Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Path Planning and Position Control for Autonomous Loading Operation by Wheel LoaderAuthors have been conducting research on autonomous loading operation by wheel loader. Autonomous loading cycles has been demonstrated with real size experimental model. In V shape loading operation,
Dec 6, 2010
-
Surveying the 1,480 Ft Level Drive, Broken Hill South Limited, Broken HillThe 8 ft by 91/2 ft drive which joined No. 7 Shaft with Browne Shaft on the 1,480 ft level was extended from both ends and met at a point approximately 12,000 ft from No. 7 (2,000 ft from Browne).The
Jan 1, 1965
-
Broken Hill Ore Chute DesignTHE Broken Hill mining field, approximately 31 miles in length, is at present being exploited by seven companies, viz. : North Broken Hill Limited, Junction North Broken Hill No Liability, Broken Hill
Jan 1, 1925
-
A Detailed Assessment of Concentrator Performance at Broken Hill South LimitedBy S B. Stewart, C J. Restarick
Over a four-hour period of steady plant operation samples were taken at regular intervals frum points within the grinding and flotation circuits. Size fractions of each composite sample were analysed
Jan 1, 1971
-
Magnesia from magnesite by calcination/carbonic acid leaching: Effect of magnesite/dolomite ratioBy Moorrees C, Koh P. T, Tsambourakis G
Calcination of samples from the Savage River region of Thsmania containing varying magnesite/dolomite ratios under conditions optimized for the magnesite component, followed by carbonic acid leaching
Jan 1, 1987
-
Swelling of High Grade Iron Ore Pellets Reduced by Hydrogen in a Fixed BedA study of the swelling behaviour of a single batch of high-grade iron ore pellets during hydrogen reduction in a fixed bed showed that the extent of swelling is governed by the nucleation and growth
Jan 1, 1978
-
The JKMRC - A Case Study in the Postgraduate Training of Engineers for the Mineral IndustrySince its inception in 1962, the Julius Kruttschnitt Mineral Research Centre has adopted the view that an effective method of training highly qualified engineers for the mineral industry is the pur
Jan 1, 1989
-
The McArthur Lead-Zinc-Silver DepositBy S Jephcott
The McArthur lead-zinc-silver deposit is of the stratiform type. It consists of a mineralised bituminous shale sequence containing some tuffites, numerous graded beds and isolated slump breccia horizo
Jan 1, 1971
-
Evaluation of Comminution Circuit Design for Sustainability Using EcoNomicsTMEvaluation of Comminution Circuit Design for Sustainability Using EcoNomicsTM
Sep 13, 2010
-
Observations on the Zinc-Lead Lode at Rosebery, TasmaniaThe zinc-lead lode at Rosebery, on the West coast of Tasmania, has a total length of over 4000 ft. It consists of five elongated lenses parallel to the foliation planes of the quartz sericite schist,
Jan 1, 1934
-
Waihi Basin Structure in Light of Recent Geophysical SurveysBy R L. Brathwaite
As part of an investigation of the deep structure of the Waihi Basin, an extensive set of resistivity measurements was recently collected by DSIR Geology & Geophysics. The objective of this work i
Jan 1, 1991
-
Presidential Address 1961 The Modern Ferrous Metallurgical RevolutionThis Institute, by nature of its charter, draws on various persons in the mining and metallurgical world of Australasia for its President from year to year, and consequently when the presidential addr
Jan 1, 1961
-
Migration of Gold During BoringThe following data cover a phase in the systematic testing of gold deposits which does not appear to have been specificalIy investigated.In boring either secondary or primary deposits, gold, by virtue
Jan 1, 1950
-
Optmization of Copper Electrowinning at High Current DensitiesA detailed study of the capital investment and production cost for copper electrowinning plants shows that significant savings in both can be achieved by increasing the current density. From the econo
Jan 1, 1972
-
Underground bulk sampling, uniform conditioning and conditional simulation – unrealistic expectations?By I Clark, S C. Dominy
Bulk sampling programs are typically applied in coarse gold mineralised systems to verify resource/reserve grades. In recent years, there have been controversies surrounding some results of undergroun
May 9, 2017
-
Production of High-Quality DR Grade Pellets at IMEXSABy Arndt C. R
The Ispat Mexicana SA de CV (IMEXSA) pelletising plant is located at Lazaro Cardenas on the west coast of Mexico. It is the primary source of feed stock for the adjacent direct reduction (DR) plants
Jan 1, 1999
-
Development of the All-Flotation Process at Zinc Corporation Limited, Broken HillThe ore milled from the Lead Lode of The Zinc Corporation leases consists of a fairly granular mixture of galena, marmatite, chalcopyrite, tetrahedrite, pyrrhotite, pyrite, and lollingite with a gangu
Jan 1, 1941
-
Possible Mechanisms for the Production of Foamed Blast Furnace SlagsSolid. dense, air-cooled slag can fulfil most, if not all, the functions of natural stone for civil engineering purposes. The value of pumice, also, has long been appreciated, and processes for the ma
Jan 1, 1963
-
Indicator and Quartz ReefsDuring the past Two years in reef gold mining, "indicators" have received great attention at the hands at the Victorian gold seekers. Many years ago, what was caned the" indicator lode,
-
Mineralogical Assessment of a Churn-Drill Core form an Alluvial Tin DepositSome of the problems associated with drill core evaluation of alluvial tin deposits and correlation with plant-scale recovery are discussed. Panning churn-drill cores on site tends to undervalue such
Jan 1, 1970