Seal Slab Prestressed Pile Interface Bond From Full-Scale TestingBy Gray Mullins
This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p
Jan 1, 2013
-
Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building ? SynopsisBy Martin J. Kenwright
Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi
Jan 1, 2000
-
CPT - Guided Installation Of Pressure-Grouted Displacement PilesBy Mark M. Petersen
As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven
Jan 1, 2002
-
Ultimate Uplift Capacity Of Piles And Pile Groups In Granular SoilBy B. M. Das
Laboratory model test results for the ultimate uplift capacity of rough rigid single and group piles embedded in sand have been presented. Model tests on single piles were conducted in loose, medium,
Jan 1, 1989
-
Charles Grimes Bridge Foundations, Melbourne, Australia - SynopsisBy Charles Pol Vuillier
Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl
Jan 1, 2000
-
Plastoelastic Analysis Of Bearing Capacity For Soil AnchorBy Hui Yongning
This paper presents a simulating test of constitutive relation of soil anchor in laboratory and puts forward a new plastoelastic mechanical model, on which a new calculating formula of elastic and pla
Jan 1, 1991
-
Once Again, Engineering And Contractor Tenacity Overcome Tough GeologyBy John E. Lens
How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran
Jan 1, 2006
-
Case History Of The Support Of Excavation System Used At The Atlantic Building Project In Washington, DCBy Joseph C. Gillen
This paper discusses the design, construction, and performance of the support of excavation system used at The Atlantic Building jobsite. The support of excavation system had to be adaptable to the d
Jan 1, 2006
-
Resolution Of Prestressed Concrete Pile Splice Problems - SummaryBy David Siu
Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea
Jan 1, 1991
-
Foundations In The Urban Environment The Need For Unique Installation Methods - IntroductionBy James J. Cahill
Contractor's working in an urban environment face a multitude of working conditions. There is no typical "Downtown" job site. From afar we just see the skyline, or up close a specific building. T
Jan 1, 1991
-
Dynamic Testing Results Indicator Pile Test Program --I-880 - IntroductionBy D. Michael Holloway
The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-
Jan 1, 1995
-
Numerical Analysis Of Load Bearing Capacity Of Drilled Shafts With DefectsBy Khamis Y. Haramy
Quality assurance and quality control of drilled shafts has become a concern due to difficulties in accurately locating construction anomalies and determining load bearing capacity of defected drilled
Jan 1, 2007
-
Research Advances In Barrettes: Installation Effects And Load-Carrying BehaviourBy Guo H. Lei
Over the last four decades, barrettes have been ever-increasingly adopted as the foundations for tall buildings and heavy infrastructure projects all over the world. Many findings have been gained fro
Jan 1, 2006
-
Interlocking H-Sections For Cofferdams Resist High PressureBy Marc Dondelinger
Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca
Jan 1, 1985
-
Sand Compaction Piles ? SynopsisBy A. Holeyman
The displacement compaction piles described in the paper are installed using a heavy casing or tube and an internal drop hammer. The casing which initially is closed at the bottom by a sand plug displ
Jan 1, 2010
-
Deep Foundations In Washington, DCBy Douglas W. Christie
Deep foundations in Washington, DC have played a role in the city?s development since the 19th century. Designers of government and commercial buildings sought deep foundations initially to minimize
Jan 1, 2006
-
Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:By Wolfgang G. Brunner
The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine
Jan 1, 2000
-
Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver FormationBy Ken Andromalos
Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili
Jan 1, 2007
-
Deep Foundations In Hong Kong - SynopsisBy Martin Pratt
This paper is an overview of deep foundation engineering in Hong Kong past, present and future. The enormity of the subject compared with the space available makes brevity inevitable. Issues of constr
Jan 1, 2000
-
Video Inspection Of Rock Sockets For A Piling ProjectBy Ali Ameli
Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th
Jan 1, 2006