Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Assessment Of Underground Structural DesignBy Eugene D. Krupa
Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is
Jan 1, 1990
-
Imaging Ahead Of Mining With Radio Imaging Method (RIM-IV) Instrumentation And Three-Dimensional Tomography SoftwareBy Larry Stolarczyk
A clear vision of the future coal mining industry was developed into a hierarchy of technology needs by the National Mining Association (NMA) and the Chief Executive Officers of the mining industry. A
Jan 1, 2003
-
Review Of Pillar Design Equations Including The Effects Of ConstraintBy C. Babcock
This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships
Jan 1, 1981
-
Roof Screening: Best Practices and Roof Bolting Machines (e5909744-6953-4a41-b02f-21226966b63f)By Susan Robertson
Many injuries are caused each year by rock falls in coal mines. Most of these injuries are not caused by major roof collapses, but from falls of smaller rocks from the immediate top or roof skin. Vari
Jan 1, 2002
-
Regional Horizontal Stress And Its Effect On Longwall Mining In The Northern Appalachian Coal FieldBy D. W. H. Su
This paper presents the results of ill situ horizontal stress measurements using a Minifrac system in several northern Appalachian coal mines. The effect of stress magnitude and orientation on longwal
Jan 1, 1995
-
Utilization Of Polymer Grid Structures In Shield Recovery OperationsBy Brian E. Travis
Recent Developments in the utilization of polymer grid structures for Longwall Shield Recovery operations are discussed. Specifically: various Longwall screen designs and the numerous methods employed
Jan 1, 1993
-
Field Measurements of Chain Pillar Response to Longwall Abutment LoadsBy Christopher Mark
Current longwall pillar design methods are based on many assumptions about pillar and entry response to longwall abutment loads. Knowledge of the magnitude and time-of-arrival of abutment loads is ess
Jan 1, 1986
-
Application Of DDM To Some Rock Pressure Problems In Japanese Deep Coal MinesBy Yoshiaki Fujii
Displacement Discontinuity Method (DDM), which was originally developed by Crouch,S.L., is a powerful tool to calculate mechanical disturbances due to tabular excavations. Three topics on DDM applicat
Jan 1, 1992
-
Resupporting High Roof FallsBy Nicholas Chlumecky
One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is
Jan 1, 1981
-
Engineering Geophysics - Mine Subsidence Risk Assessment StudyBy Kanaan Hanna
Abandoned mines pose a serious threat to public health and safety, as well as the environment. When active workings approach old mine workings, miners could encounter significant hazards. Additionally
Jan 1, 2011
-
Highwall Control At Homestake's Open Cut MineBy Don Berger
Highwall scaling, bolting and technical blasting are important aspects in the remediation of existing highwall exposures. Proper planning, design and research are important first steps in the developm
Jan 1, 1996
-
Ground Control Criteria for Coal Reserve Optimization in Multiple-Seam MinesBy Eric Westman
Ground control problems caused by multiple-seam interaction frequently sterilize coal reserves. Interaction mechanisms differ for overmining and undermining and are controlled by mining, spatial. and
Jan 1, 1997
-
The Quasi-Protection-Layer Model and Its Mechanisms of Gas DrainageBy Liu Xiao, Lin Xiaoying, Ma Geng, Tao Yunqi
"The soft coal in China has several issues, low permeability, high gas content and prone to gas outburst, making it difficult to drill and improve its permeability. Using the rock mass loading test, t
Jan 1, 2016
-
Progress in Managing the Geotechnical Aspects of Longwall Face RecoveryBy David Hill
"End of panel longwall face recovery is almost certainly the most involved recurring geotechnical problem faced by operators, with major loss potential should problems occur. The paper presents Austra
Jan 1, 2010
-
Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design FeaturesBy Thomas M. Barczak
The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas
Jan 1, 2001
-
The Impact Factors of Overburden Movement in Longwall Mining of Shallow Coal SeamsBy Yang Li
For the study of overburden movement in longwall mining of shallow coal seams, most scholars merely consider the thickness of bedrock and top soils. In this paper, the overburden movement in longwall
Jan 1, 2014
-
Letter Of NominationBy Dr. Daniel W. H. Su
t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving
Jan 1, 2006
-
Analyses of De-Confinement Mechanisms of Unstable Failures in Underground Mining ConditionsBy Ruixiang Gu
The de-confinement mechanisms of unstable failures as they occur in deep coal mining conditions are investigated using a distinct element numerical modeling code. The Mohr-Coulomb and continuously yie
Jan 1, 2014
-
Investigation Of Pillar-Roof Contact Failure In Northern Appalachian Stone Mine Workings (55897abb-5ce0-4661-bf26-04d03fe5d67b)By Gabriel Esterhuizen
The roof rock in underground limestone mines in Northern Appalachia can be subject to high horizontal stresses in spite of the shallow depth of the workings. The high stresses can cause roof stability
Jan 1, 2004
-
Stress Control Method Applied to Stabilization of Underground Coal Mine Openings (e5cbe8ad-30a8-4144-a7b5-db19e81a247a)By Shosei Serata
Serious floor heave of up to 2.4 m in a 2.4-m high mine entry was eliminated by applying the stress control method of mining, as a last resort, at the No. 5 coal mine of Jim Walter Resources, Inc., in
Jan 1, 1984