Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Assessing Vertimill Ultrafine Grinding Performance: The Gibraltar Mine Case

    By Keith Merriam, Jim McDonnell, Peter Radziszewski, Rob Rotzinger, Ian DeHart

    "Taseko Mines Limited Gibraltar copper-molybdenum mine recommenced operation in 2004 with the initiation of a series of development projects to increase throughput capacity as well as modernize the mi

    Jan 1, 2015

  • CIM
    Geostatistical Simulation of Optimum Mining Elevations for Nickel Laterite Deposits

    By J. A. McLennan

    Nickel laterite deposits are typically formed from tropically weathered mafic-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular dozer

    Apr 1, 2005

  • CIM
    Real-time Assisted Driving System in Open Pit Mining Operations using Google Earth

    By E. J. Sun

    The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net

    Oct 1, 2009

  • CIM
    The NICO and Sue-Dianne Proterozoic, Iron Oxide-hosted, Polymetallic Deposits, Northwest Territories: Application of the Olympic Dam Model in Exploration

    By Kathryn L. Neale, Derek L. Mulligan, Robin E. Goad, Norman A. Duke, A. Hamid Mumin, W. John Camier

    "Abstract - The NICO and Sue-Dianne deposits are being explored and delineated by Fortune Minerals Limited in the Mazenod Lake District of the Northwest Territories, using an Olympic Dam model. The de

    Jan 1, 2000

  • CIM
    Computer Control of Flotation at Ecstall

    By M. P. Amsden

    "Ecstall Mining Limited, a subsidiary of Texas Gulf Incorporated operates the Kidd Creek Mine, a 10,000 tons per day base metal producer, near Timmins, Ontario. Two different ore types are mined and m

    Jan 1, 1973

  • CIM
    150th Anniversary Victoria Bridge, 1859 - mid-December, first train; 1860 August, celebration

    By H. J. McQueen

    ORDER OF PRESENTATION ?INTRODUCTION TO THE VICTORIA BRIDGE ?REASONS FOR A BRIDGE AT MONTREAL ?RAILROAD BRIDGE REQUIREMENTS ?IRON PRODUCTION CANADA / WORLD AL ?METALLURGICAL INDUSTRY CANADA ?FA

    May 1, 2011

  • CIM
    Numerical Analysis of the Early Response of Paste Backfill in a Vertical Stope

    By N. E. Mkadmi

    Backfilling increases the stability of underground stopes and may help reduce the environmental footprint from the mining operation. The barricades holding the backfill in place must be designed to pr

    May 1, 2011

  • CIM
    Self-optimizing Grinding Control for Maximising Throughput while Maintaining Cyclone Overflow Specifications

    By Eduardo Nunez, Asim Tuzun, Dan Graffi, Glenn MacPherson

    "In preparation for the milling of a new nickel and copper mine ore, Nickel Rim South, Xstrata’s Strathcona Mill is undertaking numerous process improvement projects. Within the grinding circuit, seve

    Jan 1, 2009

  • CIM
    Processing Plant Expansion at Kittila Mine Affords Opportunity for Significant Material Handling Improvement

    By T. Holmes, J. Middlemiss

    "Agnico-Eagle (AE) has been operating their Kittila Mine in Northern Finland since 2008. The mine has experienced considerable ore flow problems with ratholing, bridging and freezing in their mill fee

    Jan 1, 2017

  • CIM
    Doing More with What We Already Know – Improving the Efficiency of Minerals Processing

    By Joe Pease

    "The demand for minerals and metals is increasing. Head grades of ore bodies are dropping. Remaining ores are becoming finer grained, more complex, and more logistically challenging. Mineral processin

    Jan 1, 2015

  • CIM
    Predicting the Energy Requirements of High Pressure Grinding Rolls Using Piston Press Test Procedures

    By Zorigtkhuu Davaanyam, Bern Klein, Stefan Nadolski, Amit Kumar

    "The High Pressure Grinding Rolls (HPGR) is a relatively new comminution technology that has been shown to be more energy efficient compared to semi-autogeneous (SAG) mills. Full and fair consideratio

    Jan 1, 2015

  • CIM
    The Gold Gravity Recovery Effort - A New Concept in the Design and Optimization of Recovery Circuits

    By Z. Xiao, A. R. Laplante

    "The recovery of gold by gravity from grinding circuits differs from virtually all other gravity recovery approaches in that stage (or unit) recoveries are low, typically 1 to 5%, but overall recoveri

    Jan 1, 2001

  • CIM
    Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)

    By N. Coli

    The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant

    May 1, 2009

  • CIM
    Kansanshi Copper Smelter: The First Four Years of Operation

    By S. Hunt, D. de Vries

    Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe

    Jan 1, 2019

  • CIM
    Advanced Process Control for Grinding Circuits

    By E. Gallestey, D. Groenveld, F. Kolb, M. Rozou

    "Recent copper price evolution pushes modern mining industry even harder to achieve highest production with maximum efficiency. Operations are bound by numerous contractual and environmental condition

    Jan 1, 2015

  • CIM
    The Sedex deposits of Selwyn Basin: A Summary Analysis of Factors that must be Addressed for the Successful Development of a World Class Metallogenic Belt

    By Neil Westoll

    But First, An Overview of the Selwyn Basin and Its Resources ?World-renowned sedimentary-exhalative (SEDEX) deposits of zinc, lead, silver +/-barite ?Significant reserves/resources remain and vast t

    May 1, 2006

  • CIM
    The Pierina Project: From Acquisition to Production

    By Barrick Pierina, John Frostiak, Igor Gonzales, Kenneth G. Thomas, Ken Manning

    "1.0 SummaryThe Pierina deposit was acquired in August 1996 when Barrick Gold Corporation purchased Arequipa Resources, a junior mining company with extensive land positions in Peru. At the time of ac

    Jan 1, 2000

  • CIM
    Cyclone modelling: A review of present technology

    By L. R. Plitt, A. A. Turak, B. C. Flintoff

    "Since the publication of empirical cyclone models by Lynch and Rao in 1975 and by Plitt in 1976, the technical literature on this subject has consisted primarily of reports of applications, with only

    Jan 1, 1987

  • CIM
    Geophysical Case Study of the Gallen Deposit, Québec, Canada

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "As part of a larger research program, a number of MEGATEM airborne electromagnetic (EM) test flights were flown over the Gallen massive sulfide deposit in northwest Québec. A particularity of this te

    Jan 1, 2007

  • CIM
    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015