Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Green Mine Campaign and Sustainable Mining in China

    By X Li, J Wang, D Liu, Y Liu, K Hu

    "Since the adoption of open-door policy 30 years ago, rapid economic growth has resulted in serious resource depletion and environmental destruction, especially in mining areas. As an urgent response

    Jul 10, 2012

  • AUSIMM
    A guide to ground disturbance permitting and managing ESG risk

    By H Arvidson, B Spence, S Helm

    Mining is the art of disturbing ground. All phases of a mine’s life cycle from exploration to building and operating a mine, through closure, has a physical impact on the earth. There is currently inc

    Sep 18, 2023

  • AUSIMM
    Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough Times

    By P Moynagh

    "A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua

    Nov 15, 2016

  • AUSIMM
    The SNIM Guelb II Project in Mauritania – Process Design Challenges

    By G Cooper

    The Société Nationale Industriel et Minière (SNIM) is expanding its ore and concentrate production capacity in Mauritania, West Africa. This government-controlled mining company has bee

    Jul 11, 2011

  • AUSIMM
    Cogenetic Formation of the Peralkaline Syenite and Oxide Ore-bearing Layered Gabbroic Intrusion of the Baima Igneous Complex, Emeishan Large Igneous Province, South-west China

    By J G. Shellnutt, Y Iizuka, T W-Y Hsia, T-C Liu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of magmatic oxide ore deposits hosted in chemically-evolved layered gabbroic

    Mar 18, 2015

  • AUSIMM
    Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto Way

    By G Danckert

    The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat

    Jul 11, 2011

  • AUSIMM
    Spontaneous combustion hazard assessment of McArthur River Mine waste rock

    By P Marianelli, J Theiler, B Beamish, A Spillman

    The presence of reactive pyrite in waste rock contributes to the hazard of spontaneous combustion in emplacement facilities as it acts as an initiator of self-heating at low ambient temperatures. Orga

    Jul 23, 2018

  • AUSIMM
    Study of Native Micro-Organisms in Bioleaching Processes of Refractory Auriferous Minerals and its Use as a Tool for Bio-Regeneration

    By V Sanmartfn, J Torracchi

    The broad biodiversity of our country is manifested through several different biological forms. From the villages of Portovelo and San Gerardo in the southern part of Ecuador, some samples of water an

    Jan 1, 2004

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Discovery of the Corunna Downs Deposits

    By P J. Howard, P Darvall, J H. Mainwaring

    In less than a year, Atlas Iron’s Corunna Downs Project has moved from a new discovery to a substantial resource of high quality in an underexplored greenstone belt. Located approximately 170 km south

    Jul 13, 2015

  • AUSIMM
    Do We Maximise the Value of Our Operations through Our Definition Drilling, Resource Estimation and Mine Planning Strategies?

    By S O’Connell, M Scholz, A Robertson, M L. Bloss

    The value created in any mining operation is a function of the mine plan. The quality of this plan is dependent on the strategies employed during definition drilling, resource estimation and mine plan

    Jun 22, 2016

  • AUSIMM
    Vertical Crater Retreat Pillar Mining-A Case Study

    The Vertical Crater Retreat (VCR) mining method was used to mine two rib pillars at New Broken Hill Consolidated Limited (NEHC) mine at Broken Hill. Experience gained in a trial VCR pillar stope w

    Jan 1, 1983

  • AUSIMM
    Removal of phosphorus and gangue minerals from iron ore by a combined approach of alkaline drying and reverse flotation

    By A Batnasan, K Haga, A Shibayama, K Higuchi, H Takeuchi

    High silica (SiO2), alumina (Al2O3), and phosphorus (P) contents in iron ore adversely affect the quality of iron products. The removal of those impurities from iron ore is an essential point in furth

    Sep 18, 2023

  • AUSIMM
    Clem Jones Tunnel – A Study of the use of Precast Concrete for Quick and Efficient Construction

    By M Hawkins

    The Clem Jones Tunnel (formally known as the North-South Bypass Tunnel), a A$2.88 billion road tunnel project in Brisbane, Queensland, was successfully completed almost seven months ahead of schedule.

    Mar 8, 2011

  • AUSIMM
    Case Study – Application of RISKGATE to Managing Strata Failure in an Australian Coalmine

    By J Harris, J Turner, P Kirsch

    Coal mining is recognised globally as a hazardous activity, and as a result operates under high levels of regulatory and public scrutiny while managing a workforce operating in a high-risk environment

    Nov 5, 2014

  • AUSIMM
    Risk-Based Ore Selection from Conditionally Simulated Block Models

    By J E. Everett, F Grobler

    This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo

    Aug 12, 2013

  • AUSIMM
    Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case Study

    By I Elias, E Moya, S Chaffer

    This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage

    Jul 13, 2015

  • AUSIMM
    Application of three lines model in resource and reserve estimation and reporting

    By D Hope, D K. Mukhopadhyay, J D. Harvey

    South32 (S32), a globally diversified mining and metals company, is listed on securities exchanges around the world (ASX, JSE, LSE), with its primary listing being on the Australian Securities Exchang

    May 24, 2023

  • AUSIMM
    Geological Modelling and Bench Face Survey to Improve Blasting Fragmentation

    By E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos

    Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio

    Aug 24, 2015

  • AUSIMM
    Quantifying iron ore ‘handleability’ to reduce processing plant delays

    By P Cherepanskiy, G Elphick, R Hus, C Perring

    When an iron orebody nears its end of life, the extracted material can become increasingly problematic to handle. Higher moisture content occurs as larger portions of originally-below-water-table mate

    Jun 22, 2022