    Analysis And Performance Of Sheet Pile Cofferdam Under Demolition Blast Loads

    By Michael Oakland

    This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn

  • DFI
    Analysis and Performance of Sheet Pile Cofferdam under Demolition Blast Loads

    By John Mould, Gordon Chen, Michael Oakland, William McElwee

    "This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn

    Jan 1, 2017

  • DFI
    New Findings on the Capacity of Connections between Micropiles and Existing Footings

    By João Veludo, Eduardo Júlio, Helen D. Robinson, Jesús E. Gómez

    "Utilization of micropiles for structural retrofit requires connection of the micropiles to the footings of the existing structure. Almost ten years ago, an experimental research effort was carried ou

    Jan 1, 2015

  • DFI
    Rocky Mountain Arsenal Section 36 Lime Basin Soil Remediation Project – Seepage Barrier

    By A. David Miller, Douglas M. Barber

    "The Rocky Mountain Arsenal was used by the military to produce chemical warfare agents and incendiary munitions for use during World War II and later by private companies for the production of indust

    Jan 1, 2015

  • DFI
    Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)

    By Jeffrey M. Taylor, Arturo Ressi di Cervia

    "Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con

    Jan 1, 2004

  • DFI
    Cost Effective Excavation Support in Seattle

    By Richard D. Luark, Fernanda S. Madrona

    Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure

    Jan 1, 2019

  • DFI
    Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way Limits

    By Thomas D. Humbert, Christopher J. Ramsey

    Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi

    Jan 1, 2019

  • DFI
    Settlement Evaluation of Large Water Storage Tanks Under Challenging Conditions

    By Ben M. Lewis, Yogesh Prashar

    "The East Bay Municipal Utility District (EBMUD) is a major water utility service providing water to over 1.3 million people in the eastern San Francisco Bay Area. EBMUD manages 28 dams at 5 terminal

    Jan 1, 2016

  • DFI
    A Case Study Describing The Use Of A Top Down Construction Sequence For A Three Level Basement Using A Diaphragm Wall And Cfa Foundation Piles

    By Chris Leach, Lucie Spencer

    This case study describes the geotechnical aspects of the basement construction for a multi-storey, residential and hotel complex located in the newly developed Elizabeth Quay precinct in Perth, Weste

    Nov 1, 2022

  • DFI
    Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity Profiling

    By Garland Likins, Gray Mullins, George Piscsalko

    "Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or

    Jan 1, 2016

  • DFI
    Monitoring of an Embankment Project Using Rigid Inclusions and Vacuum Consolidation During and After Construction

    By Stephen Buttling, Zhong Rui

    "A single unit gas fired power station was being built on the edge of the Gulf of Thailand in 2001. The soil conditions consisted of very soft to soft Holocene Marine Clay, and the site was part of a

    Jan 1, 1900

  • DFI
    Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit Limestone

    By Jim Glider, Noah Miner

    The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio

    Sep 8, 2021

  • DFI
    Foundation Reuse And Strengthening Works At 65 And 67-69 Whitfield Street, London

    By Shields H. Arup

    The paper describes the innovative foundation reuse and strengthening works for two buildings in Central London. A 1950s building on piled foundations (65 Whitfield St) and a 1930s building (67-69 Whi

    May 1, 2022

  • DFI
    Ground Improvement Using Stone Columns To Mitigate Liquefaction Potential Of Fine Sand By Wet Top Feed Vibro Replacement Method – A Case Study

    By Parameswaran V. S, Anshuman Singh

    This is a case study on ground improvement using Stone columns at Kokrajhar in Assam which comes under seismic Zone V as per IS: 1893. The strata at site comprised of mostly fine sands with low SPTN v

    Nov 1, 2022

  • DFI
    Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult Geology

    By A. Rod Kern, Michael A. McNicholas, Yaser Taheri

    Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing

    Jan 1, 2019

  • DFI
    Micropiles for Seismic Retrofits

    By Rob Jameson

    "Although seismic retrofit is recognized as a key micropile application, widely-used reference documents do not clearly address design and testing recommendations for micropiles that are loaded primar

    Jan 1, 2009

  • DFI
    Using Rigid Inclusions, Helical Piles And Micropiles To Revitalize 1600 Smallman Street.

    By Melinda J. Hummel, Zachary T. Smith, Nathaniel Witter, Nina F. Carney

    The revitalization of Pittsburgh’s historic Strip District has led to the redevelopment of existing properties and the development of new properties. At one time, the Strip was home to wholesale marke

  • DFI
    Evaluating Lateral Bracing Code Requirements for Large Diameter Foundations

    By Jon Huff, Jeffrey Donville, Hannah Iezzoni, Dan Stevenson

    Occasionally, in the design of deep foundations for a structure, a single deep foundation element may be used to support a building column. The most common type of element used in such cases is a dril

    Sep 8, 2021

  • DFI
    Behaviour Of Piled Raft- Importance Of Observational Study

    By Abhirami B., V. Balakumar

    Piled raft foundation system is an intelligent geotechnical concept, developed towards reducing the settlement of the raft and the footings by providing pile elements below the raft or footings, as th

    Nov 1, 2022

  • DFI
    Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement Project

    By Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang

    During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati

    Jan 1, 2019