Performance Of Stone Columns In Multi-Layered Soils Under The Action Of Seismic LoadsBy P. Kiruthika, A. Murali Krishna
Soil liquefaction is a dangerous phenomenon that involves huge damages during strong earthquake ground motion event. Stone columns (SCs) are widely used as liquefaction mitigation element which is exp
Sep 1, 2022
-
Analytical Method of Stone Columns Compared with an Analysis as Per Rowe Dilatancy TheoryBy Abhijit Saha
"Two analytical closed-form elastic-rigid-plastic solution methods to predict the rigid foundation behaviour on stone-column reinforced soil are compared, both of which takes into account the stone ma
Jan 1, 2015
-
Diaphragm Wall Construction, Instrumentation, and Testing for a Hydroelectric Power FacilityBy David Gatto, Nicolas A. Willig-Friedrich, Jeff A. Segar
"With the increasing demand for electricity, and requirements to generate this power cleanly, more producers are turning towards hydroelectric power. A project in Iowa currently under construction wil
Jan 1, 2016
-
p-y Curves For Analyzing Micropiles in Sandy Soils Using Lateral Load Test DataBy Mahdi Soudkhah, Akhter Hossain
Vertical micropiles are generally considered to be low in lateral resistance. Therefore, battered micropiles are often used when additional lateral load carrying capacity is required. However, batteri
Jan 1, 2019
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
Site Development and Foundation Planning for a Wastewater Treatment Plant ExpansionBy Steven R. Ahlfield, Ali Ghandeharioon
A wastewater treatment plant commissioned in 1978 is undergoing a major expansion. Planning various phases of the 8-hectare expansion at this site requires an understanding of the site response during
Jan 1, 2019
-
Artificial Ground Freezing – A Typical Application for the Underpass of an Existing Metro Station in RomeBy Bruno Vingiani, Alessandro Bertero
"The use of Artificial Ground Freezing (AGF) for temporary soil strengthening and seepage control is an effective alternative to grouting when dealing with soils whose degree of finesses would imply t
Jan 1, 1900
-
Full Scale Load Test Program Confirms the Design of a Rigid Inclusions Solution for the Support of an MSE Wall in Southern New JerseyBy Susan Rafalko, Mike Walker, John Sankey, Sherif Aziz, Alex Potter-Weight, Mary Nodine, Frederic Masse
"After several successful projects on the Garden State Parkway and New Jersey Turnpike for support of single-stage MSE (Mechanically Stabilized Earth) walls using rigid inclusions (Controlled Modulus
Jan 1, 2015
-
Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)By Jeffrey M. Taylor, Arturo Ressi di Cervia
"Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con
Jan 1, 2004
-
Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation SupportBy Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin
"Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated
Jan 1, 2016
-
Ground Disturbance Due to Static Pressure Driving of Opened-Ended PHC PilesBy Xiaocen Lu, Guowei Li, Jiantao Wu, Thang N. Nguyen, Andrew C. Amenuvor
"This paper investigates the effect of driving a group of 52 open-ended Prestressed High Strength Concrete (PHC) piles on an existing highway embankment based on field measurements of excess pore pres
Jan 1, 2016
-
Radium Hospital Project In Oslo, NorwayBy Wojciech Szczepiński, Dominik Gächter
In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau
Oct 1, 2021
-
Radium Hospital Project in Oslo, Norway.By Dominik Gächter, Wojciech Szczepiñski
In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau
Sep 8, 2021
-
Pile Shaft Capacity from Cone Penetration Test (CPT) Records; Considering Scale EffectsBy Abolfazl Eslami, Sepide Lotfi, Mohammad M. Eslami
"Via direct CPT methods for pile capacity prediction, correlation coefficients smaller than unity are used to relate cone tip resistance (qc) and sleeve friction (fs) to pile toe capacity (rt) and sha
Jan 1, 2015
-
Kosciuszko Bridge Main Pylon Deep Foundation SolutionBy A. Daugiala, D. Coleman
In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E
Jan 1, 2016
-
Level Crossing Removal Project – Package 1By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong
"The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin
Jan 1, 1900
-
Seismic Design for the I-30 Crossing Project in Little Rock, ArkansasBy David S. Graham, Benjamin Turner, Paul J. Axtell
Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an
Sep 8, 2021
-
Execution of Pile Installation in Environmentally Challenging SitesBy Dena Morgan, Emre Biringen
"Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t
Jan 1, 2014
-
Evolving Micropiles: Optimizing Foundations For Seismic RetrofitBy Rob Jameson
Micropiles are ideally suited to seismic retrofit applications. Their high tensile and compressive capacity can sustain the large concentrated loads induced during seismic events. Micropiles can be
Jan 1, 2008
-
Monitoring of an Embankment Project Using Rigid Inclusions and Vacuum Consolidation During and After ConstructionBy Stephen Buttling, Zhong Rui
"A single unit gas fired power station was being built on the edge of the Gulf of Thailand in 2001. The soil conditions consisted of very soft to soft Holocene Marine Clay, and the site was part of a
Jan 1, 1900