RI 9224 - Foundation Response to Subsidence-Induced Ground Movements: A Case StudyBy Jeffrey S. Walker
The purpose of this U.S. Bureau of Mines effort was to determine if ground movement caused by mining-induced subsidence is directly transferred to a structure and, if so, how that transfer takes place
Jan 1, 1989
-
Risk Analysis in Open Pit Mine Design and Planning Using Conditional Simulation TechniquesBy Luis Alberto Martinez Tipe
The paper show how the inclusion of the uncertainty of the geology of the orebody into the mine planning and design process can be of great help, for the mine planner, in both assessing and quantifyin
Sep 12, 2005
-
Design And Operation Of The Hydrochem Flotation ColumnBy J. C. Schneider, G. Van Weert
Hydrochem Developments Ltd. has developed and put into full scale operation a novel type of vertical flotation column incorporating a multiplicity of mechanically agitated stages. Characteristics of t
Jan 1, 1988
-
Selected Factors Affecting Longwall Mine Layouts In The Pittsburgh Coalbed Of Southwestern PennsylvaniaBy A. Iannacchione
Longwall mining began within the Pittsburgh coalbed of Pennsylvania (PA) in the early 1970?s. Originally, longwall mine layouts were designed to fit within existing room-and-pillar operations, where
Feb 27, 2013
-
BioRemediación y nuevas tendencias para tratamientos de aguas, suelos y aires contaminadosBy Carlos Del Castillo Whittembury
El presente texto señala el uso de la bioRemediación como principal técnica que permite la digestión de residuos orgánicos contaminantes de aguas, suelos y aires. En el caso del agua, su limitación es
Sep 12, 2005
-
OFR-6-82 Flexible Liner For Use In Advancing TailgateBy Kenneth C. Ko
An engineering investigation was carried out on the technical and economic feasibility of implementing flexible liner/backpacking support systems In an advancing tailgate longwall mine. The system for
Jan 1, 1980
-
IC 7294 Prospect Trenching With Caterpillar-Mounted AngledozersBy S. H. Lorain
Mechanized dirt-moving equipment has greatly increased the scope of prospect trenching by lowering the costs and increasing the speed of such work. Where the soil covering was more than 3 or 4 feet de
Jan 1, 1944
-
No Net Loss and Offsite Mitigation: Is New Zealand Mature Enough for a Win-Win Situation?By S Christensen
In August 2001 the Minister for Conservation declined an application by GRD Macraes for an access arrangement to enable work at the Globe Progress Mine near Reefton. In her decision, Ms Lee said:æI ha
Jan 1, 2002
-
RI 8470 Iron-Base Alloys Strengthened by Laves Phases as Substitutes for Stainless SteelsBy J. S. Dunning
One Federal Bureau of Mines research goal, to minimize requirements for domestically scarce mineral commodities through conservation and substitution, can be accomplished by utilizing more abundant el
Jan 1, 1980
-
Evaluation On The Structure-Activity Relationship Of Copper Sulfide Collectors By DFT InvestigationThe molecular structures of isobutyl xanthate (IBX), diisobutyl dithiophosphate (DIBDTP), O-isobutyl-N-ethyl thionocarbamate (IBETC), O-isobutyl-N-ethylcarbonyl thionocarbamate (IBECTC) and O-isobutyl
Feb 27, 2013
-
Water Supply Sourcing Options for Oil Sands MinesBy Leslie F. Sawatsky
Each potential oil sands developer deals with the question of optional sources of raw water to supply large water demands that range from 50 to 80 million cubic metres per year for each of six existin
May 1, 2004
-
Large Hole Rotary Drill PerformanceBy J Lyall Workman, Peter N. Calder
"Large hole rotary drilling is one of the most common methods of producing blastholes in open pitmining. Large hole drilling generally refers to diameters from 9 to 17 inch (229 to 432 mm), however ac
Jan 1, 1996
-
Golden Cross Mine Rehabilitation Update - September 2000By A Goldstone, T Maton
The Golden Cross Mine is located on the North Island of New Zealand, at the base of the Coromandel Peninsula, approximately 8 km northwest of Waihi. The project is operated as a Joint Venture with Coe
Jan 1, 2000
-
New Drill Bit Technology - The Rock Reamer Drill BitBy Roger "Dean" Skaggs
Mechanical rock drilling is about 150 years old, and the fundamental principles of augering, penetration and dragging, pressure and rotation, and percussion have not appreciably changed. Surface minin
Jan 1, 1997
-
A Geo-Mechanical Assessment of Thick Seam Mining Methods with Regard to Their Application to Australian Black CoalsBy C D. Rawlings
An assessment is made of the potential for thick seam underground mining of black coal in Australia. A brief summary is given of the geo-mechanical environment and previous mining history existing in
Jan 1, 1980
-
Maintenance management control through utilization of a computerized system at the Key Lake projectBy T. Warren, R. Pender
"Significant strides have been made during the past decade to integrate the traditionally separate administrative functions of financial management, materials management and maintenance management.In
Jan 1, 1990
-
Developments In Furnace Technology For Ferro-Nickel ProductionBy T. Gerritsen, A. Matyas, F. Stober, I. Candy
This paper describes developments in ferro-nickel furnace technology, specifically improvements to cooling methods, furnace controls, and high voltage furnace operating regime. The evolution of these
Jan 1, 2004
-
Towards Formalizing Qualitative Operations Input Data into Mine PlanningBy E. Lampard
Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu
May 1, 2011
-
Monitoring Of Natural Heat Occurrence At The Bear Canyon Coal MineBy Miles T. Stephens, Felipe Calizaya, Jacob O. Kingston
Currently, the Bear Canyon Mine is facing the challenge of excessively high coal and rock temperatures in one of its headings. In Mine No.3, the air temperature at the 6th Right panel reached 36.4ºC a
Jan 1, 2005
-
South Interceptor Tunnel Construction Using a Lovat EPBMBy Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales
This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja
Jan 1, 2003