, D C. Curry, A C. Keith
Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a
Sep 29, 2013
-
Characterisation of Metal-Containing Waste Products in Relation to Retreatment Methods for Metal Recovery and RecyclingBy J T. Woodcock
This paper discusses characterisation techniques that can be applied to complex waste products from metal production and processing operations with the aim of devising treatment methods for upgrading
Jan 1, 2004
-
Planning the Extraction of the Lead Orebodies Below 15 Level at Mount IsaBy Clifford C. E
The Black Star and Racecourse orebodies below 15 level contain a major portion of the primary silver-lead-zinc ore reserves of 56 million tonnes at 150 g/t Ag, 6.4% Pb and 6.5% Zn at Isa Mine. Extr
Jan 1, 1979
-
High Temperature Interactivity of Iron Ores in the Cohesive Zone of the Blast FurnaceBy X L. Liu, W Huang, J M. Zhu, S L. Wu
The shape, position and thickness of the cohesive zone have a great influence on the operational performance of the blast furnace. Many researchers have found that the high temperature properties of i
Jul 13, 2015
-
Drilling and Blasting Techniques in Shallow Manganese Ore Deposits at Groote Eylandt û Present Performance and Future OutlookBy Barber J
The manganese ore of Groote Eylandt is a shallow sedimentary deposit of Cretaceous age. There are a number of deposits which vary greatly in ore texture, density, percentage of matrix and thickness
Jan 1, 1974
-
Opportunities and Constraints for Regional Resource Synergies in Minerals Processing RegionsBy S Harris, A Bossilkov
The Kwinana (Western Australia) and Gladstone (Queensland) industrial areas are among the few dozens of heavy industrial areas globally that demonstrate significant levels of regional resource synergi
Jan 1, 2006
-
Closure Planning Lessons Learnt from the Century MineBy J Crosbie, M Lord, R Bitencourt, P Defferrard
The MMG Century mine, which is the largest zinc/lead mine in Australia, began operating in 1999 and ceased mining from the open pit in July 2015, with processing completed in early 2016. Closure plans
Jun 22, 2016
-
Spatial distribution of geohazards in Western Australia and Imposed risks to tailings storage facility inventoryBy J Penman, N Turner, H Liu
This paper aims to present a snapshot of the risk profile for tailings storage facilities within Western Australia by comparing the spatial distribution of known facilities against common geohazards s
Jul 1, 2021
-
Online FTIR analysis for improved efficiency in alumina productionBy K Haroon, J D. Speed, S P. Wood
Online analysis of continuous and batch processes has seen a dramatic increase in recent years, with examples ranging from petrochemicals to pharmaceuticals, to industrial biotechnology and food and d
Aug 24, 2022
-
Mentoring and Your CareerYoung professionals are riding the current wave of high demand for their services and relatively little competition for placements. The attraction and retention of quality incumbents has therefore bec
Jan 1, 2006
-
Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final DesignBy E C. F Hamman
Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock
Jan 1, 2007
-
Telfer Processing Plant Upgrade - The Implementation of Additional Cleaning Capacity and the Regrinding of Copper and Pyrite ConcentratesBy D R. Seaman, B Adamson, F Burns, B A. Seaman, P Manton
The Telfer concentrator, located in the Great Sandy Desert of Western Australia, consists of a dual train gold/copper operation processing ore from one underground and, currently, two open pit mines w
Oct 29, 2012
-
Design and Construction for the Widening of the M2 Norfolk Twin TunnelsBy A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Use of Anchored Gaskets in Segmented Bored TunnelsBy A Roseman, T Gruber
Traditional methods for installing gaskets for segmented bored tunnels have relied upon different bonding procedures with adhesives that carry a series of disadvantages to segment producers. Fixation
Sep 17, 2014
-
A Study on the Impact of Utilising Sea Water for Wet Concentration of Beach Minerals Deposits on the Recovery and Quality of Ilmenite Produced by High Tension SeparationBy C Swamydas
VV Mineral (VVM) group of companies is the largest and the first private producer and exporter of beach sand mineral products in India. During 2010, the company produced and marketed around 750 000 to
Oct 5, 2011