Evolution Of Piling Design And Techniques In Mudstone At Manchester AirportBy Colin Curtis
In recent years, Manchester Airport has undergone expansion including the construction of a second runway, a new terminal building (Terminal 3) and extensions to the existing Terminal 1. Manchester is
Jan 1, 2001
-
The Effect Of Vertical Pile Loading On Subsequent Lateral BehaviourBy A. Lyndon
Vertical and lateral load tests were carried out on two 13 m deep bored cast-in-place instrumented piles, socketed into weathered sandstone. The first pile, 1200 mm in diameter, was loaded vertically
Jan 1, 1989
-
Special Foundation Systems - Paper 2.1 - The Merits Of Polymeric Fluids As Support SlurriesBy K. Englehardt
J BERESFORD introduced the subject of the paper which is the use of polymeric slurries to support the sides of diaphragm wall and bored pile excavations during construction. In the opinion of the auth
Jan 1, 1991
-
Easy Static Load Tests: Expert ResultsBy M. England
Test equipment has been developed to record automatically both the displacement of the pile head and the load applied during a conventional maintained load pile test. Some systems also have, in additi
Jan 1, 2002
-
Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and CasinoBy Michael Arnold, Jonathan Delgado
In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca
Jan 1, 2018
-
Interstate 70 Construction Through Glenwood Canyon, Colorado - Glenwood Canyon ConstructionBy Ray Schmahl
The Glenwood Canyon is a 13 mile long river gorge formed by the Colorado River approximately 2 miles East of Glenwood Springs, Colorado and approximately 150 miles West of Denver Colorado, (See Drawin
Jan 1, 1990
-
Little Britain Project: Construction Of BasementBy R. H. Wright
This paper describes the design philosophy and methods employed in constructing the foundation elements for the Little Britain Project in the City of London. The Contract is a design and construct pac
Jan 1, 1989
-
Repair Of Deep Foundations - SummaryBy Dennis W. Boehm
The building boom of the late 1970's and early 1980's has all but used up most of the better sites across the more populated metropolitan areas of the United States. This means that current
Jan 1, 1999
-
Foundations For The Sohio Corporate Headquarters - A Presentation At The Deep Foundations Institute Annual Meeting Cleveland, Ohio, November 1983By Clyde N. Baker
Foundations for the Sohio Corporate Headquarters in downtown Cleveland have column loads of 11,400 kips, which increase to 15,000 kips with wind loading. An extensive exploratory program was conducted
Jan 1, 1984
-
Full-Scale Field-Test Studies On Driveability And Induced Ground Vibrations Of Vibratory Driven Sheet PilesBy K. Viking
The vibratory characteristics of full-scale sheet piles, vibratory driven into the ground, have so far not been described systematically in detail. This paper concerns the preliminary results of a ser
Jan 1, 2000
-
Project Specifc Design Criteria I-880 Reconstruction Project, Oakland, CaliforniaBy Steve Thoman
After the 1989 Loma Prieta Earthquake, the California Department of Transportation (Caltrans) initiated an overview of the Caltrans Bridge Design Specifications (BDS) and bridge seismic design practic
Jan 1, 1996
-
High Capacity And Fully Removable Soil AnchorsBy Anthony D. Barley
Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit
Jan 1, 2002
-
Pile Design, Testing, And Installation For A Gated Dam ? SynopsisBy B. H. Moore
The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori
Jan 1, 2010
-
Recent Developments In Secant Bored Pile Wall ConstructionBy D. E. Sherwood
Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in
Jan 1, 1989
-
Design Of The Drilled Shaft Foundations For The Cooper River BridgeBy Liang Shen
The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South
Jan 1, 2013
-
Float-In CofferdamsBy Robert B. Bittner
Large diameter piles (2 to 3 m diameter, both driven and drilled) are being used more frequently by designers of bridge foundations. The use of these large piles allows the pile cap to be positioned
Jan 1, 2013
-
Design and Installation of Helical Piles for Support of Bridge Pier FoundationBy David L. Borusiewicz, M. Suri Surendra
"Abstract Helical piles have been used as anchors and for supporting lightly loaded structures as a method of underpinning, etc in the past. Recently, helical piles are being used to support new struc
Jan 1, 2014
-
Analysis of the Uncertainty by the Random Finite Elements Method of a Vertical Load Test of a Piled Raft Founded in Tropical SoilBy Cristhian C. Mendoza, Renato da Cunha, Bernardo Caicedo, Max Barbosa
"Abstract This paper shows that a raft alone is not sufficiently appropriate to address the uncertainty of underlying soil variability; therefore, a piled raft system is a better option for mitigating
Jan 1, 2014
-
Driven PilesBy S. Merjan
Three papers were presented for discussion at the conference: 1) Instrumented driven steel tube piles at Canary Wharf; author: A. R. Gaba, United Kingdom. The author described the Canary Wharf
Jan 1, 1991
-
Experiences Of The Cast-In-Situ Pile Filling In Stone-Line IntercalationBy Guan Jichang
An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t
Jan 1, 1991