Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improvement of Soil Properties by Basalt Fibre ReinforcementBy Ramanathan Ayothiraman, Anurag Singh
"An experimental program was undertaken to investigate the effects of randomly distributed basalt fibre on the index and engineering properties of Dhanori clay and to compare its performance with the
Jan 1, 1900
-
Nicholson In The Neighborhood: Virginia’S North Hill ProjectBy Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Comparative Study On Numerical Analysis Of Laterally Loaded PileBy Tiruvengala Padma, Nilesh Naik
Piles are common type of deep foundation elements used for the special bridges, transmission towers, Jetties, and tall structures. Lateral loads on the structures can be due to either earth pressures,
Sep 1, 2022
-
Framework for Risk-Based Electric System Deep Foundation DesignBy Steve Davidow, Ashely E. Evans, Peter M. Kandaris
"Annually thousands of deep foundations are constructed across North America supporting high voltage transmission line structures. However, a recent state of the practice survey by the Deep Foundation
Jan 1, 2017
-
Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative SolutionBy Filippo Maria Leoni, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co
Jan 1, 2017
-
Geotechnical Instrumentation of Pile Foundations Embedded In Molasse of a High-Rise BuildingBy A. Daouadji, P. Cazes, S. Grange, L. Briançon, R. Milane
Construction in congested urban areas is often accompanied by geotechnical problems due to high loads and the impact caused by nearby buildings. For this reason, it is important to understand the beha
Jan 1, 2019
-
Soil Fatigue Analysis for Pile Driving Simulations Using an Impact HammerBy Peter Middendorp, David J. Tara, Gerald E. Verbeek, Jan Fischer
"For pile driving simulation the model used must be accurate for the entire process, i.e. from the start of pile driving until the pile has reached its target depth. Of the various model components (h
Jan 1, 2017
-
Experimental Study on Lateral Capacity of Single Pile Embedded in Cement-Treated SandBy Takeshi Maki, Kh. Adeel Tariq
"The lateral resistance of the structure plays an important role during seismic event and it can be increased by using ground improvement. In this study an attempt has been made to investigate the eff
Jan 1, 2017
-
Emergency Jacking Tunnel in Compressible SoilBy Tai Luu, Michael McNicholas, James C. McIntyre
The Jersey City Municipal Utilities Authority (JCMUA), discovered that an existing sewer pipe had collapsed under the New Jersey Transit Conrail Railroad between Pine Street and Ash Street in Jersey C
Jan 1, 2019
-
Piles through Soft Clay for a Metro ProjectBy Sanjay Gupta, Sorabh Gupta, Ravi Sundaram, Abraham Varghese
"Geotechnical investigation for the Kochi Metro revealed a critical section of the Viaduct near Ernakulam Junction Railway Station. Four piers, located over a 220 m stretch, were passing through an ar
Jan 1, 2015
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 WaltonBy Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017
-
Thirty Years of Experience with the Wave Equation Solution Based on the Method of CharacteristicsBy Peter Middendorp, Gerald E. H. Verbeek
"This paper will describe a brief history of the method of characteristics as an accurate solution of the wave equation, and the author's experiences with the method of characteristics over a period o
Jan 1, 2005
-
Construction Of A New Quay Wall For A Sea Tank Terminal In The Port Of AntwerpBy Stefan Mewes
Europe’s second-largest seaport has installed a new combi wall consisting of pipe piles, sheet piles and inclined shaft grouted piles to support it. The new Liebherr piling rig with swinging leader wa
Sep 1, 2022
-
Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-WallsBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021
-
Recent Developments in Wind Turbine Foundation Design: Post Tensioned Single PierBy Mohsen Elsayed, Amr Sallam, Ahmad Mohamed, Xuebing Zheng, Mohamed Alrowaimi
The foundation is an essential component of the wind turbine that ensures continued operation under stable and safe conditions. Both shallow and deep foundations are utilized to support wind turbines
Jan 1, 2019
-
Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)By Ed Revoort, Robert Schippers
In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h
May 1, 2022
-
The Need For Air Control In Down The Hole Hammer Casing Advancement DrillingBy Frank J. Purcell
“Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou
Nov 1, 2022
-
Diaphragm Wall Technique Used In A Different Way Cutting Trenches Up To 823 Ft. (251 M) For An Exploration And Bulk Sampling ProgramBy Stefan Schwank, Alexander Blatt, Franz-Werner Gerressen
Diaphragm wall technique is usually used to install diaphragm walls, which are known as underground structural elements commonly used for retention systems and permanent foundation elements as well as
-
Alternative Design and Construction Method for Clinton CSO Underground Storage FacilityBy Meeok Kim, Paul Beljan, Gordon Chen
"Clinton combined sewer overflow storage (CSO) facility project developed by the Department of Water Environment Protection of Onondaga County, New York, is to improve sewer facilities and infrastruct
Jan 1, 2015