Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Stability analysis and characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma

    By M. M. Zarnan

    This paper presents the results of s study involving characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma. Two coordinated efforts were undertaken: (1) collectio

    Jan 1, 1989

  • SME-ICGCM
    Development of a mechanistic model for prediction of maximum subsidence and subsidence profile due to longwall mining

    By Richard D. Begley

    This paper summarizes the development of a mechanistic model to predict longwall mining induced surface subsidence. The model was originally developed from data acquired from a recent field study cond

    Jan 1, 1989

  • SME-ICGCM
    Effect Of Water On Stability Of Mine Roadways

    The basic objectives of mine roadways are to provide sufficient cross sections in order to meet the needs of accommodation of equipment, transport, personnel travel and ventilation. However, many road

    Jan 1, 1996

  • SME-ICGCM
    Aspect Ratio and Other Parameters That Affect the Performance of Burrell Can Roof Supports

    By David F. Gearhart

    The Burrell Can1 is a thin, steel, tubular shell filled with aerated concrete that is used as a roof support in coal mines. The Can height is always shorter than the mining entry, so it is capped with

    Jan 1, 2012

  • SME-ICGCM
    Yield Pillar Application Under Strong Roof And Strong Floor Condition - A Case Study

    By P. Tsang

    The mechanisms and functions of yield pillar are analyzed by employing finite element method that takes time dependent and plastic failure of rock into consideration. The design criteria for different

    Jan 1, 1989

  • SME-ICGCM
    The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

    By Stephen Tadolini

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

    Jan 1, 2007

  • SME-ICGCM
    Massive Pillar Collapse: a Room?and?Pillar Marble Mine Case Study

    By Sandin E. Phillipson

    The Mine Safety and Health Administration?s Roof Control Division responded to a massive ground failure at an underground marble mine in northern Georgia. The ground failure occurred in a benched area

    Jan 1, 2012

  • SME-ICGCM
    Pillar Design Considering the Plastic Behavior of the Coal Seam

    By Andre Zingano

    The variation in pillar behavior at underground coal mines working in the Bonito coal seam is observed in both research and mining company case studies. There is no consistency in pillar behavior, as

    Jan 1, 2012

  • SME-ICGCM
    Microcomputer Simulation of Rock Blasting to Predict Fragmentation (e1b89d1b-bf88-4e3c-9f38-0d3739330b7a)

    By C. Dinis da Cama

    In order to reduce the complexity of mechanisms influencing rock- fragmentation by blasting a simulation approach is proposed, using the capabilities of micro-computer interactive graphics. Situat

    Jan 1, 1984

  • SME-ICGCM
    Relocating Mining?Induced Seismicity at the Trail Mountain Mine

    By Meagan S. Boltz

    From October 2000 to April 2001 a local array of fourteen seismograph stations was deployed at the Trail Mountain Mine (TMM), an underground coal mine in Emery County, Utah, to locate mining-induced s

    Jan 1, 2012

  • SME-ICGCM
    An Application Of Fem Back Analysis Method To Mine Roadway

    Knowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements

    Jan 1, 1990

  • SME-ICGCM
    The Influence of the First Layer Thickness of Immediate Roof on its Stability

    By Lixun Kang

    Bedded structure is the characteristics of coal measures strata. Bedding planes, coal streaks and soft rock bands existing in roof strata destroyed its continuity in the direction perpendicular to the

    Jan 1, 2005

  • SME-ICGCM
    The Effect Of Gas Pressure On Coal Strength

    By Najdat I. Aziz

    There are different schools of thoughts about the influence of gas pressure on coal strength. Researchers have reached contradictory results with regard to the effect of confining gas pressure on tens

    Jan 1, 1996

  • SME-ICGCM
    Mitigating Longwall Subsidence Effects on a Large Industrial Building

    By Yi Luo

    The efforts to mitigate longwall subsidence influences on various residential and farming structures by many coal mining companies have been successful in the recent years (Luo, et al, 2003). The succ

    Jan 1, 2005

  • SME-ICGCM
    Surface Fracture Development From Mine Subsidence In Eastern Kentucky

    By Clyde DeRossett

    Surface fractures, sometimes of significant size, are observed in eastern Kentucky over high extraction areas. Field observations were correlated with mine maps and a regional subsidence prediction co

    Jan 1, 1993

  • SME-ICGCM
    The Load Transfer Properties of Post?Groutable Cable Bolts Used in the Australian Coal Industry

    By Rob Thomas

    Adequate load transfer is considered essential for optimum ground support and is increasingly important in weak roof and/or high stress environments. If adequate load transfer is achieved not only can

    Jan 1, 2012

  • SME-ICGCM
    Time Dependent Roof Deterioration At A Central Ohio Coal Mine (b0f3bbeb-91e8-4a62-8116-5f9e444a047e)

    By Ted Klemetti

    Roof deterioration in weak moisture-sensitive rock leads to roof falls in coal mines. An observation site was set up in intake air at an underground coal mine in central Ohio to evaluate the time-dep

    Jan 1, 2009

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME-ICGCM
    Planning And Design For Barrier Pillar Recovery Three Case Histories

    By David A. Newman

    Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu

    Jan 1, 1995

  • SME-ICGCM
    The Roof Behavior of a Longwall Tailgate Under Massive Sandstone Strata

    By Yemi Akinkugbe

    Underground coal mining under massive sandstone can present significant challenges if the roof behavior is not well understood. This paper presents a classic cantilever bending/flexing behavior of a l

    Jan 1, 2007