Pump and Other Equipment Component Rehabilitation at Isa Mine, Mount IsaA pilot pump rehabilitation programme commenced at Isa Mine in the late 1960ts. Over the years, it has now been developed into a full scale repair programme resulting in large operating cost saving
Jan 1, 1978
-
Differential Flotation Commissioning at TelferBy C R. Headley, S O. Hille, N P. Jacob
The redevelopment of the Telfer Gold Mine in the Pilbara region of Western Australia was primarily based on the construction of a 17 Mtpa dual train concentrator coupled with open pit and underground
Jan 1, 2007
-
Critical Comparison of Julius Kruttschnitt Mineral Research Centre (JKMRC) Blast Fragmentation ModelsBy I Brunton
Blast fragmentation can have a significant impact on the profitability of a mine. An optimum run of mine (ROM) size distribution is required to maximise the performance of downstream processes. If thi
Jan 1, 2001
-
Mount Isa Mines Copper Concentrator - An Insight into Current and Historical PracticeBy P Radulovic, W Y. Lui
The Mount Isa Mines (MIM) copper concentrator at Mount Isa processes both chalcopyrite ore from the MIM underground mine and rotary holding furnace (RHF) slag from the MIM copper smelter. There have b
Jul 15, 2013
-
Adsorption of Organic Dye Depressants on Carbonaceous Sulphide OresOrganic dyes such as nigrosine and sun yellow act as depressants for carbonaceous particles in the, flotation of sulphide ores. Depression is achieved when initially hydrophobic organic surfaces are
Jan 1, 1975
-
The Social Aspects of Environmental Impact Studies in QueenslandBy Morgans DJ
The aim of this paper is to highlight the social aspects involved in the preparation of environmental impact studies (E.I.S.'s) for mining developments. In particular, the paper will reveal t
Jan 1, 1987
-
Technical and Economic Coparison of Gaseous Based Direct Reduced Iron (DRI) Production TechnologiesCurrently there is considerable interest in the production of DRI in Western Australia to take advantage of intense interest from the Asian market. Most DRI is produced using gas-based processes and
Jan 1, 1996
-
Computer Simulation of Underground Room and Pillar MiningBy Szymanski J
The problems associated with underground mining continue to grow in size and complexity. As a result mine management is becoming aware of the benefits that can be achieved through the use of compute
Jan 1, 1995
-
Iron Ore Sintering Research at Different ScalesBy J Khosa, J Manuel
Iron ore sintering is very complex with many interdependent variables. For the same ores, the sinter quality and sintering performance may vary significantly with the scale at which the sintering test
Jan 1, 2007
-
Hydrogeological Testing in Underground Holes during GroutingThe development of the SECV brown coal open cut at Loy Yang will require depressurisation of aquifers both within and below the coal seam sequence in order to maintain open cut stability. Prediction
Jan 1, 1988
-
Grinding, Pulp Chemistry and Particle FlotabilityIn this paper the reactions which may lead to particle hydrophobicity/hydrophilicity as a function of grinding environment-are reviewed. The results of pulp chemical investigations related to a Cu-
Jan 1, 1993
-
Some Regolith Evolution Features of the Goonumbla Cu-Au District: Consequences on Geochemical ExplorationBy Eggleton T, Taylor G
The lateral and vertical distributions of gold and a wide range of other elements in the regolith, close to Au and Cu mineralisation have been investigated at Goonumbla, NSW. Open cut mining has ex
Jan 1, 1997
-
Evaluation of a Laser Online Ore Sizer at the WMC Leinster Nickel OperationBy L Crew, S Jackson
A trial of an Adept Online Ore Sizer (OOS) was undertaken at the WMC Leinster Nickel Operation (LNO) in the first half of 2000. During this time the On Line Ore Sizer has been shown to be a robust and
Jan 1, 2000
-
Commissioning of the Bindura Pressure Leach PlantBy Channon W, Dube M, Makwana M, Kerfoot D. G
In early-1995, the Bindura Nickel Corporation commissioned a pressure leach plant at its Smelter and Refinery complex located in Bindura, Zimbabwe. The novel pressure leach process was developed by
Jan 1, 1996
-
Cost Comparison of Blasting and Mechanical ExcavationBy Yokozawa K, Yamamoto T, Kameoka Y
Japan Construction Method and Machinery Research Institute has been conducting various field surveys of tunnel works and other excavation works, and the cost and efficiency of these two excavation
Jan 1, 1987
-
Long-Term Performance and Cost Benefit Analysis of Passive Acid Mine Drainage Treatment Systems Installed in the Appalachian Coal Region of the Eastern United StatesBy J S. Simmons, J G. Skousen
This project evaluated the performance of nine passive treatment methods by studying 137 treatment units in eight eastern states. Performance was normalised according to construction cost, projected s
Jan 1, 2003
-
Applied Coal Petrography at ACIRLBy Reifenstein A
ACIRL's petrographers apply microscopic techniques to coal exploration, production, preparation and processing problems and research investigations as well as provide a commercial service for
Jan 1, 1989
-
Gas Power Generation at the Sons of Gwalia Mine, W.A.By Dunstan N, Valentine C
Gas power was first used on the Sons of Gwalia mine in January 1911, when a twin-cylinder Crossley engine of 167 hp was installed to belt-drive a 112 kw 550-volt ac generator. This engine was connecte
Jan 1, 1932
-
Stockpiles and Their Role in International Resource ManagementProposals designed to use stockpiles and buffer stocks to achieve price stabilization and better resource use have a long history. They are super- ficially simple to understand. The benefits seem c
Jan 1, 1978
-
A Geomechanical Assessment Of Thick Seam Mining Methods With Regard To Their Application To Australian Black CoalsBy Rawlings C. D
An assessment is made of the potential for thick seam underground mining of black coal in Australia. A brief summary is given of the geomechanical environment and previous mining history existing
Jan 1, 1980