Evaluation of Rockburst Hazard from Core TestingBy Michael Alber
Coal resource extraction reaches higher depth of overburden and rockbursts as well as associated seismic events appear to become an additional problem to he addressed by ground control engineers. For
Jan 1, 2004
-
An Analytical Approach to Determine Stress Distribution in Longwall Chain PillarsBy James M. Kramer
This paper introduces an analytical approach for the determination of the vertical stress in the chain pillar system between two adjacent longwall panels. The development of this approach is based on
Jan 1, 1998
-
Jointing Effects On Pillar StrengthBy Gabriel Esterhuizen
When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn
Jan 1, 2000
-
Roof Instability Rating (RIR) System and Its Application at Enlow Fork MineBy John C. Stankus
ldentifcation of potential roof problems in coal mines has long been a complex issue due to the wide variety of mining and geological conditions. It is well known that mine roof falls are related to m
Jan 1, 2001
-
Delineation Of Abandoned Workings With An In-Seam Seismic MethodBy I. Geldmacher
In-Seam Seismic (ISS) methods have been used extensively worldwide for the past 10 years to assist mine planning, espe¬cially longwall mining in coal seams. The technique is only starting to gain wide
Jan 1, 1990
-
Geomechanical Substantiation Of Extraction Of Undermined Ore DepositBy M. V. Kurlenya
The experience of application of geomechanical investigations for substantiation of extraction of undermined ore deposit in the north of Siberia is discussed. The finite element method was used for fo
Jan 1, 1990
-
The Initial Performance of Commonly Used Primary Support on U.S. Coal MinesBy Murali Gadde
U.S. coal mines? primary roof supports typically consist of passive resin bolts; however, the use of active bolt systems is increasing. Despite this widespread use, a comparative performance evaluatio
Jan 1, 2011
-
Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof ControlBy Anil Mahyera
Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),
Jan 1, 1981
-
Ground Control Problem Associated with Longwall Mining of Developed PillarsBy T. N. Singh
Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems
Jan 1, 1984
-
Resin Annulus Size Effects On Rebar Bolt Pull Strength And Resin Loss To Fractured RockBy Al Campoli
One of the critical variables affecting resin bolt performance is the size of the resin annulus, defined as the difference between the hole and bolt radius. The vast majority of the millions of resin
Jan 1, 1999
-
Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery RoomBy Tom Wynne
In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre
Jan 1, 1993
-
Roof Instability of Longwall Face at Ikeshima CollieryBy Kikro Matsui
Longwall mining 1s more productive in comparison to other methods but requires particular conditions for its effective use This paper relates to longwall roof instability at Ikeshima Colliery In order
Jan 1, 1997
-
Shear Bond Stresses Along Cable BoltsBy Hani S. Mitri
The behaviour of grouted cable bolts used for rock reinforcement as a means of ground control in hard rock mining is investigated. The study utilizes an analytical model which is based on the variatio
Jan 1, 1990
-
Determination Of Plate Size Effect On Ultimate Bearing Capacity Of Weak Floor In Underground Coal Mines Using A Boundary Integral ApproachBy Zhanjing Yu
In this paper, an equation is developed to characterize the relationship between the UBC and plate size using a boundary integral approach. The equation was validated by the results from mo& than seve
Jan 1, 1993
-
Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)By Winton J. Gale
The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o
Jan 1, 1992
-
Stability Evaluation Of Alternative Designs Of Drift-And-Fill Stoping In Zhaoyuan Gold Mine, P. R. ChinaBy Xianming Zhou
Mining economics is such that too conservative in safety will result in a considerable penalty in mining cost. However, initial planning and design of a mining project often must be done without compl
Jan 1, 1989
-
The Utilisation of Numerical Modelling to Predict Water and Gas Flows Around Longwall Panels; Two Case Studies from the UK Coal Mining IndustryBy D. J. Reddish
This paper illustrates how numerical modelling has been utilised to predict water and gas pathways around active longwall panels using two case studies. This information has proved invaluable m the de
Jan 1, 2003
-
Analysis Of The Seam Inclination Effect On Roof StabilityBy Hanjie Chen
Mining experiences have shown that in a pitching seam, roof behavior is significantly different from a flat seam. Uphill mining usually experiences more roof problems than downhill mining. Based on a
Jan 1, 2000
-
Surface Subsidence Velocity of Fully-Mechanized Thick Seam Top Coal Caving MiningBy Wenbing Guo
Surface subsidence for fully mechanized thick seam top coal caving was measured, and surface subsidence characteristics were then analyzed. The subsidence initiation distance from the set-up room and
Jan 1, 2011
-
Extended Cut Out Distances In Continuous Miner Sections In South African CollieriesBy Ismet Canbulat
The cut out distance in the continuous miner sections in South African collieries is limited to 12 m. However, this distance can be extended to 24 m by the permission of the Department of Mineral and
Jan 1, 2000