Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Copper, Gold and Subduction: A Trans-Pacific Perspective

    Rajor intrusion-related Cu and Au dep- osits along the Cordilleran-type central Andean margin and in the western Pacific island arcs constitute a series of discrete, linear belts which correspond t

    Jan 1, 1987

  • AUSIMM
    Application of Leading Practice Spontaneous Combustion Assessment to Exploration at the Doyles Creek Project

    By J Edman, RáBeamish, G Cambourn, B Beamish

    Moist Adiabatic Benchmark (MAB) and R70 testing have been applied to core samples of a multiple seam sequence from a borehole at the Doyles Creek Project. The coal samples range in rank from high vola

    Jul 1, 2013

  • AUSIMM
    Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to production

    By H Wright

    Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp

    Mar 29, 2023

  • AUSIMM
    Leading Practice Water Management at Moranbah North Underground Mine

    By D Yates, C C(te, M Rodgerson

    This paper describes how specific technical and regulatory issues related to water management have been dealt with at Anglo AmericanÆs Moranbah North mine. It compiles the collection of practices that

    Nov 26, 2013

  • AUSIMM
    Adequacy of Sampling and Volume Estimation for Premining Potential Acid Forming Waste Evaluation Using Statistical and Geostatistical Methods

    By A Garvie, D Kentwell, J Chapman

    "Most new mining projects require an initial assessment of the locations and volumes of potential acid forming (PAF) waste that is likely to be moved and dumped in surface waste stockpiles. This requi

    Jul 10, 2012

  • AUSIMM
    Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin Mine

    By M S. Kizil, T OÆConnor

    It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At

    Jul 1, 2013

  • AUSIMM
    Cost-Effective Dry Screening, Dewatering and Water Treatment

    By R Norris, M Dunne

    Mining and mineral processing is expected by society and obliged by law to operate in an environmentally friendly fashion, minimising the impact on and avoiding damage to the environment. Substantial

    Jan 1, 2006

  • AUSIMM
    Tailings Dewatering, Dry Screening and Water Clarification for Reduced Water Usage

    By R Norris, M Dunne

    Substantial efforts by the industry, as well as by process and equipment designers, have resulted in many innovative developments that provide cost effective reductions in water usage. This paper show

    Jan 1, 2006

  • AUSIMM
    Development of a new beneficiation plant for recovery of iron and apatite concentrates through wet tailing dams

    By M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi

    With the declining of high-quality hematite and magnetite iron ore reserves and the increasing accumulation of material resulting from mining and beneficiation operations that appear as lowquality dep

    Aug 24, 2022

  • AUSIMM
    Process Development for the Marampa Iron Ore Tailings Project, Sierra Leone

    By P Dunn

    Following civil war in Sierra Leone, London Mining Plc obtained the mining license in 2006 and commenced activity to redevelop the Marampa mining and processing operations. The Sierra Leone Marampa mi

    Jul 11, 2011

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai Mine

    By D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah

    Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected

    Aug 24, 2015

  • AUSIMM
    Gravity Gold Recovery in Obuasi Mines

    Mining operations in the Obuasi mine of AngloGold Ashanti Limited began in 1897 using mainly gravity concentration and amalgamation to recover the gold from predominantly high-grade quartz ores. The m

    Aug 1, 2010

  • AUSIMM
    Development of mine intelligent ventilation technology in western China

    By S G. Li

    Mine intelligent ventilation is an important guarantee to realise intelligent mining. It is the integration of the Internet of Things, big data, artificial intelligence, internet, cloud computing with

    Oct 12, 2022

  • AUSIMM
    Olympic Dam open stope observations, tactics and characterisation

    By G Capes, L Morizzi, N Mitkas, E Jones, D Grant

    This paper describes the mining setting for the sub-level open stoping (SLOS) mining method used at Olympic Dam (OD), and investigates the range of stope performance conditions encountered over 30 yea

    Mar 15, 2021

  • AUSIMM
    A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications

    By H Yuan, H Tian, Y Zhang, Z Wang, C Wang

    Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili

    Aug 21, 2024

  • AUSIMM
    The Use and Optimisation of Ferrous Feed at the Whyalla Blast Furnace

    By G Caddy, M Middleton, S Kerec, R Keil, J Tsalapatis

    Arrium’s OneSteel Whyalla Steelworks in South Australia is a fully integrated plant which operates a single blast furnace. The key operational objective has been to maintain high process availability

    Jul 13, 2015

  • AUSIMM
    Modelling multi-seam interactions for longwall mining

    By A Lines

    This paper addresses a gap in longwall multi-seam interactions and their predictions, providing a case study for future multi-seam operations for both anticipated conditions and a method for understan

    Nov 30, 2018

  • AUSIMM
    Analysis on composition and physico-chemical property change of PbO-bearing slag in Pb smelting

    By G Cao, Y R. Cui, J X. Zhao, H P. Gui, G H. Wang, Z M. Wang, M M. Ren, B Li

    Pyro-metallurgy is still the main process for lead production and a lot of lead direct smelting processes have been developed in recent years. All the processes will experience two steps in common. Th

    Aug 21, 2024

  • AUSIMM
    Formation of <i>O,OÆ</i>-Di-Alkyl-Dithiophosphate Copper(I) Complexes on the Surface of Synthetic Chalcocite ù NMR and SEM Studies

    By O N. Antzutkin, W Forsling, K J. Pike an

    The adsorption mechanism of three different O,OÆ-di-alkyl-dithiophosphate (dtp) collectors, K[S2P(OR)2] with R = Et, i-Bu and i-Amyl, on the surface of synthetic chalcocite (Cu2S) was studied by means

    Jan 1, 2005