Recovery of Gold from Refractory Ores and Concentrates Using the Sirosmelt ReactorBy Floyd J. M
The recovery of gold from refractory ores and concentrates can be achieved in a number of ways using roasting and leaching procedures. The Sirosmelt system introduces a new approach to the recover
Jan 1, 1987
-
Iron Ore Sintering Research at Different ScalesBy J Khosa, J Manuel
Iron ore sintering is very complex with many interdependent variables. For the same ores, the sinter quality and sintering performance may vary significantly with the scale at which the sintering test
Jan 1, 2007
-
Comparison between Gaussian Processes and Dynamic Time Warping for Classification of Marker Shales in Iron Ore DepositsBy A Melkumyan, K Silversides
The banded iron formation-hosted iron ore deposits located in the Hamersley Ranges of Western Australia contain marker shales that are used to distinguish lithology for geological and orebody mapping.
Nov 24, 2014
-
Process Mineralogy as a Tool in Modelling Mineral Processing OperationsBy T Vizcarra, G Sandoval, C L. Evans
One of the challenges in the development of mineral processing simulators is modelling the liberation characteristics of particles produced by comminution circuits. Understanding the mineral character
Jan 1, 2008
-
Mine Development at the Whenan Shaft, Olympic Dam Project, South AustraliaThe Olympic Dam Project constitutes a major resource of Copper and Uranium and has been under intensive evaluation since the discovery in 1975.A 500 metre deep rectangular shaft has been sunk into the
Jan 1, 1985
-
XCT investigation on the generation of fatigue in autogenous grinding pebbles and its contribution to pre-weakening before fractureBy J Kuva, M Parian, B I. Pålsson
One of the main factors affecting the suitability of an ore for autogenous grinding is the ore’s competency, ie providing enough critical stones for the grinding process. Several experimental test rou
Aug 24, 2022
-
Modelling of height of connective fractures during longwall miningBy D Adhikary, M Khanal, B Poulsen, H Guo
During longwall mining, the ability to reliably estimate the height of longwall mining-induced fractures is critically important in order to effectively manage mining-induced water inflows and aquifer
Nov 30, 2018
-
Integral Pressure Strip/Electrowin Circuit for Gold Recovery from Activated CarbonBy Macaulay J
The recovery of gold from cyanide liquors is frequently effected by using activated carbon. Process economics however require non destructive methods of gold extraction from the carbon so that it may
Jan 1, 1984
-
Real-Time Image Analysis of Size and Shape Distributions of Rock FragmentsAn image analysis system has been built which automatically digitizes camera input of rock fragments, analyses the digitised data to determine the sizes and shapes of the rock fragments, and outputs
Jan 1, 1988
-
Improving the Performance of Precipitator Tanks in an Alumina Refinery Using CFD ModellingBy A Manzoori, M T. Shadloo
This paper describes a CFD modelling study which was carried out to investigate possible improvements in the design of an alumina precipitator tank at the Jajarm plant of Iran Alumina Company. In part
Jan 1, 2006
-
Chirano Gold Mine Expansion – A Case StudyBy S Ellis
In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr
Aug 8, 2011
-
Process design and commissioning of the Goedehoop coal processing plantBy Swann CA
In order to meet export sales requirements from 1983 onwards, Amcoal developed a new underground mine in the Witbank area of the Transvaal. The mine was required to produce 5 million tons of run o
Jan 1, 1986
-
Quantifying Geotechnical Risk in the Mine Planning ProcessBy T P. Medhurst
In many cases mine design is the most important driver of the profitability of a mining project, however to reach an æoptimumÆ mine plan many compromises have to be made. Some of the fundamental profi
Jan 1, 2000
-
Managing Safety: Management's Role in Preventing AccidentsAn intensive safety campaign at Mount Isa Mines Limited from 1956 to 1966 saw the lost time accident frequency rate fall to half its original level. A review of the safety programme was carried out
Jan 1, 1975
-
Discovering New Orebodies - Creation of an Exploration Database, Morning Star Gold Mine, VictoriaBy Kentwell D. J, Cusak C. J, Harvey-Kelly F. E L, M D. Goodz
The Morning Star Gold Mine presents an example of a prolific operation with considerable historical records, mine workings, drill hole logs and countless plans from greater than 20 adjacent mines wh
Jan 1, 1997
-
Improving Blasting by a Team Approach at the Henty Gold MineBy R Wedmaier
Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û
Jan 1, 2001
-
Efficient Use of Energy Mediums in the Reduction of Nickel Metal from Ammonium Sulphate SolutionsBy George CW
Western Mining Corporation (W.M.C.)operate a 30 000 tpa nickel refinery at Kwinana, W.A. using the Sherritt Gordon Process. Following ammonia/air leaching of sulphideminerals and subsequent copper rem
Jan 1, 1985
-
Orebodies in the Mt. Charlotte-Hannan's North Area, KalgoorlieOrebodies in the Mt. Charlotte-Hannan's North area N. and E. of the town of Kalgoorlie provide a marked contrast to the pyritetelluride lodes of the Golden Mile, although both groups of orebodies
Jan 1, 1965
-
A Safe Way to Reduce Support Costs and Improve Safety and ProductivityBy Seedsman R
The fundamentals concepts of roof support are similar between coal mining, metal mining and tunnelling and yet there are different design approaches, different hardware, and different levels of site i
Jan 1, 1998
-
Unlocking value in drill and blast at Olympic Dam – Lime 390 case studyBy P Vaikkattil, K Li, J Bullock
Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout
Mar 15, 2021