  • CIM
    Experiences from an IREDES Prototype Project Production drilling with Atlas Copco Simba L6C Drill Rig at LKAB Kiruna mine

    By Mikael Ramström

    The IREDES Special Interest Group (SIG) for Drill rigs has been active since its inception at MineExpo 2000, in Las Vegas USA. The SIG for drill rigs is responsible for the development of a IREDES Dri

    May 1, 2003

  • CIM
    Benefits of Assessing LHD Vehicle Visibility in a Virtual Environment

    By T. Eger

    Load Haul Dump vehicles (LHD) are extensively used in underground mining however equipment design and operating conditions contribute to restricted operator?s visibility. The inability to clearly see

    May 1, 2003

  • CIM
    Geochemistry of Komatiites in the Abitibi Greenstone Belt and Implications for Their Mineralization Potential

    By R. A. Sproule

    Abitibi Greenstone Belt ? ~2.745 to 2.680 Ga (U-Pb zircon ages) ? Several lithologically-distinct and structurally repeated(?) assemblages ? Represents: ? Allochthonous terranes? ? Single autoch

    May 1, 2003

  • CIM
    Overview of Exploration Agreements

    By Karl J. C. Harries

    This paper looks briefly at some of the agreements and types of royalties that may be met during exploration activities, but does not go into details relating to them. Agreements can either make or b

    May 1, 2003

  • CIM
    Advanced Blasting Technology for Large Scale Destress Blasts at Brunswick Mine

    By Qian Liu

    Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick Mine. Two large regional pillars were established on the 1000 m Level to support the ground for safe extra

    May 1, 2003

  • CIM
    Thin Spray-On Liners: The Development of a New Mining System

    By Graham Swan

    The case is presented for the development of a spray-on liner for ground support, but only in the context of a new mining system, consistent with the technical and business case advantages of liners c

    May 1, 2003

  • CIM
    Fuel Cell Risk Assessment, Regulatory Compliance, and Implementation of the World?s First Fuel Cell-Powered Mining Equipment at the Campbell Mine

    By Fred C. Delabbio

    The successful implementation of a new technology in an underground production mine requires many challenges to be overcome. These challenges include mine hardening of new technology, mitigation of sa

    May 1, 2003

  • CIM
    Methane Conditions in 11 Seam

    1.Assessment of methane content in coal. Given a naturally low methane content in 11 Coal Seam and the fact that the areas of the 11 Seam adjacent to the tunnelway were degassing for a very, very lon

    May 1, 2003

  • CIM
    The Impact of Central Bank Gold Sales on the Canadian Gold Mining Industry

    Introduction Gold Mining is an Important Economic Activity in Canada n Total value added during 1990-99 was $15.5 bn n The gold price is an important factor in the value added process n The gol

    May 1, 2003

  • CIM
    Mining Mineral Processing Simultaneous Planning The Work Index Value

    By J. A. Caceres

    Mining planning and mineral processing are almost two unconnected areas. The mining area builds its economical models considering the plant like a constant parameter: a constant throughput, an average

    May 1, 2003

  • CIM
    The Evolution and Future of Overburden Dewatering at Highland Valley Copper

    By Peter A. Witt

    Highland Valley Copper is a conventional truck-shovel mining and flotation concentrator operation located some 75 kilometres southwest of Kamloops, B.C. (Figure 1). The ore is located within a porphyr

    May 1, 2003

  • CIM
    Performance Improvement at Bulyanhulu

    Kahama Mining Corporation Limited (KMCL), a wholly owned subsidiary of Barrick Gold Corporation, operates the Bulyanhulu gold mine. The operation has been in commercial production since April 2001 and

    May 1, 2003

  • CIM
    Is the Double Drum Hoist Still Viable at Depth? Recent Experiences

    By Bennett McLaughlin

    The Penna Shaft is the deepest single?lift shaft in North America. AGNICO-EAGLE started sinking the Penna shaft in 1995 with a hoisting plant capable of hoisting 1 800 tonnes per day from a 2 240-metr

    May 1, 2003

  • CIM
    Diamond Exploration Targets, Michipicoten Greenstone Belt, Wawa, Ontario

    By A. C. Wilson

    In 1991, local prospector C. ?Mickey? Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Museu

    May 1, 2003

  • CIM
    How Mining Companies Improve Share Price by Destroying Shareholder Value Or - How the Junior Geologist and Engineer Determine the CEO?s Bonus

    By Brian Hall

    For some years, the mining industry has been consistently delivering returns below the market average. One of the causes is a disconnect between what is perceived to drive value creation by many indus

    May 1, 2003

  • CIM
    Electromagnetic testing of wire ropes --- new developments

    By Lorant B. Geller

    Sixteen miners died tragically at the Paymaster gold mine at Timmins, Ontario in February, 1945, when a badly corroded hoist rope broke. The investigation of the Royal Commission that followed arrived

    May 1, 2003

  • CIM
    Comparative Evaluation of Shotcrete, Fibrecrete and Thin, Spray-On Polymer Liners for Blast Damage Mitigation

    By James F. Archibald

    A research effort has been undertaken, under WSIB sponsorship, to characterize the support capabilities of conventional and innovative spray-on lining materials for mitigating dynamic failure effects

    May 1, 2003

  • CIM
    Future Mining Opportunities for Fuelcell Applications

    By Marc C. Bétournay

    A number of successful proof-of-concept projects have been carried out to replace conventional power application, such as diesel and rechargeable batteries, in underground mine vehicles. This has led

    May 1, 2003

  • CIM
    Un système de refroidissement localisé sous-terre pour nos opérations à la mine Laronde

    By Nathalie Gauthier

    Bien que le système de ventilation du Puits Penna soit de taille imposante et que plus de $30M y seront engloutis pour son développement, aucun budget spécifique n?avait été préalablement consenti pou

    May 1, 2003

  • CIM
    How Improvements in Underground Block Caving Methods and Costs have impacted the Final Open Pit Definition

    By Sergio Fuentes

    During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs. This paper describes improvements in mine design, mine p

    May 1, 2003