Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle Mill

    By V Lawson

    Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the

    Aug 8, 2011

  • AUSIMM
    A Cost Comparison between Empirical and Engineered Support and Reinforcement Designs for Tunnels in a Low Stress Environment

    By L Nienaber

    Mines, after becoming operational, often retain the same support and reinforcement designs developed in the feasibility study. These designs are conceived from limited drilling data and regional exper

    Mar 8, 2011

  • AUSIMM
    Development of Effective Rehabilitation Protocols for Mineral Sands Mining in Virginia, USA

    By W L. Daniels, C Stilson, C Zimmerman

    Mineral sands mining for ilmenite, rutile and zircon has disturbed over 1000 ha of prime farmland in Virginia (USA) since 1997 and additional areas are likely to be disturbed in Virginia and North Car

    Jul 10, 2012

  • AUSIMM
    Unlocking value chain optimisation with a digital mining system

    By S Gulati, N Sarkar, T Vink, S Battersby, L Okada

    This paper examines a successful project implemented by BHP Mitsubishi Alliance (BMA) and the Polymathian team at Deswik, aimed at enhancing short-term scheduling processes to reduce vessel turn times

    Sep 1, 2024

  • AUSIMM
    Design and Engineering of Flotation Circuits (in Australia)

    By D Mcleod, S Brindley, S Green

    The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit

    Jan 1, 2005

  • AUSIMM
    Geology, Grade Control and Reconciliation at the Douglas Mineral Sands Deposit

    The Douglas mineral sands deposit is located 75 km north of Hamilton in western Victoria, Australia. The deposit was discovered in the late 1990s by Basin Minerals Limited and purchased by Iluka Resou

    Jan 1, 2009

  • AUSIMM
    Improving Drive Stability through Efficient Development Blasting Design and Practices

    By P Klaric

    Drive stability is critical in block/panel cave mining. The production levels of these mines are required to remain operational for the entire life-of-mine which can be in excess of 30 years. It is th

    Aug 24, 2015

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Improvements on Estimation Tools and the Effect on Mineralisation Base Definition on the Zulti North Heavy Mineral Sand Deposit, Richards Bay, Kwa-Zulu Natal, South Africa

    By J M. Nel

    Richards Bay Minerals (RBM) has recently undertaken an exercise to improve orebody basal definition. Older mineralisation bases (pre-2005) were highly erratic using old protocol reverse circulation (R

    Oct 5, 2011

  • AUSIMM
    The Bougainville Copper Project

    The mining. operations of Bougainville Copper Pty Limited are located at Panguna on the Island of Bougainville which is part of the Territory of Papua and New Guinea. Mineralisation in the Panguna ar

    Jan 1, 1970

  • AUSIMM
    Predicting and modelling Bond Work Index using chemistry (as a proxy for mineralogy)

    By K Gardner, R Fraval, V Singh

    Using new technology to create optimised infill drill programs in underground or open pit settings, it is possible to quantify the value of a drill program. The computer designed programs are optimise

    Mar 22, 2022

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    Effect of mill-scale and calcined dolomite on high Al2O3 sinter and its reduction behaviour

    By S J. Kim, S W. Kim, L Tomas da Rocha, S Jung

    Al2O3 has been regarded as a harmful gangue component in iron ore, especially causing reduction degradation in industrial sintering of iron ore. The current study aimed to utilise low-grade iron ore c

    Jun 19, 2024

  • AUSIMM
    Implicit Modelling Applied to Grade Control Data

    By J Ireland, S Rose

    The main outcomes of mining grade control include defining the boundary between ore and waste and then categorising the ore according to which stockpile it should be sent. A typical workflow includes

    Aug 18, 2014

  • AUSIMM
    The Failure of Steel Rock Drill Rods by Fatigue

    A sample of fifty fractured low chromium-molybdenum alloy drill steel rods was investigated. Each rod was of the forged collar integral tungsten carbide type in common use in Australia.Examination of

    Jan 1, 1955

  • AUSIMM
    The Spent Pot Lining Treatment and Fluoride Recycling Project

    By G Swayn, J Harpley

    Spent Pot Lining (SPL) is an unavoidable waste product of the electrolytic process in the smelting of aluminium. SPL is considered to be a hazardous waste in various countries because it contains sign

    Jan 1, 2002

  • AUSIMM
    Application of Ground Magnetic Surveys over Heavy Mineral Sand Strands to Increase Confidence in the Interpreted Continuity of the Modelled Resources

    By V O’Brien

    The suitability of magnetic surveys flown at low altitudes to identify buried heavy mineral (HM) strands has long been accepted. This is despite the low intensity magnetic response often obtained from

    Oct 5, 2011

  • AUSIMM
    The Obuasi Mine - Longitudinal Retreat Mining Method Application and Challenges

    By F Owusu-Mensah, F Nsarko

    The Obuasi Mine has been in operation for the past 100 years. Within this period a host of mining methods have been employed during its various changing phases. The causes for the changes are multiple

    Mar 26, 2012

  • AUSIMM
    Mining Under Indonesia's New Environmental Law

    The new law on Environmental Protection and Management (Republic of Indonesia Law 32 of 2009) was passed by the Indonesian parliament in September 2009. This law aims to protect Indonesia's rapid

    Jun 1, 2010

  • AUSIMM
    Post Closure Management of the Mt Leyshon Gold Mine - Water the Integrator

    By T Baumgartl, D Mulligan, R Haymont

    Mining at the Mt Leyshon Gold Mine in semi-arid north Queensland stopped in 2002. Newmont Australia has recently initiated a thorough post-closure water management study of the site by revisiting the

    Jan 1, 2006