Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Auger Pressure Grouted Displacement Piles Installed & Tested On The Margins Of The San Francisco Bay ? Part OneBy Christian Divis
[ ]
Jan 1, 2002
-
Strategies for Mining in the Vicinity of the Creighton Fault at Vale?s Copper Cliff MineBy Mehdi Razavi
Scope of the Study The possibility and risk associated with mining two stopes at the same time The influence of Creighton Fault on the stability and dilution The effect of irregular shape of stope
Oct 1, 2010
-
IC 8447 Secondary Gold In The United StatesThe Bureau of Mines analyzed the cycle of secondary gold to determine the quantity of gold not being recovered from scrap, and to identify areas for research to increase the supply of gold from scrap.
Jan 1, 1970
-
Perspectives on U.S. Energy OptionsNational Energy Technology Laboratory ?Only DOE national lab dedicated to fossil energy -Fossil fuels provide 85% of U.S. energy supply ?One lab, five locations, one management structure ?1,200 F
Jan 1, 2006
-
Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No.3 Shaft.By M Lipalile, A B. Tunono, A W. Naismith
Konkola No 3 shaft experienced severe mining induced stress and time related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow
Jan 1, 2005
-
Optimisation Improvements in Whittle using Stope Optimisation SoftwareMining One (M1) is often challenged with the task of evaluating deposits considering open cut and/or underground (UG) mining methods. In many near surface deposits a combination of both methods result
Dec 6, 2010
-
OFR-180-82 Guidelines For Environmental Monitoring In Underground Coal Mines ? Phase 1By H. A. Wright
This report assesses the economic, legal, institutional and technical factors that affect the current and future status of implementation of mine monitoring systems in the United States. It begins wit
Jan 1, 1982
-
RI 5257 Carbonizing Properties Of Harlan County, Ky., Coals ? IntroductionBy D. E. Wolfson
As a part of its overall program of coal carbonization, the Bureau of Mines is studying the coking properties of coals that may be used for metallurgical purposes. The objectives of this study were gi
Jan 1, 1956
-
Design/Build Agreement For The Niagara Tunnel ProjectBy Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
IC 8266 Review And Evaluation Of Silver-Production TechniquesBy C. H. Schack
Extractive metallurgy techniques currently employed to recover silver from primary ores and secondary scrap were reviewed and evaluated to identify and delineate metallurgical problems whose resolutio
Jan 1, 1965
-
OFR-170(2)-83 Cost-Effectiveness Of Increasing Airflow At Any Location In Underground Coal Mines (Volume II - Appendices)By Sandip K. Mukherjee
This report presents the results of the economic analysis of several applicable alternatives to increase airflow in four underground coal mines. Pressure-quantity surveys were conducted underground an
Jan 1, 1983
-
Preparation of fibrillar nanocrystalline nickel powder by precursor thermal decompositionBy WU Jian-hui
Keywords: metallic material; nickel powder; thermal decomposition; precursor; fibrillar powder; nanometer scale; passivation treatment The precursor thermal decomposition process of fibrillar nano
Jan 1, 2005
-
Shaft Excavation Using the Borehole Rising MethodThis paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of
Jan 1, 1959
-
A visit to the research on Wits-Ehac index and its relationship to inherent coal properties for Witbank Coalfied - SynopsisBy S. Uludag
Spontaneous combustion of coal has been studied by laboratory techniques using an apparatus in a small-scale laboratory testing. Coal?s inherent characteristics can be measured using Differential Ther
Jan 1, 2007
-
Rock cut slope stability analysis in Sinpal-Ildong region using distinct element methodBy J. H. Rhee, H. B. Ku, J. S. Lee, H. J. Park, B. S. Jang
A large wedge failure had occurred in the study area which was under construction. Therefore, in order to analyze the potential instability for this rock slope, the authors conducted numerical analys
Jan 1, 2003
-
IC 8393 Computer Usage For Evaluation Of Design Parameters And Cost Of Heat Exchangers - With No Change In Phase And Shell Side Pumping Costs As Prime ParametersBy P. R. Jones
A computer program was written for the design of a shell and tube heat exchanger on a price optimum basis for the following conditions: (1) Triangular pitch; (2) single or multiple pass; (3) heating o
Jan 1, 1968
-
Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell InterchangeBy Mark Maday
As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o
Jan 1, 2011
-
OFR-86-79 Control Technology For Diesel Equipment In The Underground Mining Environment -- A Review Of Selected TopicsBy Charles D. Wood
"Selected Topics,? in reviewing the control of emissions from diesel engine powered equipment used in underground mining, explores these fields of interest: hydrogen as fuel; lubricating oil as a sour
Jan 1, 1979
-
Isotopic Information on the Ardlethan Tinfield, New South WalesBy Paterson R. G, Compston W
The Mine granite at the Ardlethan tinfield is dated by Rb-Sr on a muscovite concentrate at not less than 417 ± 2.5 Ma (2s), consistent with the intrusion of this granitic body into folded Late Or
Jan 1, 1982
-
A Preliminary Investigation Into The Metallurgical Efficiency Of An Enhanced Gravity SeparatorBy F. Peer
This Technical Note was presented as a poster at the Western Cape Mineral Processing Symposium held in August 2001 The cleaning of fine coal (-1000 µm) in today?s coal preparation plants is an econ
Jan 1, 2002