Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Corrosion of Aluminum Components in the Glass Curtain-Wall of a Building

    By F. N. Smith

    Corrosion was observed on the aluminum pressure plates and dress-caps that hold the glazing in place on a curtain-walled building, The multi-storey building in question is situated in the downtown are

    Jan 1, 2005

  • CIM
    Connecting the Personnel Tracking System with the Alarm-Broadcasting System

    By A. Kowalski

    This paper presents methods of implementation and the added value that can be achieved by connecting personnel tracking systems and alarm-broadcasting systems. The authors point out the functions of t

    Aug 1, 2013

  • CIM
    Carbon Scout – Automating Carbon Measurement and Control in CIP/CIL Circuits

    By W. Lodge, G. Rasmussen

    "The carbon-in-pulp (CIP) process has been the dominant gold recovery technology since the 1980s. During all this time carbon measurement, and control of the carbon transfer pumps has been largely man

    Jan 1, 2018

  • CIM
    Twinning Behavior of Am30 Mg Alloy During Uniaxial Tension and Compression

    By L. Jiang

    The evolution of twinning in an AM30 Mg alloy was examined by uniaxial tension and compression testing at temperatures from ambient to 250°C and a strain rate of 0.1/s. The samples were cut along the

    Jan 1, 2006

  • CIM
    An Investigation into the Regrinding Circuit Efficiency at Miduk Copper Complex

    By A. Poor Zaeif Doost

    With columns being installed in rougher section at Miduk Copper Complex, the rougher feed mainly reports to rougher-scavenger cells. To evaluate the efficiency of regrinding circuit, we conducted flot

    Jan 1, 2012

  • CIM
    Effects of the Rolls? Speed and Pressure on the HPGR Performance During Gold Ore Grinding

    By H. Dundar

    An extensive testwork was performed around the HPGR plant at GoldFields Ghana Limited Tarkwa Gold Mine. The HPGR was used to prepare the feed for heap leaching. The circuit was configured in such a wa

    Jan 1, 2012

  • CIM
    Research, Progress and Government Presidential Address

    By Donald F. MacDonald

    WE are living in a mineral and technological civilization. The Encyclopedia Britannica defines civilization as follows: "It is the final test of a progressive civilization that a given effort shall pr

    Jan 1, 1939

  • CIM
    Investigation of the Influence of Stress Shadows on Multiple Hydraulic Fractures from Adjacent Horizontal Wells Using the Distinct Element Method

    By Neda Zangeneh

    Production efficiency from low permeability gas shales require techniques to optimize hydraulic fracture completions. One completion strategy involves the simultaneous or near simultaneous hydraulic f

    Jun 1, 2012

  • CIM
    Instrumentation of Hydrabolts for stress change monitoring in burst-prone grounds

    By Fidelis T. Suorineni

    HydraboltTM is a Swellex-type dowel support element developed and manufactured by New Concept Mining in South Africa. Like Swellex, the HydraboltTM is a folded tube which can be inserted into a larger

    Oct 1, 2010

  • CIM
    The Preservative Treatment of Mine Timbers

    By J. F. Harkom

    Introduction The importance of the preservative treatment of mine timbers need scarcely be stressed here. Increasing the life of mine timbers will reduce one of the major costs of mining and also c

    Jan 1, 1930

  • CIM
    Mines and Mining in Spain

    By E. S. Moore

    To properly understand industrial conditions in Spain it is necessary to consider the early history of the country. Spain is very backward in many lines. They use the sickle for cutting grain, and plo

    Jan 1, 1927

  • CIM
    Investigation on the Effectiveness of Air Bubbles Collision in Vibratory Column Flotation Machine

    By Kremena Dedelyanova

    The paper presents research of mechanism for the creation of air bubbles in vibratory a column flotation machine. Factors are discussed that influence the increase in the duration of the bubble in the

    Aug 1, 2013

  • CIM
    A New Method of Grouting Bolts for Roof Support

    By B. P. Verma, K. N. Sinha, N. M. Raju, B. Singh

    The paper describes a new method of grouting bolts developed at the Central Mining Research Station at Dhanbad in India. This method makes use of wire-mesh sleeve instead of the expensive metal tube t

    Jan 1, 1972

  • CIM
    Forces and the Young Relationship in the Bubble-Spherical Particle-Liquid System

    By Jan Drzymala, Przemyslaw B. Kowalczuk

    "Flotation is possible when the forces operating between a bubble and the attached particle are properly balanced. There are many forces operating in the bubble-particle aggregate. The magnitude, loca

    Jan 1, 2016

  • CIM
    Identification of the Different Boiling Regimes During the Quenching of a Cylindrical Probe

    By L. I. Kiss, A. Larouche, V. Dassylva-Raymond

    Control of the quenching capacity of the cooling water is of primary importance for maintaining the quality and recovery rate of ingots produced by direct chill casting. Industrially, this can be done

    Jan 1, 2006

  • CIM
    Fill Back Stability in Open Stope Mining with Consolidated Backfill

    By Jerry Ran

    When multiple levels are mined in open stope mining with delayed backfill, mining underneath fill is inevitable to achieve higher rate of recovery if no sill pillars are left for the purpose of fill s

    May 1, 2003

  • CIM
    The Unitrain Loadout System

    By D. L. Babbitt, Sniezek

    "This paper deals with the varions methods for the rapid Joading of unit trains which are being: used by ore procossors to move their product to dock-s1de storage facilities or their ultimate customer

    Jan 1, 1969

  • CIM
    Presentation of a Web-Based Database Design for Documentation and Analysis of Rock Properties

    By K. Thuro, H. Käsling, F. Menschik

    "With increasing data volume, due to enhancing requirements for ground investigation programs for large construction projects, the demand for more efficient filing systems is more and more growing. De

    Jan 1, 2015

  • CIM
    Arsine Risk Management at CCR’s Electrolyte Purification Plant

    By A. Majumdar, B. Servière, H. Persson

    The CCR refinery, which was built in 1931, treats both internal and third party copper anodes to produce 325,000 mt of copper as cathodes. These anodes contain high levels of impurities, such as Ni, A

    Jan 1, 2019

  • CIM
    Beattie Mine

    By Stanley Davidson

    "This description of the structural geology of the Beattie mine has been condensed from a more comprehensive paper published previously (4).The property is in western Quebec, a short distance east of

    Jan 1, 1954