Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Estimation of Mineralized Veins: A Comparative Study of Direct and Indirect Approaches

    By A. Boucher, D. Marcotte

    "Abstract- The accepted practice for the estimation of thin (2D) vein deposits recommends the use of the grade x thickness service variable (i.e., the accumulation). Grade estimates are obtained indir

    Jan 1, 2001

  • CIM
    Leveraging Advanced Machine Data Systems to Drive Continuous Improvement in Mining Operations.

    CI, Data and Data Systems Road Analysis Control Quick and simple manual Analysis Case study Visual relation of analysis

    May 1, 2013

  • CIM
    Automated Fuel Inspection

    By J. Vanderlaan

    A proposed method of applying high-speed, non-destructive part scanning technologies to the production process of UO2 (Uranium Dioxide) fuel pellets is presented. The scanning process examines each pe

    Aug 1, 2010

  • CIM
    Buff Alo Ankerite Mine

    By A. R. Kinkel JR.

    "The Buffalo Ankerite mine is in the southern part of the Porcupine gold district of northern Ontario. The mine has a history of exploration and development reaching back to 1911, and has been operate

    Jan 1, 1954

  • CIM
    The Effect of Flotation Reagents on the Gold Sorption Kinetics and Gold Loading Capacity of Activated Carbon

    By Mohammad Mehdi Salarirad

    Fouling of activated carbon by different organic species is a great concern in carbon in pulp and carbon in leach circuits. The rate of gold adsorption onto activated carbon from synthetic gold soluti

    Oct 1, 2011

  • CIM
    Continuous wave Nd:YAG laser welding of ZE41A-T5 magnesium sand castings: conduction or keyhole mode

    By M. Xian, M. Jahazi, Y. L. Lin

    The 2-mm butt joints of ZE41A-T5 sand castings were laser welded at different defocusing distances on two surface conditions (as-cast or machined) using a continuous wave 4 kW Nd:YAG laser system at a

    Jan 1, 2004

  • CIM
    Solution Management at the Mantoverde Division of Anglo American Chile

    By U. Troncoso

    Mantoverde is a heap leach-SX-EW operation that was commissioned in December 1995 at a production rate of 42,130 ton of copper per year and 5.4 million ton of ore per year. Copper production has been

    Jan 1, 2007

  • CIM
    The Treatment of Waste Slag Containing Hexavalent Chromium Using Sintering Method

    By Z. -G. Ren, J. -S. Qian, Y. -G. Yang

    The waste slags from chemical and metallurgical plants contain approximately wt 1% water soluble Cr6+. This hexavalent chromium is very harmful to human health, and the treatment of the slags has conc

    Jan 1, 2004

  • CIM
    Experimental study of the elastic behavior of model refractory materials

    By J. C. Glandus, N. Tessier-Doyen, M. Huger

    The Young's modulus of bi-phased model materials (vitreous matrix containing spherical alumina inclusions) have been determined by two complementary approaches: experimental and analytical. If th

    Jan 1, 2004

  • CIM
    Advanced characterization of a stress corrosion crack from an in-field serviced X-52 steel line pipe

    By Jian Li, V. Y. Gertsman, David C. Katz, M. Elboujdaini

    Analysis of stress corrosion cracking (SCC) usually involves high-end analytical tools including scanning electron microscope (SEM) and analytical transmission electron microscope (TEM). In recent yea

    Jan 1, 2004

  • CIM
    Abandoned but not Forgotten - The Recent History of Copper Hydrometallurgy

    By F. Habashi

    In the period 1970-1995, a number of hydro metallurgical processes to treat copper concentrates to overcome the pollution problem due to S02 emission in smelters were developed. Pilot and commercial s

    Jan 1, 2007

  • CIM
    Dissolution-Precipitation Processes on the Surface of Uranyl-Minerals

    By Michael Schindler

    Uranyl mineral dissolution appears to be complex, affected by factors such as solution pH and the presence of various cations in solution, and sometimes involving formation of secondary surface precip

    Aug 1, 2010

  • CIM
    SAG Mill Testing - An Overview of the Test Procedures Available to Characterize Ore Grindability (7d09426f-a588-4545-9380-122077c30324)

    By F. O. Verret, A. McKen, G. Chiasson

    Several grindability tests were developed over the years to design grinding circuits or optimize existing operations. Each test has its own strengths and weaknesses and it is imperative to select the

    Jan 1, 2012

  • CIM
    Coal Resource Base in Poland from the Perspective of using the JORC Code

    By Sobczyk

    The article will present a comparison of classifications of resources according to the JORC Code System with Polish classification, basing on system used in Eastern Europe. The differences between the

    Aug 1, 2013

  • CIM
    The Navachab Optimisation History; Exceeding SAG Performance Benchmarks (f5436527-39a2-4fcf-bc24-e97b0f996808)

    By H. Wilhelm, W. I. van Drunick

    The Anglogold Ashanti (AGA) Navachab single stage SAG mill has provided an excellent setting for incremental optimization. Over the past decades, several interventions have resulted in marked improvem

    Jan 1, 2012

  • CIM
    Support Effect in Aromatics Hydrogenation over Au-Pd/SiO2-Al2O3 Catalysts

    By Anna Maria Venezia

    Bimetallic Au-Pd catalysts supported on amorphous silica-alumina (ASA) with vary amount of alumina (0, 8, 14, 28 and 100%) were prepared by the simultaneous reduction of palladium and gold precursors

    Oct 1, 2003

  • CIM
    Building community relations and community development strategies from day one: A case study of the Inmet Mining/Monkey Forest experience in a complex socio-political context.

    By Craig Ford

    Inmet Mining is committed to implementing the highest corporate responsibility standards in its mining operations worldwide. Inmet is 100% owner of Minera Panama, a world-class copper project that is

    May 1, 2010

  • CIM
    Mudrush Risk Evaluation

    By A. R. Guest, R. Clayton, J. Jakubec

    "The potential for mudrushes is a potential hazard that should be evaluated during cave mining studies. Mudrushes are a phenomenon that can have very different origins, but produce the same results: i

    Jan 1, 2016

  • CIM
    Key Performance Indicator on Benefits of BSC-based BIM and Validation Methods

    By Chan-ho Park

    As the building has recently become bigger, higher, and freeform, a technology called BIM(Building Information Modeling), which is a key technology that integrates construction and IT(Information Tech

    Aug 1, 2013

  • CIM
    The Derni Cu-Co Massive Sulfide Deposit, Qinghai Province, China: Ultramafic Volcanic-hosted Submarine-exhalative Mineralization

    By Yuwang Wang, Yanggeng Tan, Kezhang Qin, Zengqian Hou

    Abstract- The large Derni Cu-Co (-Zn) deposit in Qinghai Province exhibits unusual geological features, and its genesis is controversial. Based on previous research and detailed field investigations,

    Jan 1, 2000