Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Destruction of Cyanide in Tailing Pond Reclaim Water Using Peroxymonosulfuric Acid at Barrick Goldstrike

    By M. Drozd, A. Ibrado, P. Butcher

    While effective in treating refractory sulfide ores, pressure oxidation leaves carbonaceous matter unscathed and able to adsorb gold from cyanide solutions. Barrick Goldstrike's strategy to mitig

    Jan 1, 2005

  • CIM
    Optimizing water management at Gregg River Coal Mine

    By G. Beckstead, L. F. Sawatsky, R. Nutbrown, D. Long, G. Gould

    "This paper presents a case study for optimizing water management at Gregg River Coal Mine located near Hinton, Alberta. The optimization study was derived based on a review and assessment of existing

    Jan 1, 1997

  • CIM
    An Attempt to Standardize the Estimation of Dilution Factor for Open Pit Mining Projects

    By Anoush Ebrahimi

    Mining dilution is one of the most important factors affecting the economy of mining projects. Ore losses and dilution are present at all stages of mining and while several models can investigate the

    Aug 1, 2013

  • CIM
    Remediation of Abandoned Lignite Mines in East Germany - Technical, Environmental, and Social Challenges

    By M. Kuyumcu

    After German reunification the mining industry in former East Germany was profoundly restructured. Beside privatization of profitable companies the public sector took over responsibility for the minin

    Aug 1, 2013

  • CIM
    Effect of Additional Shear Strain on Recrystallization Texture Formation in a Hot Rolled Al-Fe Alloy

    By K. Ihara, T. Yamaguchi, K. Matsumoto

    "Al-Fe alloy sheets having layers with different strain components were produced by unlubricated hot rolling and the recrystallization texture formation during annealing was investigated in each layer

    Jan 1, 2018

  • CIM
    Some Problems Met in Selling Coal

    By C. Gerow

    THIS paper is entitled "Some" problems, rather than "The" problems, met in selling coal, since the problems to be met in selling any commodity have to deal with an infinite number of circumstances and

    Jan 1, 1936

  • CIM
    Soil Mapping as an aid to Geological Interpretation

    By F. H. Edmunds

    Introduction This paper, it is hoped, will serve as an introduction to further work upon the origin of the soils and to a more complete interpretation of the geology of Saskatchewan from a study of

    Jan 1, 1929

  • CIM
    Recycling of Nickel, Copper, Cobalt, and Vanadium

    By Clemens Kuhnert

    "Nickelhütte Aue GmbH is specialized in the recycling of waste materials containing non-ferrous metals. We treat nickel, copper, cobalt, vanadium, molybdenum and precious metal containing materials li

    Jan 1, 2017

  • CIM
    Digital Transformation in Metallurgical Facility Design, Construction and Operations

    By D. Ofstie, B. Kargutkar

    BIM, or Building Information Modeling, is transforming the way metallurgical facilities are built, operated and maintained. BIM provides a digital representation of the facility, complete with all phy

    Jan 1, 2015

  • CIM
    Environmental management in a global economy (CIM Bulletin)

    By S. Vézina

    "Environmental issues have evolved considerably over the last two decades. The main contributing factors, to name a few, have been the changing values of modern societies, the globalization of trade a

    Jan 1, 2006

  • CIM
    Collaboration Of Industry And Educational Institutes To Meet The Future Needs Of Mining

    By W. E. Oching, M. M. Ghomshei

    Attracting and retaining workers in mining industry has become an uphill battle to many mining companies. As workers with significant experience retire, it is getting more difficult to attract not onl

    Jan 1, 2023

  • CIM
    An Implementation of Model Predictive Control on a SAG Mill

    By J. L. Wilson

    "Many modern concentrators with VSD driven SAG mills still rely on the control room operator to manually adjust the speed in reaction to increasing bearing pressure. All too often, the problem with th

    Jan 1, 2019

  • CIM
    Beneficiation of Industrial Minerals Using a Tribo-Electric Belt Separator

    By F. J. Hrach, K. P. Flynn, P. J. Miranda

    "ST Equipment & Technology, LLC (STET) has developed a processing system based on tribo-electrostatic belt separation that provides the mineral processing industry a means to beneficiate fine material

    Jan 1, 2016

  • CIM
    Modeling of the Cambro-Ordovician Reservoirs of HNIA Field, Illizi Bassin, Algeria

    By Makhlouf Boubahziz

    The HNIA field is part of the Tinrhert project which consists of developing 17 fields containing essentially gas with a few small rings of oil. It is considered as one of the main fields in this proje

    Aug 1, 2013

  • CIM
    Implementation of an Advanced Thickener Underflow Density Control at Loulo Gold Mine, Mali

    By D. Sagara, V. G. Makhado

    "A model based control strategy was implemented at Loulo Gold Mine in Mali, to stabilise the thickener underflow stream density. This stream acts as the feed to the leaching circuit. pH control of the

    Jan 1, 2017

  • CIM
    Galvanizing in Mining

    By M. Gagné, F. E. Goodwin

    The mining industry represents a significant investment in infrastructure of which steel plays a key role. Many structures in a mine are made of steel including shaft structures (buntons, station stee

    Jan 1, 2015

  • CIM
    The Mechanism of Chalcopyrite Leaching in Acidic Ferric/Ferrous Sulfate Media in the Presence of Silver-Enhanced Pyrite

    By D. B. Dreisinger, D. G. Dixon, G. Nazari

    "The kinetics of chalcopyrite leaching in acidic ferric/ferrous sulfate media under atmospheric conditions in the presence of pyrite has been investigated. It has been found that pyrite samples from d

    Jan 1, 2012

  • CIM
    In-situ mechanical characterization of a paste backfill with a self-boring pressuremeter

    By J. Ouellet

    "ABSTRACTA brief background on in-situ testing of mine backfill, as well as pressuremeter testing is briefly described, and results from an in-situ testing on paste backfill are presented. A series of

    Jan 1, 2000

  • CIM
    Structural Characterization of Orogenic Gold Deposits. A Case Study: Rosebel Gold Mine, Suriname, Guiana Shield

    By B. Westin, G. Voicu, C. Daoust

    Orogenic gold deposits represent a major class of deposits that are found in various rock types of various ages. Those deposits show a strong structural control that usually complicates their interpre

    Jan 1, 2011

  • CIM
    Defining in-situ block size

    By M. Grenon

    "The presence, size, orientation, nature, and persistence of geological discontinuities dictate the behaviour of a rock mass. Block size, which is defined by discontinuity spacing, by the number of jo

    Jan 1, 1998