Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
High-Intensity Autogenous Milling in the Hicom Mill - A Preliminary Simulation ModelBy David I. Dr. Hoyer
The Hicom mill is a conical mill in which a ball or autogenous load tumbles within a high-intensity acceleration field. An autogenous Hicom mill with a power density of about 1100 kw/m3 and a volume o
Jan 1, 1992
-
Exxon's Cerrejon Coal Project In ColombiaBy F. P. Jung
This presentation will be a general overview of the Cerrejon Coal Project being developed jointly by Carbocol, an entity of the Colombian government, and Intercor, an Exxon affiliate. The word "Cerraj
Jan 1, 1982
-
Pulsed Column Application In Copper Solvent ExtractionBy M. F. Vancas
The advantages of using vertical pulsed columns as replacements for conventional mixer/settlers in the uranium industry have been known for some time. The advantages of the columns offer include a red
Jan 1, 1999
-
Noise Levels and Controls in Coal Cleaning PlantsBy Terry L. Muldoon
On July 7, 1971, noise regulations for underground coal mines were implemented under provisions set forth in the Federal Coal Mine Health and Safety Act of 1969. These same regulations now also apply
Jan 1, 1972
-
Application of Detailed Geology To Production, Planning, And Ore Search: Trixie Mine, East Tintic District, Utah (Chapter 4)By G. E. Mellor, R. E. Lippoth, T. B. Faddies
The Little Rocky Mountains host epithermal- gold-silver bearing vein and stockwork deposits in a syenite intrusive complex. Pegasus Gold Ltd. is currently mining these oxidized deposits by open-pit me
Jan 1, 1992
-
Quality of Ore, Lake Superior DistrictBy Duluth Engineers' Club, Engineers' Club of Northern Minnesota
"In recent years, much has been said and written on Lake Superior ores, giving the impression that the quality of the ore is deteriorating in grade and that the reserve of high grade ore is rapidly be
Jan 1, 1920
-
Eight Heading Rock NATMBy John H. N. Yen, James M. Marquardt, Larry H. Heflin
INTRODUCTION On February 17, 1995, WMATA Contractor J.F. Shea holed through the last segment of rock tunnels of the planned 103-Mile Rapid Transit System for the Washington Metropolitan Area Transi
Jan 1, 1997
-
Rapid Construction Of The Syar Tunnel Central Utah ProjectBy P. R. Busmann, D. J. Rogers
The Bureau of Reclamation's Syar Tunnel project included excavation of a 9.2 kilometer (5.7 mile) long, 3.6 meter (11.8 ft) diameter tunnel through gently dipping sedimentary rocks consisting of
Jan 1, 1991
-
Houston Pipe Jacking - Large And SmallBy George H. Klein, B. Kent Merritt, Anthony Crisci
During the past decade, over 114-km (71-mi) of 0.25-m (10-in) to 3.7-m (144-in) finished diameter tunnels have been driven below Metropolitan Houston as part of a major program of water and wastewater
Jan 1, 1991
-
Interstate Route H-3 Alternative Dowel Testing ProgramBy Lee W. Abramson, Glenn M. Boyce
A dowel testing program was conducted as part of the Interstate Route H-3 Trans-Koolau exploratory tunnel project on the island of Oahu, Hawaii. The testing evaluated the performance of dowels to be u
Jan 1, 1991
-
Portland, Oregon’s Alternative Contract Approach—A Work in ProgressBy Paul Gribbon, Greg Colzani, Jim McDonald
The $300 million West Side Combined Sewer Over?ow Project consists of over5.5 kilometers of soft ground tunnel, an 833-million liter per day (220-MGD) deep shaft pump station, 3 kilometers of micro tu
Jan 1, 2005
-
Environmental Aspects Of Disposing Of Coal Combustion Residues In Inactive Surface MinesBy A. G. Kim
Increasing transportation costs, clean air regulations and the decreasing availability of landfill space are factors in the increased interest in the utilization of low cost disposal sites for coal co
Jan 1, 1994
-
Resistance Of Fan Drifts - A Model Study ? IntroductionBy G. B. Misra
Though installations of main mine fans vary widely, the commonest installation is of a surface exhaust fan connected to an upcast shaft some distance below its collar by a horizontal fan drift bending
Jan 1, 1980
-
"Centennial Review -Anthracite Deep Mining"By Charles G. Zink
Early anthracite "deep mining" methods, production, manpower. underground transportation, labor, safety and reserves are reviewed and compared to the present and to future requirements which must be m
Jan 1, 1971
-
New Developments In Headed Rebar Ground SupportBy Roland C. Walker
Traditional headed rebar has existed in the mining industry as a ground support product for many years. The head of a rebar bolt is most commonly produced by hot upset die forging. Upset die forging
Jan 1, 2009
-
(Preprint 88-183)Eldorado Resources Ltd.(ERL) uses a solvent extraction process for the processing of uranium ores. The solvent extraction plant consists of 4 extraction and 5 stripping stages with regeneration carrie
Jan 1, 1988
-
Evaluation and Utilization of Native Missouri Fireclays In RefractoriesBy C. P. Wa1ters
This paper is written primarily from the standpoint of the miner and consumer of Missouri fireclays in refractory products, principally firebrick used in the linings of blast furnaces, hot metal trans
Jan 1, 1977
-
Hydraulic Pumping In Open Pit MiningBy Kendrick C. Hardcastle
Although the basic techniques employed in hydraulic pumping in open pit mining have been practiced throughout the better part of this century, only relatively recently have studies of' sufficient
Jan 1, 1964
-
Reducing Earthmover Tire CostsBy Charlie Sons
Pit and underground mine operators typically use a lot of big equipment tires. Just as typically, they spend a lot of money they shouldn't on these tires. That's because tire use and mainten
Jan 1, 1982
-
Coal Preparation At The Humphrey MineBy Victor Phillips
The Humphrey Preparation Plant of Christopher Coal Company, located in Monongalia County, West Virginia, was built to process the combined production of the Pursglove No. 15 and the Humphrey No. 7 Min
Jan 1, 1958