Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Cemented Rock Fill for Extraction of High-Grade Crown Pillars at Crusader Gold Mine

    By M Dorricott

    This paper describes the design, construction and performance of sill pillars using cemented development mullock at the Crusader Gold Mine. The orebody is some 35 m - 60 m in length, 5 m - 8 m wide, d

    Jan 1, 2002

  • AUSIMM
    Putting Geology and Engineering Back into Resource/Reserve Determination

    By M Darvall And R Fare, D Dormer

    The Argo Archaean lode gold deposit is hosted within a structurally complex shear zone system, 70 km south of Kalgoorlie, and 3 km west of the crustal-scale Boulder û Lefroy Fault. Argo is an active u

    Jan 1, 2006

  • AUSIMM
    Microbiology of an Industrial-Scale Chalcocite Heap Bioleaching Operation

    By J J. Plumb, P D. Franzmann

    A study was conducted to describe the microbiology of the MICCL Monywa chalcocite heap bioleaching operation. Microorganisms were detected in the heap using culture-based techniques and cultureindepen

    Jan 1, 2004

  • AUSIMM
    Glencore Mount Isa lead zinc flotation circuit – experiences from the implementation of model predictive control

    By A Price, D Okle, K Brooks

    The operation of flotation plants has been improved over the years by use of fundamentally based design techniques, a better understanding of reagent chemistry, online metal analysis and the use of di

    Aug 29, 2018

  • AUSIMM
    Do You Understand Your Legal Obligations in the Industry?

    Most new engineers in the mining industry do not realise the importance of legal obligations. During investigations the first question you are asked is: Do you have any proof or evidence? The smallest

    Jan 1, 2007

  • AUSIMM
    Generating Synthetic Data for Simulation Modelling in Iron Ore

    By J E. Everett, K Jupp, T J. Howard

    Simulation modelling is a practice commonly used in the mining industry to evaluate alternative process designs. Such modelling is typically undertaken as an optimisation study to increase the efficie

    Sep 29, 2013

  • AUSIMM
    An Investigation of the Corrosive Impact of Groundwater on Rock Bolts in Underground Coalmines

    By P Craig, A Crosky, P C. Hagan, E Elias, B Hebblewhite, S Saydam, D Vandermaat

    "Premature failure of rock bolts has been recorded at twelve underground coalmines over the past 15 years in Australia. Over the last four years, UNSW Australia has been conducting an Australian Resea

    Nov 5, 2014

  • AUSIMM
    Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG

    By A Atkins

    Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves

    May 5, 2022

  • AUSIMM
    An Ecological Approach to Koala Conservation in a Mined Landscape

    By R Wheeler, E Stalenberg, J Lemon, M S. Crowther, D Lunney, K Ross

    Gunnedah, in north-western New South Wales (NSW), including the town, the surrounding Liverpool Plains and the Pilliga forests to the west, are currently the subject of intense mining interest for coa

    Jul 10, 2012

  • AUSIMM
    The relationship between the magnitude of impact velocity per impulse and cumulative absorbed energy capacity of a rock bolt

    By B Crompton, A Berghorst, G Knox

    Laboratory-based dynamic testing provides an invaluable tool in the development of rock bolts for use in highly stressed, burst prone rock masses. While in most cases the laboratory-based test method

    Nov 30, 2018

  • AUSIMM
    Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds

    The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise

    Jan 1, 1998

  • AUSIMM
    A Change in Graphite Depressant to Improve the Recovery of Zinc at MMG Century Mine

    By R Wynn, N Stoitis, R A. Lauten, H Liang

    At the Century mine in North West Queensland, MMG produces lead and zinc concentrates. The current production rate is close to 500 000 t of zinc per annum. Graphite is the main gangue in the orebody a

    Sep 1, 2014

  • AUSIMM
    The importance of the curing stage in the fixation of arsenic in pressure oxidation

    By M Chen, W S. Ng, Y Liu

    In the processing of refractory gold-bearing sulfides, pressure oxidation (POX) is commonly known for its role in liberating the gold in solid-solution via oxidation of the sulfide occlusions. For dep

    Aug 24, 2022

  • AUSIMM
    The Future for Ilmenite Beneficiation Technologies

    By R K. A Taylor

    The growth in production of beneficiated ilmenite products has been one of the most significant trends in the titanium feedstock industry over the past 30 years. In this period, the production of tita

    Jan 1, 2001

  • AUSIMM
    Recent advances in tailings testing methods

    By D J. Williams

    The majority of surface tailings storage facilities continue to employ sub-aerial tailings slurry deposition. Surface TSFs are typically sized and operated in a way to minimise the initial capital cos

    Jul 23, 2018

  • AUSIMM
    Control of Water Discharge From Mine Ventilation Shafts

    Problems caused by water discharge from surface mine ventilation shafts can be significant and are usually unforseen. The discharged water is often hyper-saline or acidic and can cause environmental d

    Jan 1, 2002

  • AUSIMM
    Special Purpose Simulator for Improved Estimation of Day-to-Day CIL/CIP Recoveries

    Sampling of CIL/CIP circuits is typically done by compositing samples of feed and tails over eight or 12 hour periods. As the residence time in the leaching tankage may be approximately 20 hours, the

    Jan 1, 2006

  • AUSIMM
    NO2:NOx Ratios in Australian Road Tunnels

    By P Gehrke, S O’Gorman

    The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire

    Sep 17, 2014

  • AUSIMM
    Effect of mud farming on the dewatering of bauxite residue

    By D J. Williams, C Zhang, F E. Herrera Cabrera

    Farming on bauxite residue using screw propelled equipment (SPE) has been commonly practised to accelerate dewatering and as it promotes consolidation and enhances storage capacity. However, it is unc

    Jul 1, 2021

  • AUSIMM
    The Influence of Liner Wear on Milling Efficiency

    By P Toor

    Due to the high energy consumption of milling, it is desirable to improve the efficiency of this process. One alternative to reduce energy and material consumption while optimising production yield in

    Aug 8, 2011