Seattle Shored Excavation - Design, Construction, MonitoringBy David Winter
The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of
Jan 1, 1987
-
Construction Of Effluent Outfall Diffusers For The Boston Harbor ProjectBy Geoffrey D. Collins
This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay
Jan 1, 1994
-
Foundations For The Sohio Corporate Headquarters - A Presentation At The Deep Foundations Institute Annual Meeting Cleveland, Ohio, November 1983By Clyde N. Baker
Foundations for the Sohio Corporate Headquarters in downtown Cleveland have column loads of 11,400 kips, which increase to 15,000 kips with wind loading. An extensive exploratory program was conducted
Jan 1, 1984
-
Static And Dynamic Tests For Evaluation Of The Vertical Load Bearing Capacity Of Piles - SummaryBy Madan B. Karkee
The understanding and the development of sound theoretical basis concerning the pile foundations has been phenomenal during the past few decades, considering the thousands of years the piles have evid
Jan 1, 1997
-
Innovative Construction Techniques Used At North Shore Construction ProjectBy Kanchan K. Sen
The North Shore Connector (NSC) project will extend the Allegheny County Port Authority?s Light Rail Transit System from downtown Pittsburgh below the Allegheny River to the North Shore via twin bore
Jan 1, 2010
-
Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2007
-
Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, GujaratBy Ekhlaq A. Khan
"The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a
Jan 1, 2017
-
Berminghammer II 25 Vertical Travel Lead System: Innovative Technology For Deep Foundation Soil Mixing - 0.0 IntroductionBy Andy Schroeder
Located in Hamilton, Ontario Canada, Berminghammer Foundation Equipment, is a manufacturer of advanced foundation equipment with 30 years of experience. The company is represented in more than 20 coun
Jan 1, 1997
-
Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich BridgeBy Andrew Peterson
The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi
Jan 1, 1999
-
Underpinning With Steel Pipe PilesBy Pasi Korkeakoski
There are about 400 multi-storey buildings founded on wooden piles in the city centre of Turku in Finland. Soil conditions are variable from hard rock to very soft clay. Due to the soil conditions and
Jan 1, 2000
-
The Challenges Of Construction In Karstic Limestone: Three Major Case HistoriesBy Donald A. Bruce
The construction of major structures in karstic limestone terrains poses difficult problems to designer and contractor alike. This reflects the inherent variability of such conditions, and also the si
Jan 1, 2002
-
Automated Instrumentation For ACIP And Drilled Displacement Piles - 1. IntroductionBy John Lemke
Current practice for monitoring static pile load tests commonly consists of measuring load and displacement at the top of a pile. This is typically accomplished by monitoring dial gauge movements, lin
Jan 1, 2002
-
Compensation Grouting Under Real-Time Monitoring, Rio Piedras Project, San Juan, Puerto Rico - Deep Foundations Institute 25th Annual Meeting And 8th International Conference New York USA, October 5-7, 2000By Jean-Pierre Hamelin
Ground movements induced by underground excavation are always of critical concern, particularly in urban areas. Compensation grouting now appears as a safe means to control these movements. The paper
Jan 1, 2000
-
Some Problems Encountered During Pile Installation - SynopsisBy [D. N. ] Naresh
During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som
Jan 1, 1996
-
Excavation Support At The Capitol Visitor Center In Washington DCBy Harald Ludwig
In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site
Jan 1, 2006
-
Marine Foundation Retrofit For The Richmond - San Rafael BridgeBy Patrick E. Durnal
A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM Harris) designed the $779 mill seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the San Fr
Jan 1, 2013
-
Vibwall Installation - Cardiff Bay Barrage ? SynopsisBy Graeme McWhirter
This paper discusses the Installation of a Vibwall for the Cardiff Bay Barrage Project Wales, UK, by Kvaerner Cementation Foundations. Only the second use of the technique in the UK the wall was succe
Jan 1, 2000
-
The Merits Of Polymeric Fluids As Support SlurriesBy J. J. Beresford
The primary function of a support slurry is to provide stability during excavation. Today foundation structures can be designed around the additional friction afforded by the absence of the filter cak
Jan 1, 1989
-
Deep Foundations In Hong Kong - SynopsisBy Martin Pratt
This paper is an overview of deep foundation engineering in Hong Kong past, present and future. The enormity of the subject compared with the space available makes brevity inevitable. Issues of constr
Jan 1, 2000
-
Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - IntroductionBy Nino Catalano
The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso
Jan 1, 1994