Block 43: Diverse Technologies in Complex Site ConditionsBy John Kvinsland
"The Block 43 Project is the future home of the Paul Allen Institute for Brain Science located just off the southern shore of Lake Union in Seattle, Wash. The South Lake Union (SLU) district experienc
Jan 1, 2014
-
Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific OceanBy Ihab Allam PE, Meeok Kim. PE. Ph. D
The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa
-
Emergency Jacking Tunnel in Compressible SoilBy Tai Luu, Michael McNicholas, James C. McIntyre
The Jersey City Municipal Utilities Authority (JCMUA), discovered that an existing sewer pipe had collapsed under the New Jersey Transit Conrail Railroad between Pine Street and Ash Street in Jersey C
Jan 1, 2019
-
Hudson’s Revitalization: The Use of Robotics in the Work PlaceBy Dave P. DeClerck
Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new
Jan 1, 2019
-
Bertha Rescue Shaft – SR99 TunnelBy Lance Rasband, Richard Hanke
"Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the
Jan 1, 2015
-
Installation and Efficiency of Common Helical Pile CouplingsBy Jason Herron, Joseph Brown
The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,
Jan 1, 2019
-
Session 16 "Deep Mixing Method IV"By Mary Ellen Bruce
Let me first address the issue of the wet grab samples. The wet grab samples that were attempted to take on the Central Artery were hindered by the fact that the way the mixing was being done was only
Feb 10, 2003
-
Laboratory Modeling of Internal Erosion in Dam FoundationsBy Kenneth E. Henn, David B. Paul, John D. Rice, Brian H. Greene
"Several laboratory modeling programs have been conducted to investigate the mechanisms associated with internal erosion of dam embankments and foundations. The investigation consists of developing l
Jan 1, 2016
-
Diving Underground - Through a Hologram - To Better Understand Foundation RiskBy Scott A. Anderson, Benjamin S. Rivers, Derrick D. Dasenbrock, Silas Nichols
Unknown geotechnical conditions are a major source of risk. Unexplored places vastly outnumber the sampled and tested ones, and widely spaced boreholes with intermittent tests and samples are the norm
Jan 1, 2019
-
Deep Foundation Advancements in FargoBy Ezra Ballinger, Matthew R. Glisson
Located in downtown Fargo, North Dakota, the Block 9 Redevelopment project site contains highly- compressible soils in the upper 100 feet with groundwater about 10 to 15 feet below the existing ground
Jan 1, 2019
-
Real-Time Monitoring During Shaft Contruction For The Sound Transit Ulink I-5 UndercrossingBy Pierre Gouvin
This paper describes the design, installation and monitoring of a state of the art real time geotechnical/structural instrumentation monitoring system to facilitate tunnel construction under Interstat
Jan 1, 2010
-
Design Of Well Cap, Pier And Well Steiming At The Junction Using Strut-And-Tie Model - SynopsisPier, well cap and steining junction is a complicated 3-d re-ion. The prevalent design procedure for the pier, well cap and steining in isolated manner is not rational. In absence of an integrated app
Jan 1, 1996
-
The Development and State of Practice of Cutter Soil Mixing in North America – The First 10 YearsBy Brian Wilson, Franz-Werner Gerressen
"Cutter Soil Mixing, also known as CSM, was developed in Europe as an alternate method of Deep Mixing to the more traditional single and multiple auger techniques, and brought to market by Bauer Masch
Jan 1, 2015
-
A Numerical Model For Load Transfer And Settlement Of Bored Cast In-Situ PilesBy Joshua R. Omer
A numerical model is developed for predicting the load transfer and settlement behaviour of vertically loaded, bored cast in-situ piles. Based on analysis of full-scale pile tests, closed-form equatio
Jan 1, 2010
-
Development Of Vertical-Horizontal Yield Envelopes Of Pile Group Supported Bridges Subjected To ScourBy Aditi Sharma, Sumanta Haldar
Scouring of soil is the major concern forthe various hydraulic structures built in the flowing rivers since scouring impacts the bearing capacity of foundations. Hence, consideration of scouring in th
Sep 1, 2022
-
Centrifuge Modeling Of Axial Failure Of Helical Piles In Cohesive SoilsBy Richard Schmidt, Lijun Deng, Mohamed Abdelaziz, Weidong Li
Helical piles are widely used as a foundation supporting a variety of different structures. Understanding the axial behaviour of helical piles is required to confirm the engineering design. Helical pi
-
Pile-Supported Raft Foundation SystemBy Emre Biringen
Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howeve
-
A Case History On Design, Construction, And Performance Of Stone Column Ground Improvement Beneath An Mse EmbankmentBy Karen Dawson
This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge ab
-
Long, High-Capacity Ground Anchors for Soldier Pile WallsBy Bryan Bet
Retaining wall systems of soldier pile ground anchors (SPGAs) have been used for many decades to stabilize landslide activity. Due to successful use of these walls to address slope instability on the
Jul 1, 2022
-
Is Excess Pore Water Pressure Build Up An Engineering Demand Parameter For Excavation Analyses?By A. Felipe Uribe-Henao, Camilo Ballesteros, Luis G. Arboleda-Monsalve, David G. Zapata-Medina
Conventional excavation analysis based on total or effective stress methods can result in inaccurate estimation of ground movements when impervious soil conditions or rapid excavation sequences are no