Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Assessing Vertimill Ultrafine Grinding Performance: The Gibraltar Mine CaseBy Keith Merriam, Jim McDonnell, Peter Radziszewski, Rob Rotzinger, Ian DeHart
"Taseko Mines Limited Gibraltar copper-molybdenum mine recommenced operation in 2004 with the initiation of a series of development projects to increase throughput capacity as well as modernize the mi
Jan 1, 2015
-
Geostatistical Simulation of Optimum Mining Elevations for Nickel Laterite DepositsBy J. A. McLennan
Nickel laterite deposits are typically formed from tropically weathered mafic-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular dozer
Apr 1, 2005
-
Real-time Assisted Driving System in Open Pit Mining Operations using Google EarthBy E. J. Sun
The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net
Oct 1, 2009
-
The NICO and Sue-Dianne Proterozoic, Iron Oxide-hosted, Polymetallic Deposits, Northwest Territories: Application of the Olympic Dam Model in ExplorationBy Kathryn L. Neale, Derek L. Mulligan, Robin E. Goad, Norman A. Duke, A. Hamid Mumin, W. John Camier
"Abstract - The NICO and Sue-Dianne deposits are being explored and delineated by Fortune Minerals Limited in the Mazenod Lake District of the Northwest Territories, using an Olympic Dam model. The de
Jan 1, 2000
-
Computer Control of Flotation at EcstallBy M. P. Amsden
"Ecstall Mining Limited, a subsidiary of Texas Gulf Incorporated operates the Kidd Creek Mine, a 10,000 tons per day base metal producer, near Timmins, Ontario. Two different ore types are mined and m
Jan 1, 1973
-
150th Anniversary Victoria Bridge, 1859 - mid-December, first train; 1860 August, celebrationBy H. J. McQueen
ORDER OF PRESENTATION ?INTRODUCTION TO THE VICTORIA BRIDGE ?REASONS FOR A BRIDGE AT MONTREAL ?RAILROAD BRIDGE REQUIREMENTS ?IRON PRODUCTION CANADA / WORLD AL ?METALLURGICAL INDUSTRY CANADA ?FA
May 1, 2011
-
Numerical Analysis of the Early Response of Paste Backfill in a Vertical StopeBy N. E. Mkadmi
Backfilling increases the stability of underground stopes and may help reduce the environmental footprint from the mining operation. The barricades holding the backfill in place must be designed to pr
May 1, 2011
-
Self-optimizing Grinding Control for Maximising Throughput while Maintaining Cyclone Overflow SpecificationsBy Eduardo Nunez, Asim Tuzun, Dan Graffi, Glenn MacPherson
"In preparation for the milling of a new nickel and copper mine ore, Nickel Rim South, Xstrata’s Strathcona Mill is undertaking numerous process improvement projects. Within the grinding circuit, seve
Jan 1, 2009
-
Processing Plant Expansion at Kittila Mine Affords Opportunity for Significant Material Handling ImprovementBy T. Holmes, J. Middlemiss
"Agnico-Eagle (AE) has been operating their Kittila Mine in Northern Finland since 2008. The mine has experienced considerable ore flow problems with ratholing, bridging and freezing in their mill fee
Jan 1, 2017
-
Doing More with What We Already Know – Improving the Efficiency of Minerals ProcessingBy Joe Pease
"The demand for minerals and metals is increasing. Head grades of ore bodies are dropping. Remaining ores are becoming finer grained, more complex, and more logistically challenging. Mineral processin
Jan 1, 2015
-
Predicting the Energy Requirements of High Pressure Grinding Rolls Using Piston Press Test ProceduresBy Zorigtkhuu Davaanyam, Bern Klein, Stefan Nadolski, Amit Kumar
"The High Pressure Grinding Rolls (HPGR) is a relatively new comminution technology that has been shown to be more energy efficient compared to semi-autogeneous (SAG) mills. Full and fair consideratio
Jan 1, 2015
-
The Gold Gravity Recovery Effort - A New Concept in the Design and Optimization of Recovery CircuitsBy Z. Xiao, A. R. Laplante
"The recovery of gold by gravity from grinding circuits differs from virtually all other gravity recovery approaches in that stage (or unit) recoveries are low, typically 1 to 5%, but overall recoveri
Jan 1, 2001
-
Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)By N. Coli
The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant
May 1, 2009
-
Kansanshi Copper Smelter: The First Four Years of OperationBy S. Hunt, D. de Vries
Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe
Jan 1, 2019
-
Advanced Process Control for Grinding CircuitsBy E. Gallestey, D. Groenveld, F. Kolb, M. Rozou
"Recent copper price evolution pushes modern mining industry even harder to achieve highest production with maximum efficiency. Operations are bound by numerous contractual and environmental condition
Jan 1, 2015
-
The Sedex deposits of Selwyn Basin: A Summary Analysis of Factors that must be Addressed for the Successful Development of a World Class Metallogenic BeltBy Neil Westoll
But First, An Overview of the Selwyn Basin and Its Resources ?World-renowned sedimentary-exhalative (SEDEX) deposits of zinc, lead, silver +/-barite ?Significant reserves/resources remain and vast t
May 1, 2006
-
The Pierina Project: From Acquisition to ProductionBy Barrick Pierina, John Frostiak, Igor Gonzales, Kenneth G. Thomas, Ken Manning
"1.0 SummaryThe Pierina deposit was acquired in August 1996 when Barrick Gold Corporation purchased Arequipa Resources, a junior mining company with extensive land positions in Peru. At the time of ac
Jan 1, 2000
-
Cyclone modelling: A review of present technologyBy L. R. Plitt, A. A. Turak, B. C. Flintoff
"Since the publication of empirical cyclone models by Lynch and Rao in 1975 and by Plitt in 1976, the technical literature on this subject has consisted primarily of reports of applications, with only
Jan 1, 1987
-
Geophysical Case Study of the Gallen Deposit, Québec, CanadaBy D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain
"As part of a larger research program, a number of MEGATEM airborne electromagnetic (EM) test flights were flown over the Gallen massive sulfide deposit in northwest Québec. A particularity of this te
Jan 1, 2007
-
Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto FurnacesBy K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz
The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi
Jan 1, 2015