Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Draw Point Construction Improvement at Deep Mill Level Zone (DMLZ) Pt Freeport Indonesia using Six Sigma Method

    By R. Mulyanto, M. Siray, A. Parhusip, F. Hartono

    "PT Freeport Indonesia is preparing the Deep Mill Level Zone (DMLZ) mine to be the successor of the currently operating Deep Ore Zone (DOZ) mine. The DMLZ is block cave mine situated 500 m below the D

    Jan 1, 2016

  • SME
    Overcoming Challenges in Tunneling for Albany’s Beaver Creek Clean River Project, Albany, New York - NAT2022

    By Jerry Wang, Greg Bold, Mahmood Khwaja, Rebecca Caldon, William Simcoe

    Phase III and Phase IV of the Beaver Creek Clean River Project, Albany, NY, includes microtunnel construction of 2,320 feet of 48-inch/36-inch internal diameter (ID) conveyance pipe and a 525 foot lon

    Dec 1, 2022

  • SME
    A Review of In Situ Horizontal Stress Characteristics in Coal Measures Strata and the Fundamental Role of Poisson’s Ratio

    By Guy Reed, Russell Frith

    In situ or pre-mining horizontal stresses are arguably the least well understood of the principal inputs into underground coal mining geotechnical engineering design, whether analytical, empirical, or

    Jun 25, 2024

  • SME
    Structural Retrofitting of Older German Road Tunnels—Possibilities to Fulfill Current Requirements Regarding Structural Fire Protection

    By Ingo Kaundinya

    "INTRODUCTION Tunnels are important elements of the German federal road network which have to cope with an increasing traffic load especially of heavy goods vehicles. In order to ensure a high availab

    Jan 1, 2016

  • SME
    Exposure To Chemical Products In Coal Mining

    By L. F. Zeiler

    In the past, health concerns in coal mines have primarily centered on those elements which have been essentially inherent to the mining environment. These would include respirable coal mine dust, resp

    Jan 1, 1995

  • SME
    Hard Rock TBMs—The Experience of Brenner Basis Tunnel, Construction Lot Mules 2-3, for the Evaluation of Risk Prediction Tools - RETC2023

    By A. Mei, F. Amadini, F. Cernera, D. Baliani, A. Flor, M. La Morgia, F. Sassi

    The risk of TBM jamming because of squeezing rock mass or excessive caving (instability of the cavity) conditions is always a focal point while boring long and deep tunnels with shielded TBMs. Mechani

    Jun 13, 2023

  • SME
    A Study on Apatite Recovering from the Tailing of the Bac Nhac Son‑Vietnam Beneficiation Plant by Combined Flotation in Mechanical and Column Devices - Mining, Metallurgy & Exploration (2023)

    By Son Hoang Nguyen, Thanh‑Hai Pham, Duoc Van Tran, Dung Thi Kim Nhu

    Apatite ore plays a critical and irreplaceable role in fertilizer production and is being upgraded in quality in northern Vietnam. The old tailing of the Bac Nhac Son beneficiation plant (Vietnam) has

    May 24, 2023

  • SME
    Computerized Truck Dispatching At The Chino Mine - Installation And Operation Considerations - Introduction

    By B. A. Barnum

    The Chino mine is an open pit copper mine located in southwestern New Mexico, at an elevation of 1890 m (6200 feet) above sea level, approximately 117 km (70 miles) north of the Mexican border. It is

    Jan 1, 1987

  • SME
    Effects of Cover Depth on Ground Movements Induced by Shallow Tunnelling

    By Johan Bosch, Wout Broere, Minh Ngan Vu

    "INTRODUCTION Shield tunnelling is often used in constructing underground infrastructure in cities due to the ability to limit settlements and damage to existing buildings. However, in an urban enviro

    Jan 1, 2016

  • SME
    "Copper Heap Leach - From Permits To Cathodes"

    By Jackson G. Jenkins

    Magma Copper Company's San Manuel SX-EW facility has operated since May, 1986. The original facility had a design capacity of 25,000 tons per year of electrowon copper cathode produced by process

    Jan 1, 1993

  • SME
    Dust Control Parameters Necessary To Control Dust On Longwall And Continuous-Mining Operations

    By R. S. Ondrey

    MSHA has prepared two pamphlets that provide guidelines for selecting dust control parameters for underground coal mining sections. These guidelines are based on research conducted by the Bureau of Mi

    Jan 1, 1995

  • SME
    The Case For Periodic "Outsider" Operational Reviews

    By M. D. Martin

    Low metal prices and increasingly stringent environmental regulations, coupled with the threat of higher governmental royalties are adversely affecting both existing and new operations. Existing opera

    Jan 1, 1994

  • SME
    Cost-Per-Ton Improvement Ideas For Underground Equipment

    By J. Wiebmer

    The two most important influencers of cost-per-ton in an underground mining machine are its productivity (tons/hour) and its availability-utilization (hours/year). Operating cost and initial price hav

    Jan 1, 1997

  • SME
    Clean Water Act Compliance Issues Related To Mining

    By Florence Munter

    This paper provides a discussion of the various federal and state laws governing water quality as related to mining operations. The specific laws addressed are the Clean Water Act, and the Arizona Min

    Jan 1, 1996

  • SME
    The Use Of New Microtunneling Technology To Excavate Hard Rock In A Mining Application

    By D. G. Abbott

    This paper will describe the development, testing, performance evaluation, and in particular, the utilization for a mining application of revolutionary new mini-disc cutters for use in micro-tunneling

    Jan 1, 1996

  • SME
    Common Ventilation Problems In The Appalachian Coal Region -A Case Study (PREPRINT NUMBER 92-181)

    By A. M. Wala

    It is common practice in Appalachia, when extending the life of an existing mine, to acquire the adjacent reserves and extend the existing mine into it. Also, often the existing mine is renovated to a

    Jan 1, 1992

  • SME
    Denmark's Great Belt Fixed Link Bored Tunnel Project

    By Martin N. Kelley

    The Great Belt Link is a $3.5 billion fixed link across an 18 km (12 mile) wide body of water that separates the island of Zealand, on which Copenhagen is situated, and the main land mass of Denmark,

    Jan 1, 1991

  • SME
    Noranda's Exploration Strategy (f4182cc3-beca-4d56-8bde-6070cd1c6670)

    By D. L. Stevens

    Following an in-depth scenario and strategic planning exercise in 1997, Noranda's mine production goal was set at 500,000 tonnes per year of both copper and zinc metal within five years. There ha

    Jan 1, 1999

  • SME
    A Novel Holistic Approach to Rehabilitation of Underground Structures - RETC2023

    By L. Boyd, T. Martin, V. Gall

    Water infiltration into subgrade infrastructure can cause major impacts on their performance. In addition to damaging the structure, water intrusion leads to deterioration of installations including e

    Jun 13, 2023

  • SME
    Development Of A Comprehensive Air Quality Compliance Program

    By W. Stark

    Many developing countries with little or no previous environmental regulation are now promulgating air quality regulations which require facilities to demonstrate compliance with both process paramete

    Jan 1, 1998