  • SAIMM
    Pit Slope Design And Risk ? A View Of The Current State Of The Art

    By T D. Sullivan

    Risk lies at the heart of all mining and nowhere more so than in pit slope design. Mining is principally about two areas of risk; safety and economics. This paper addresses the main elements of pit

    Jan 1, 2006

  • CIM
    The coarse particle recovery process

    By G. S. Hill, B. J. Huls

    This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate ana

    Jan 1, 2006

  • DFI
    Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.

    By P. M. Wiltcher

    The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high

    Jan 1, 2006

  • SME
    Methods To Determine The Status Of Mine Atmospheres – An Overview (9558df84-7241-4dbf-8eae-0e0a3845eb9e)

    By R. L. Derick

    On a regular basis, mine personnel should obtain air samples directly from active underground areas as well as remotely from sealed locations. These samples provide mine officials with data relative

    Jan 1, 2006

  • NIOSH
    New Interactive Training Tools Available To Coal And Aggregate Operators

    By Bill York-Feirn

    The Colorado Mine Safety & Training Program (MSTP), in late 2005, completed and began distributing two new training tools; one geared to underground coal mine foremen and the other to surface aggregat

    Jan 1, 2006

  • TMS
    Carbothermal Reduction Study Of Kaolin And Two Different Silica Sources

    By Sutham Niyomwas

    Synthesis of alumina-mullite-silicon carbide composite (Al2O3-Al6Si2O13-SiCw) was obtained in situ by carbothermal reduction of a mixture of kaolin and two different silica sources. The carbothermal r

    Jan 1, 2006

  • DFI
    Macropiles: Ultra-High-Capacity Micropiles For Foundation Support

    By John R. Wolosick

    MACROPILES are defined as ultra-high-capacity micropiles, with working loads in excess of 250 tons. The piles are typically 9-5/8 to 24 inch (244 to 610 mm) outside diameter. They are drilled and gr

    Jan 1, 2006

  • SAIMM
    Long Hole Drilling Applied To Narrow Reef Mining - Objective

    By R. G. B. Pickering

    The purpose of this report is to chronicle the interaction between Anglo Platinum and Sandvik Tamrock during the development and application of Long Hole drilling as a viable, practical method of narr

    Jan 1, 2006

  • TMS
    The Properties and Uses of Granulated Non Ferrous Slags

    By Michael P. Sudbury

    Non-ferrous slags are granulated and stockpiled as an alternative to pit cooling or transporting molten slag to a dump. The chemical composition of such slag is determined by the pyrometallurgical pro

    Jan 1, 2006

  • SAIMM
    3-D Numerical Modelling Of Stresses Around A Longwall Panel With Top Coal Caving

    By N. E. Yasitli

    There is a considerable amount of lignite reserve in the form of thick seams in Turkey. It is rather complicated to predict the characteristics of strata response to mining operation in thick seams. H

    Jan 1, 2005

  • CIM
    Designing For Paste Thickening

    By Tim Edwards, Richard Triglavcanin, Ian Arbuthnot, Darren Colwell, Brad Garraway, Ken Roberts

    "In the mineral processing industries, there is an increasing need to design thickeners which are able to produce high density underflows usually referred to as “paste”.The behaviour of a flocculated

    Jan 1, 2005

  • CIM
    Murrin Murrin CCD1 Rake Mechanism Modification the Decision and the Result (3e495dbc-2cca-4184-88b3-9cc5914b2481)

    By Brad Hewitt, Jeff Belke

    "Murrin Murrin Operations has not had a successful beginning. Numerous reliability and operability issues many of which are the result of design decisions have been addressed through mechanical and op

    Jan 1, 2005

  • SME
    Grade control in mineral sands – The unique conditions at Old Hickory, Virginia

    By A. J. Romeo

    The Old Hickory heavy mineral ore body, which lies within the Fall Zone of south central Virginia, has been mined since 1997. There are many differences in this deposit when compared to humate-laden m

    Jan 1, 2005

  • SME
    Roadheader Tunneling and Microtunneling in Low Strength Claystone at Standley Lake, Colorado

    By Glen Church, Don W. Deere, Christoph M. Goss

    The Standley Lake Dam Rehabilitation Project in Colorado included the complete replacement of the outlet works. This required two 1.8m (6 ft) diameter microtunneled wet lake taps, 380m and 186m (1246

    Jan 1, 2005

  • SME
    Movements Due to Freezing, Thawing and Tunneling Beneath Two Buildings

    By K. E. Wood, K. J. DiRocco, L. A. Becker

    The Russia Wharf segment of the Silver Line Phase II Project for the MBTA incorporated ground freezing and underpinning during New Austrian Tunneling Method(NATM) tunneling through timber pile foundat

    Jan 1, 2005

  • SME
    Comparison of Face Pressurized Shield Methods in Various Soil Conditions

    By Klaus Rieker

    Over the last 30 years Wayss & Freytag Ingenieurbau AG has gained a lot of experience in mechanized tunnelling on various major projects. During this period most important developments concerning the

    Jan 1, 2005

  • SME
    High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case History

    By Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta

    Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang

    Jan 1, 2005

  • SAIMM
    Management Of A Major Slope Failure At Nchanga Open Pit, Chingola, Zambia. - Synopsis:

    By SDN Wessels, WA Naismith

    On 16 July 2004, at 07:10 a collapse of about 1.8 million m3 (about 4 ½ million tonnes) took place on the north wall on Nchanga Open Pit This collapse was the result of a developing instability th

    Jan 1, 2005

  • AUSIMM
    Zeolite Deposits in Lacustrine Tuffs, Ngakuru, Taupo Volcanic Zone

    By D Hill

    In the Ngakuru area zeolite deposits occur in late Quaternary lacustrine vitric tuffs of the Ngakuru Formation and two of the deposits are being mined. The Ngakuru Formation overlies the Ohakuri Ignim

    Jan 1, 2005

  • SME-ICGCM
    A Resin Quality Testing Procedure for Collieries

    By D. Minney

    The quality of resin used in South African collieries is currently controlled according to South African Bureau of Standards, "SABS-1534:2002". It has however been found that resin which passed the SA

    Jan 1, 2005