Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho

    May 24, 2023

  • AUSIMM
    Selection of Mine Water Management Options Considering both Water and Energy Impacts

    By M T. Nguyen, S Vink, M Ziemski

    On any given mine site the water system is contingent upon its initial design. Through time the initial design is adjusted by a myriad of water management options in order to improve water system perf

    Nov 26, 2013

  • AUSIMM
    Heat Load Estimation from Conveyor Systems in Mass Mines

    By R Moreby, J Kok, L van den Berg

    The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems

    Aug 31, 2015

  • AUSIMM
    Moisture/particle interactions under oscillatory motion – model development

    By K Williams, A Lavrinec, V Gurung, D Ilic

    The moisture content of iron ore during handling can range from the dust extinction moisture at the point of arrival at the port to the transportable moisture limit at the point of loading ships for m

    Sep 18, 2023

  • AUSIMM
    Research Needs in Regard to Design, Performance Criteria, Construction, Maintenance Assessment and Repair of Coal Mine Seals

    Legislation introduced for Queensland and New South Wales Coal mines provides different levels of prescription regarding specification of mine seals û generally in relation to capacity to withstand ov

    Jan 1, 2005

  • AUSIMM
    Mobile Crushing/Sizing Systems for Modern Open Cast Mining - A Case Study of Mae Moh Phase 5 Project, Thailand

    By R Bunduwongse

    The oil crisis had repercussions throughout the world and most importantly on mining, where the drive to reduce the use of liquid fossil fuel led directly to the appearance and subsequent growth in th

    Jan 1, 2007

  • AUSIMM
    The CSA ventilation upgrade – geotechnical challenges and learnings

    By T M. Brettell, D Sidea

    The CSA Mine is located in Cobar, New South Wales and is operated by Glencore. Large scale underground production started from 1965, with zinc, lead, silver and copper extracted in the past. The curre

    Oct 16, 2017

  • AUSIMM
    Practical Approaches to Managing Business Critical Water Risk

    By A Tang, K Ringwood

    "Water is increasingly being recognised as a material business risk that many companies are still not well-equipped to deal with. Despite a raft of water-risk focused initiatives, methodologies and gu

    Nov 26, 2013

  • AUSIMM
    Water Treatment at the Waihi Gold Mine

    By B Twidle, D Bertoldi, J Meikle, R Dunne

    The Waihi Gold Mine is situated in a high rainfall area (annual average of over 2 m) on the North Island of New Zealand. Water treatment and discharge at the mine has been ongoing for the last 25 year

    Sep 26, 2013

  • AUSIMM
    Development and Implementation of Spin-to-stall Resin at Anglo American’s Australian Underground Coal Operations

    By P Craig, I Canbulat, J Naylor, J Emery, A Sykes

    Longwall mining is by far the most common method of underground coal extraction in Australia. Industry trends and expectations are placing increasing emphasis on the reliability and productivity of th

    Nov 5, 2014

  • AUSIMM
    Comparison of Vein Styles and Distributions Between Rhyolite- and Andesite-Hosted Epithermal Gold-Silver Deposits of the Hauraki Goldfield, New Zealand (06c3b072-9151-48ab-ab31-f3f90e69a1e6)

    By Christie A. B, Swain A, Brathwaite R. L

    This study provides quantitative data on vein distributions within seven selected epithermal systems, four deposits hosted predominantly in rhyolitic rocks: Ohui, Wharekirauponga, Neavesville and Kom

    Jan 1, 1995

  • AUSIMM
    The Applicability of Endless and Direct Rope Haulage Technology for Transportation Systems on Decline Shafts

    By E N. Sparg, O D. A Deuchar, F Needham

    Decline shafts are an attractive option to both new and existing mining operations where there is a need to access an inclined orebody deposit via on-reef development so as to generate a return in the

    Jan 1, 2005

  • AUSIMM
    Commercial Underground Space – Planned Development for the Future

    By A C. Robertson

    World urban expansion puts constraints on the available land surface area of our major cities both for accommodating people as well as providing infrastructure and services whilst at the same time att

    Sep 17, 2014

  • AUSIMM
    A Case for Revision of Time-Honoured Mine Ventilation Design Parameters through Active Field Observations

    By B Belle

    "Mines around the world are inherently and operationally diverse. Current methodologies for the design of mine ventilation and cooling infrastructure involve controlling major safety and health hazard

    Jun 1, 2012

  • AUSIMM
    Use of a Crane Mounted Auger for Presink Construction at Fosterville Gold Mine

    By P Jones

    Fosterville Gold Mine is an underground operation located approximately 20 km northeast of Bendigo and 170 km north of Melbourne. Fosterville is the most productive gold mine in Victoria, producing ov

    Mar 21, 2011

  • AUSIMM
    Jaguar Raisebore design using LiDAR for back analysis

    By R P. Varden

    This paper looks at the design of the Bentayga raisebore with subsequent back analysis using a LiDAR survey. A search for LiDAR raisebore assessment publications shows little work has been done on thi

    Mar 15, 2021

  • AUSIMM
    Performance of a Drainage Tunnel and Subvertical Drain System

    By J Y. C Lo

    The construction of two drainage tunnels and the associated subvertical drain system at the Po Shan area in Hong Kong was completed in December 2009. This project is the first of its kind to utilise d

    Mar 8, 2011

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    Applications of Ceramic Wear Materials in the Gold Industry

    By R Stead

    So many ceramics look the same, but are they?In the past 20 years, there have been significant changes in the materials available, as well as changes to the supply chain, for ceramics used in wear app

    Sep 26, 2013

  • AUSIMM
    The Downward Trend of Mining - Infrastructure Costs

    By Glassock C. D

    Most Australian mining projects are becoming smaller, more remote and with lower grades of ore. Their small size has been making it harder for mining companies to absorb the large infrastructure co

    Jan 1, 1997