Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Correlation of Acoustic Emission (A.E.) with Physical and Mechanical Properties of Different Types of Rock and Coal SpecimensBy Brijes Mishra
This paper presents a correlation of acoustic emission (A.E.) with physical and mechanical properties of different types of rock and coal specimens which were tested under aegis of a consultancy proje
Jan 1, 2006
-
Method for assessment of rock drillability incorporating the Protodyakonov indexBy T. Serradj
A study has been carried out to: develop a method for routine characterisation of rock strength and drillability through the particle-size distribution of crushed or drilled rock products, defined by
Dec 1, 1996
-
Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? IntroductionBy Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994
-
OFR-103-81 Development Of Tests And Criteria To Evaluate Grounding SystemsBy Wils L. Cooley
The report covers several aspects of mine safety ground systems, primarily for underground coal mines. The design of a combined ground fault-ground check monitoring system is presented. An analysis is
Jan 1, 1980
-
Batu Hijau: From Discovery to ProductionBy Thomas J. DeMull
Development of the Batu Hijau copper project was completed in the fourth quarter of 1999 with the formal handover and start-up of ore processing facilities. The project began in August 1996 when the
Jan 1, 2002
-
Discharge Water Handling And Treatment: Problems And Solutions At A Large Pittsburgh Seam Coal MineBy R. L. Zick, J. D. Byars, T. P. Mucho
Recently, a large Pittsburgh seam longwall mine was nearing depletion of a major portion of its current reserves and had begun to develop in a different direction from its original portal area to acce
-
Purification of solid from secondary aluminum smelting drossBy J. C. Escobedo, J. M. Almanza, A. Flores, Cortés. D. A.
Secondary aluminum dross, which has been exposed for several years to atmospheric conditions, was characterized using chemical analysis, X-ray diffraction, optical and scanning electronic microscopy,
Jan 1, 2005
-
The Use Of Sensor Derived Data In Real Time Mine Optimization: A Preliminary Overview And Assessment Of Techno-Economic SignificanceBy M. Buxton
Sensor derived data can add value across the mining operating chain ranging from resource definition, extraction, pre ? concentration, mineral process monitoring and assessment of product quality. M
Feb 27, 2013
-
Design Criteria For Multistage Spiral CircuitsBy T. McKeon, G. Luttrell
Spiral separators are commonly used to upgrade sand-sized particles in both the coal and mineral processing industries. Many plants utilize multiple stages of cleaning and/or scavenging spirals to imp
Jan 1, 2007
-
Thickener Modelling - Incorporating Shear EffectsThickener Modelling - Incorporating Shear Effects
Sep 13, 2010
-
Test Pile Program To Determine Axial Capacity And Pile Setup For The Biloxi Bay BridgeBy W. Robert Thompson
Hurricane Katrina caused significant damage to transportation structures on the Gulf coast in August, 2005, including the destruction of the US 90 Bridge over Biloxi Bay, Mississippi. Part of the suc
Jan 1, 2009
-
Classification-Based Probabilistic Design Of Ground SupportBy Radford B. Langston, John A. Marjerison, Graham C. Howell, Hendrik A. D. Kirsten
Probabilistic design is gaining wider acceptance in the rock engineering community since it allows more rigorous determination of risk relating to ground fall or excavation instability. Risk analysis
Jan 5, 2007
-
The Application and Economics of Industrial Alkaline Leaching of Copper Enargite ConcentratesBy C. G. Anderson
"As demand for copper and precious metals continues to grow, the need to develop new supplies increases. In the imminent future, the new large global ore bodies are more complex, with enargite, tennan
Jan 1, 2015
-
Computer Control of Flotation Circuits at Frood Stobie MillBy G. Styles, K. Lye, R. Tenbergen, M. Mayhew
Requirements to produce a higher bulk concentrate grade have necessitated extensive use of on-stream analyser data and computer programming to obtain the targets set for Frood Stobie Mill as required
Jan 1, 1985
-
Evaluation Of The Originally Published, Meyerhof Empirical Correlations Of Shaft Friction And End Bearing Capacity For Driven Piles Using Dynamic Test DataBy Karl A. Higgins
In 1976, Prof. G. G. Meyerhof published a famous article in the Journal of Geotechnical Engineering titled ?Bearing Capacity and Settlement of Pile Foundations?. This article presents the authors opi
Jan 1, 2011
-
Chemical Demineralization Of Three Different Graphite Ores From TurkeyBy Ö. Kaya
The removal of gangue minerals from three different graphite ores (Inebolu, Akdag?madeni and Çoraklidere) from Turkey by acid leaching was studied. Acid leaching experiments were applied to the flotat
Jan 1, 2009
-
High Pressure Direct Injection of Natural Gas in a Diesel Engine for High Performance/Low EmissionsBy K. Bruce Hodgins
The North American mining industry faces challenging emissions regulations in coming years with the introduction of new standards for off-road diesel engines. In order to remain competitive, industry
May 1, 2002
-
Modeling Of Hand-Arm Vibration - IntroductionBy Akul Joshi, Ming C. Leu, Robert Guttenberg, Susan L. Murray
The aerospace and automotive industries are facing a significant risk for cumulative trauma disorders from high-repetition, long-duration tasks. Additional risk factors such as shocks, vibrations and
Jan 6, 2006
-
Water Chemistry Effects On Zeta Potential Of Concentrated Hematite OreBy H. J. Haselhuhn
Selective flocculation and dispersion processes for the concentration of hematite ore are strongly dependent on the ionic content of the process water. It has been noticed that magnesium ions are more
Feb 27, 2013
-
Risk "Thinking" for Australian TunnellingA paper presenting an overview of legislative and best practice approaches to the management of OHS&E and business risk for Australian tunnelling operations. Best practice can be achieved in
Jan 1, 2008