    Design, Construction And Testing Of Micro-Piles Used To Support A Concrete Arch Bridge

    By William Auyeung

    Micro-piles are small-diameter, drilled and grouted reinforced piles used for both structural support and in situ earth reinforcement. They were conceived in Italy in 1952, but have become popular in

    Jan 1, 2004

  • DFI
    Non-Destructive Testing Of Piles - A Case History - Summary

    By Manish Kumar

    One of the recent advances in the field of testing of concrete piles is the Non-Destructive testing (NDT) of piles. This paper deals with a specific project where this technique was employed along wit

    Jan 1, 1996

  • DFI
    Seven Mile Dam Retrofit - A Global Challenge

    By Arvindh Gupta

    BC Hydro proposed to improve the stability of the existing Seven Mile Dam with 54 corrosion protected, re-stressable anchors comprising 92/0.6? strands each, in phase 2 of the program. Being globally

    Jan 1, 2004

  • DFI
    Optimisation Of Pile Type To Support Major Structures Above A Deep Sand Profile - Synopsis

    By P. Davies

    The Hillside Smelter presently under construction at Richards Bay, Republic of South Africa, will be, on completion, the fifth largest aluminium smelter in the world. The site selected for this plant

    Jan 1, 1996

  • DFI
    The Behavior And Design Of Piled-Raft Foundations Under Lateral Loading

    By Serge Borel

    An efficient design method is proposed for "piled-footing" and "piled-raft" foundation under lateral loads. It combines the methods used for the displacement design of shallow and deep foundations and

    Jan 1, 2002

  • DFI
    Lessons Learned From Mitigating Early Project Delays To Deep Foundation Work

    By Jeffery L. Ottesen

    Early construction delays can jeopardize timely completion of subsequent work. As an early construction activity, and due to many unforeseen issues, deep foundation work inherently bears great potenti

    Jan 1, 2002

  • DFI
    High Strain Testing Of Large Diameter, High Capacity Unlined Bored Piles ? Introduction

    By Dhanvin B. Mehta

    Pile testing is generally understood as static load test. It is our common experience that for high capacity, large diameter bored piles, static testing is expensive and time consuming. It is practica

    Jan 1, 1996

  • DFI
    Innovative European Technologies To Accelerate Construction Of Embankment Foundations - Part II: DM, FMI, Mass Stabilization & CSV

    By Ali Porbaha

    In today's fast-track construction environment, owners are searching for non-conventional technologies to build their projects faster and safer while maintaining traffic flow during construction.

    Jan 1, 2002

  • DFI
    Axial Pile Response Evaluation By Geophysical Piezocone Tests

    By Paul W. Mayne

    The axial load-displacement-capacity and load-transfer response of deep foundations can be conveniently assessed by geophysical piezocone tests that provide four independent readings with depth, inclu

    Jan 1, 2002

  • DFI
    Pile Driving Hammers In Centrifuge Modelling - Synopsis

    By Daniel Levacher

    Pile load tests in site require extensive means of action and time. To get outstanding tests, the environmental test conditions must be perfectly known and acceptable. They concern the support install

    Jan 1, 1996

  • DFI
    The Stability Of A Diaphragm Wall ? Synopsis

    By X. L. Chen

    The diaphragm walling has been recently adopted in one of the largest excavation of deep foundation engineerings in Shanghai, China with dimension of 90m in length, 50m in width and 13m in depth to so

    Jan 1, 2010

  • DFI
    Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay Deposit

    By Wanchai Teparaksa

    Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large

    Jan 1, 2002

  • DFI
    Suwanee American Cement Plant, Branford, Florida: A Case Study Of Large Diameter Continuous Flight Auger Design Build Foundations

    By Gordon King

    This paper presents a case study of large diameter continuous flight auger (CFA) piles and drilled shafts utilized for foundation support of a series of heavily loaded cement plant structures at the S

    Jan 1, 2003

  • DFI
    Dynamic Behavior Of Pile Foundations

    By Yingcai Han

    The dynamic behavior of pile foundations is investigated in both theory and practice. The computation method for vibration of pile foundations and DYNAN computer program are introduced comprehensively

    Jan 1, 2002

  • DFI
    Evaluation Of Pile Load Test Results

    By Rasin Duzceer

    In this paper, the results of pile load test on 24 piles from twelve sites are presented. The pile load tests were performed on 14 driven and 10 bored piles of varying diameters and lengths installed

    Jan 1, 2002

  • DFI
    Mobilisation Of Skin Friction In Bored Piles In Hong Kong ? Introduction

    By R. A. Fraser

    Large diameter (1.0 to 2.5m) bored piles have been widely used to support buildings and elevated roadways in Hong Kong. Most of these piles are founded on a hard bearing stratum such as granitic or vo

    Jan 1, 2010

  • DFI
    RResearch On Dynamic Inspection Of Prototype Models Of Reinforced Concrete Piles

    By Xuhui

    Pile foundations are underground projects which are carried out under complicated site conditions, so it is difficult to summarize their characteristic patterns from the everchanging practical pile fo

    Jan 1, 1991

  • DFI
    The Effects Of Heating And Cooling Energy Piles Under Working Load At Lambeth College, UK

    By Tony Amis

    There is very limited information relating to the potential impact of temperature cycles, outside the variation that occurs naturally, on the behaviour of foundation piles. Such thermal loading occurs

    Jan 1, 2008

  • DFI
    Pier Design And Construction In Water Bearing Soils ? Synopsis

    By C. N. Baker

    The design and construction of drilled piers through water bearing and caving soil conditions are discussed. The need for close cooperation between the design engineer and contractor in both the desig

    Jan 1, 2010

  • DFI
    A General Formula To Determine The Allowable Pile Bearing Capacity In Case Of Negative Skin Friction ? Summary

    By Cornelis Van Der Veen

    Foundation piles, partly passing through unconsolidated compressible layers, suffer a downward drag that is called negative skin friction. The negative skin friction depends on the movement of the sur

    Jan 1, 2010