  • AUSIMM
    In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case study

    By K Grohs, A Satriawan, S R. Pearce

    Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi

    Aug 2, 2023

  • AUSIMM
    Development of a visual measurement system of geomaterials under triaxial compression

    By D Asahina, T Endo, H Hosono, T Takemura

    Changes in the stress field around faults due to the excavation of underground space or the extraction of underground resources induce fault reactivation. To understand the mechanism of fault reactiva

    Nov 29, 2022

  • AUSIMM
    Waste batteries – are you prepared for the coming avalanche?

    By D Bush, F Goddard

    The electrification of Australian mine sites will see a boom in the use of batteries of all chemistries. Lead acid batteries, a traditional mainstay of the mining industry, are expected to nearly doub

    Apr 16, 2024

  • AUSIMM
    Parallel Implementation of a Tabu Search Procedure for Stochastic Mine Scheduling

    By R Dimitrakopoulos, R Senécal

    This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st

    Nov 24, 2014

  • AUSIMM
    The Python - An Underground Processing Plant for Narrow Vein Mining

    By N J. Grigg

    Gekko Systems has developed an underground pre-concentration plant (Python) to reduce mine operating costs. Many ores liberate favourably using either high pressure grinding rolls (HPGR) or vertical

    Jan 1, 2008

  • AUSIMM
    Risks beyond relinquishment – quantifying post-relinquishment management and maintenance costs

    By M R. Lane, M L. Cramer, N P. Wines

    Increasing attention is being focused by regulators and industry on the residual environmental liabilities associated with mining projects following site relinquishment (termed surrender in Queensland

    Aug 2, 2023

  • AUSIMM
    Automated omission-free geotechnical deformation monitoring – a new method deployable by non-specialists

    By J Franke, C Gonzalez

    One of the regular tasks of geotechnical and mining engineers is the measurement and management of deformation in underground excavations. Although several methods are used to do so, the incumbent met

    Nov 29, 2022

  • AUSIMM
    Unveiling the future of psychosocial hazard management – a multidisciplinary approach

    By N Armitage, C Young

    In the dynamic realm of mining health and safety, addressing psychosocial hazards is crucial. Legislative requirements now demand employers navigate this complex terrain, but uncertainty often clouds

    Apr 16, 2024

  • AUSIMM
    Planning for (not so) final land use

    By J Durbin

    To effectively plan for closure, we must have an end-point in mind. To undertake meaningful rehabilitation, a post-mine land use (or uses) must be known. However, it is becoming more apparent that th

    Jul 25, 2018

  • AUSIMM
    SRS-1200, shaft rescue system with intrinsically safe communications and gas monitoring

    By B Stewart

    The SRS-1200 concept came about following the recommendations from the Board of Inquiry into the 1994 Moura No 2 mine disaster with the aim of having a system to remove personnel from an unsafe enviro

    May 5, 2022

  • AUSIMM
    Geophysical Techniques Applied to Blasting Design

    By J C. Koppe, L Vieira

    One common problem for blasting in iron ore mines with significant weathering is the occurrence of large blocks of hard rock mixed with softer material. This situation causes a problem for blasting de

    Aug 24, 2015

  • AUSIMM
    New Life for the Argyle Diamond Mine – Block Cave Style and Beyond

    By D C. Ford

    The Argyle AK1 orebody was discovered in 1979 and subsequently found to be a large, economically viable reserve with high grade diamondiferous ore. Production began via an open pit operation

    Aug 22, 2011

  • AUSIMM
    Sustainable production from rehabilitated coal mine pastures in southern Queensland’s Brigalow Region – Acland grazing trial results

    By J Eberhard, C Paton, J Bennett, C Baillie, A Melland, J F. Clewett, T Newsome

    A central aim of rehabilitation is to ensure that disturbed land is returned to a post-mine condition that is safe, stable and self-sustaining. This paper describes initial results from a grazing tria

    Jul 25, 2018

  • AUSIMM
    A decision framework for comparison of coal void rehabilitation options

    By A Hocking, S Henderson

    Commonwealth of Australia (2016) defines rehabilitation as comprising “the design and construction of landforms as well as the establishment of sustainable ecosystems or alternative vegetation, depend

    Jul 25, 2018

  • AUSIMM
    Balancing the benefits and impacts of future copper demand – climate change and arsenic

    By P J. Bangerter, G D. Corder

    With the societal desire and drive towards low carbon energy sources, there is a growing awareness of the important role that minerals and metals will play with renewable energy technologies. Copper

    Jul 25, 2018

  • AUSIMM
    The International Network for Acid Prevention (INAP) ù An Overview of Activities

    By A-M Fleury

    There has been much progress on the issue of acid drainage over the past 20 years; however, significant challenges remain. The International Network for Acid Prevention (INAP) is attempting to address

    Jan 1, 2003

  • AUSIMM
    Bringing Split Flotation to Reality ù The Cannington Experience

    The BHP Billiton Cannington mine uses sequential flotation to treat a silver, lead and zinc ore supplied from an underground mine. The final products from the process plant are a silver rich lead conc

    Jan 1, 2003

  • AUSIMM
    Coeur d'Alene Mines - A Commitment to Growth

    Coeur d'Alene Mines is a precious metals producer which is dedi- cated to growth through it's exploration and acquisitions efforts. We foster and support these activities by providing our s

    Jan 1, 1991

  • AUSIMM
    Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24

    By S Dorrington, J Olsen, N Kinkaid

    Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often

    Nov 4, 2015

  • AUSIMM
    Valid spontaneous combustion hazard assessment for surface mine environmental impact statements

    By J Theiler, B Beamish

    Spontaneous combustion hazard assessment from an environmental impact perspective is not well understood and is seldom given due consideration in environmental impact statements. In surface mining ope

    Jul 25, 2018