Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geophysics of the Honeymoon Well Nickel Deposits, Western Australia

    The Honeymoon Well nickel sulphide deposits are located in the Agnew-Wiluna greenstone belt, about 45 km south of Wiluna. Both disseminated and massive sulphide nickel deposits are hosted by komati

    Jan 1, 1996

  • AUSIMM
    Computer Simulations to Enable Continuous Blending to Two Plants at Sishen Mine From the Medium-Term Point of View

    Sishen uses a state-of-the-art tracking system to track material from its position in blast blocks through various stockpiles and crushers. Qualities are blended directly to the crusher as opposed to

    Jan 1, 2005

  • AUSIMM
    Using novel methods to characterise slag films for continuously casting challenging and innovative steel grades

    By X Yang, T Zhang, Z Li, Z Yan, M A. Williams, S Qin, P Wilson

    Continuous development of complex new steel grades to meet the ever-increasing demand of high performance causes recurrent issues in steel continuous casting such as surface quality defects (eg cracks

    Jun 19, 2024

  • AUSIMM
    A comparison of opportunity and risk in deep-sea and terrestrial mining projects

    By I Lipton

    The existence of metalliferous mineral deposits on the deep-sea floor has been known since manganese nodules were discovered in the Arctic Kara Sea in 1868. Modern exploration to define commercially v

    Nov 21, 2018

  • AUSIMM
    In support of frontline leaders

    By A Kite

    Frontline leaders play a critical role in the safe and productive operations of Australia’s mining, resources and heavy industries. These leaders set the workplace culture, especially during night shi

    May 5, 2022

  • AUSIMM
    Developments in Coal Mine Tailings Disposal and Rehabilitation

    The conventional approach to the disposal of fine coal mine tailings, which involves piping the tailings as an aqueous slurry to a storage where they remain in the form of a permanent wet deposit,

    Jan 1, 1991

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    Real-time Through-belt Moisture Analysis for Iron Ore

    By A Harris, L Balzan

    Accurate measurements of the moisture content of iron ore have increasing importance in modern mining operations. Knowledge of the moisture content allows process control actions to be carried out to

    Jul 13, 2015

  • AUSIMM
    Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut Operations

    Anglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines

    Nov 25, 2010

  • AUSIMM
    The Commercial Application of the New Two-Stage Jones WHIMS Process for Martitic Iron Ores at the Fßbrica Mine of Ferteco Mineratpo SA, Brazil

    By Heyer T, Wasmuth H-D

    The concentrator plant of Fahrica Mine, that started production in 1977, was using nine Jones wet high intensity magnetic separators (WHIMS) of the standard type DP 317 with a 1.5 mm gap width for t

    Jan 1, 1993

  • AUSIMM
    Public Affairs/Community Relations for Minerals Projects

    Modern minerals projects face serious challenges in earning and maintaining acceptance by their key stakeholders. Factors which underpin effective response to managing these challenges include cons

    Jan 1, 1997

  • AUSIMM
    Methane Drainage in Retreating Longwall with Single Gateroads

    The need to solve the problems associated with spontaneous combustion, system of ventil- ation and methane drainage in gassy coal mines has brought about the development of mining and degassing meth

    Jan 1, 1982

  • AUSIMM
    Gas Dispersion Measurements in Industrial Flotation Cells

    By D Alexander

    For nearly 100 years, the flotation plant metallurgist has often wondered what is happening æbeneath the frothÆ. To assist in unravelling this mystery, new technology has been developed as part of the

    Jan 1, 2005

  • AUSIMM
    Enough is Enough ù Environmental Fallacies Confronted by the Mining Industry

    For too long we, as an industry, have borne the brunt of irrational claims, poor science and even worse, journalism with regards to our affect on the environment. To some of us, the overwhelming media

    Jan 1, 2004

  • AUSIMM
    Hydrothermal Rare Earth Element Mobilisation Processes in the Yinachang Fe-Cu-(REE) Deposit, South-west China

    By X Li, M-F Zhou

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Yinachang deposit in south-west China contains large amounts of Fe, Cu and rare earth e

    Mar 18, 2015

  • AUSIMM
    Geology and Mineralization of the Golden Valley Volcanic Centre Northeast Queensland.

    The Golden Valley Volcanic Centre has been recently interpreted as being a combination diatreme breccia pipe and rhyo-dacite flow dome complex of Permo-Carboniferous age that intrudes basement granito

    Jan 1, 1990

  • AUSIMM
    Some Recent Changes and Innovations at Mount Isa Mine

    The planned extraction of deeper copper ore at Isa Mine has necessitated a review of existing equipment and methods to contain costs and improve working conditions. Mining is in progress for a cru

    Jan 1, 1984

  • AUSIMM
    The University of Melbourne's Approach to Solving the Problems of Education and Research in the Extractive Metallurgy Area

    Australia as a leading producer of mineral sands has also occupied a leading position in many areas of research'in the processing and applications of these minerals. Research in upgrading ilm

    Jan 1, 1986

  • AUSIMM
    Draw Control Optimisation along the Production Drift in Sublevel Caving Mines

    By A Gustafson, G Shekhar, P Boeg-Jensen

    The amount of material extracted from each blasted ring in sublevel caving mines is vital when deciding the overall mine production target. The orientation of the production drifts is normally perpend

    May 9, 2016

  • AUSIMM
    Earth Moving - Route 3/LFC Advance Earthworks Contract, Hong Kong Surface Blasting Experience

    By Ngai WCT

    Over 90 per cent of the explosives in Hong Kong are used in civil engineering works. The Hong Kong Government controls all explosives and delivers on a daily basis to each site which it has licensed

    Jan 1, 1995