Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Stress Corrosion Cracking of Rock Bolts

    This paper outlines the mechanism of Stress Corrosion Cracking (SCC) and how it can cause premature failure of rock bolts. SCC occurs due to the progressive development and growth of cracks in the sur

    Jan 1, 1998

  • AUSIMM
    The Sunburst Trial at Leinster Nickel Operations

    By Meyer T

    Sunburst PCF (Penetrating Cone Fracture) technology has recently undergone extensive underground field trials at Leinster Nickel Operations, Western Australia. Trials with the Sunburst machine start

    Jan 1, 1995

  • AUSIMM
    The Recovery of Sulphuric Acid From Copper Tankhouse Electrolyte Bleeds ù A Case Study on the Development of Solvent Extraction Processes

    By K Gottliebsen

    Many hydrometallurgical and chemical processes produce large amounts of acid waste. This is illustrated by the copper S/X-E/W process used at the Mount Gordon mine in North Queensland, which produces

    Jan 1, 2000

  • AUSIMM
    Pilot Reactor for Flash Smelting

    By Smith T. N, Wild M. B, Elliot B. J

    The process of flash smelting of nickel sulphide ores, as practised at the Kalgoorlie Nickel Smelter, is described. The critical variables in the operation of this process are identified. The design

    Jan 1, 1991

  • AUSIMM
    The Manufacture and Microscopic Examination of Shovels

    In the early ages man contented himself with the use of such tools and appliances as would assist him in the enlightenment of his labours. With the advancement of science, numerous motives, with modif

    Jan 1, 1926

  • AUSIMM
    Improving Fine Particle Flotation Selectivity at Hellyer

    By Richmond GD

    The Hellyer concentrator of Aberfoyle Limited commenced production in 1989 processing a fine grained, massive sulphide ore containing Zn, Pb, Ag, Cu and Au as values. Four concentrates are produced

    Jan 1, 1993

  • AUSIMM
    Mine to Mill Reconciliations at Paddington Gold Mine

    Paddington processing plant is located approximately 30 km north of Kalgoorlie on the Menzies Highway and is owned by Placer Dome Asia Pacific. First mining was from the Paddington Pit, but in subsequ

    Jan 1, 2003

  • AUSIMM
    Measurements and Modelling of Pressure Surges in Orepasses

    By H Rose, T J. Sheer, M Dumka

    Whenever rock is tipped from above, severe eruptions of airborne dust occur into the airways connected to tipping stations of rock passes (ore and waste) on the lower levels of a gold mine in the Nort

    Jan 1, 2005

  • AUSIMM
    Improved Blast Pattern Design on Mt Whaleback Based on Pilbara Iron Ore Classification (PIOC)

    This paper details a proposal for integrating the use of the Pilbara Iron Ore Classification (PIOC) and stratigraphic data for fine tuning blast. pattern design on Mt Whaleback. The main thrust of

    Jan 1, 1986

  • AUSIMM
    Development Concept in the Mining Industry - An Accelerator to Achieve Regional Sustainable Development

    By F A. Rosyid

    Mineral resources are national assets which must be capitalised for national development. Those assets should be transferred into real economic capital and then into social capital to achieve national

    Jan 1, 2008

  • AUSIMM
    Electronic Detonators ù Following a Scientific Process to Sustain Maximum Value

    By J Watson

    Electronic detonator technology has been under development for the last two decades. Currently, there are a number of systems commercially available with several others still under development, each w

    Jan 1, 2004

  • AUSIMM
    The Oroya Shoot and its Relationship to Other Flatly Plunging Ore Pipes at Kalgoorlie

    Acclaimed as one of the most remarkable orebodies anywhere on account of its length and richness, the Oroya Shoot occurs on the eastern side of the Kalgoorlie gold mining district close to the contact

    Jan 1, 1959

  • AUSIMM
    The Determination of Gas Content of Coal from Borecores

    By Doyle J

    The direct method of gas content determin ation developed by McCulloch and Diamond of the U.S.B.M. has been adapted to estimate the gas content of coal seams from slim exploration borecores in the

    Jan 1, 1983

  • AUSIMM
    Diamond Drilling at Norseman

    Diamond drilling was first carried out at Norseman in the Princess Royal Mine, early in this century. Little concentl'ated drilling was done from then until Western Mining Corporation commenced d

    Jan 1, 1956

  • AUSIMM
    A Simulation Model for Selecting Suitable Digging Method for a Dragline Operation

    By Mirabediny H, Whitchurch K

    A computerised simulation model has been developed to select the most suitable digging method of a dragline operation for a given geological condition. The developed procedure uses a geological ore

    Jan 1, 1995

  • AUSIMM
    Production Ripping as a Viable Alternative to Blasting

    Material hardness and environmental factors can limit or restrict conventional blasting techniques and this has led to advancements in the performance and efficiency of ripping. Not all materials ca

    Jan 1, 1995

  • AUSIMM
    The FalTmT Deposits, Republic of Senegal ù An Old Kid, New on the Iron Ore Block

    By S KandT

    The FalTmT iron ore deposits are located in the so-called æBirrimianÆ volcano-sedimentary complex that extends in a general NE-SW direction across eastern Senegal and part of Mali and Guinea. The rock

    Jan 1, 2005

  • AUSIMM
    Learning from Nuclear Waste Repository Design: the Ground-Control Plan (9344425e-0fdb-451a-8179-1134301c90ee)

    With mining development on hold and other underground works in a slowdown, the development of nuclear wa te repositories takes centre tage on the American rock engineering scene. Three repositorie for

    Jan 1, 1988

  • AUSIMM
    Comparison of Excavation Methods in Different Ground Conditions with the Decision Aids for Tunnelling

    By F Sandrone, J-P Dudt, J Zhao, E Paltrinieri

    Tunnel boring machines (TBMs) excavation is nowadays more and more considered a valuable alternative to conventional tunnelling. As a matter of fact, thanks to its advantages such as greater rate of a

    Sep 17, 2014

  • AUSIMM
    Effective Blast Engineering

    Of all of the processes in the mining cycle, blasting has the greatest impact on the efficiency of both mining itself and the initial stages of ore processing. The cost of blasting can be readily acco

    Jan 1, 1999