Search Documents

  • IIMP
    Automatización de la planta concentradora de BHPBilliton Tintaya S. A.

    By Valentín Choquenaira Bombilla

    El presente trabajo describe el proceso de automatización de la planta concentradora BHPBilliton deTintaya desde el punto de vista del usuario final y así proporcionar una visión global sobre los asp

    Sep 12, 2005

  • SME
    Methods For Preventing Decompression Of Soft Ground During Soft Ground Tunneling For The Paris Metro

    By J. Janin, J. F. Bougard

    Development of improved transportation networks in major urban centers has led more and more to underground construction, the only reasonable solution for decreasing surface traffic congestion. Excava

    Jan 1, 1974

  • ISEE
    Response of Pressurized Pipelines to Production - Size Mine Blasting

    By Mark S. Stagg, David E. Siskind

    The mining industry occasionally blasts near pressurized transmission pipelines and has requested guidance of safe vibration levels and setback distances. the Bureau of Mines and the Indiana Departmen

    Jan 1, 1996

  • NIOSH
    RI 7347 Selection Of Anode Materials And Operating Conditions For Electro Winning Beryllium

    By D. A. Keefe, O&apos

    The electrowinning of beryllium from beryllium oxide (BeO) using a molten-salt electrolyte composed of 56 LiF-37 BeF2-7 BeO (mole-percent) was investigated. Anodes made of porous carbon were found to

    Jan 1, 1970

  • AUSIMM
    Online Cyanide Analysers Optimise Cyanidation and Ensure Cyanide Code Compliance for Plant Tailings

    By D Kotzen

    Online cyanide analysers have been successfully used to control free cyanide in the gold/silver leach process for over 15 years. Use of such analysers leads to cyanide savings and improvement in recov

    Jan 1, 2007

  • SAIMM
    The Development And Implementation Of The Lonmin Mechanized Breast Mining

    By K. Moxham, R. G. B. Pickering

    Over the last few years Lonmin Platinum and Sandvik have embarked on a unique partnership of collaboration through a systematic approach to developing equipment to mechanize and automate narrow reef p

    Jan 1, 2006

  • AIME
    Institute of Metals Division - Pressure Distribution in Compacting Metal Powders

    By P. Duwez, L. Zwell

    In recent years, the problem of pressing metal powder in a die has received much attention. The question has been the object of a Symposium held in New York in March 1947 under the sponsorship of the

    Jan 1, 1950

  • AUSIMM
    Applications of Exhaust Steam Turbines to the Power Plants of Mines

    The cost of power is an important matter to mining companies generally and this thought that the members of the Australasian Institute of Engineers, as well as the engineering and mining professions g

    Jan 1, 1912

  • SME-ICGCM
    Stability of Slopes in Discontinuously Jointed Rock (4d3fd7d1-f3a8-44f5-b86c-03d96a9b1123)

    By T. M. Tharp

    Attempts to analyze the stability of slopes, foundations and underground openings in discontinuously jointed rock have generally assumed full joint continuity or ignored the role of stress concentrati

    Jan 1, 1984

  • SME
    Geologists Add Value at Newmont’s Nevada Mines – Part Two

    By Wayne Trudel, Eric Saderhold, Lloyd McEvers, Lori Clarke, Charles Lynn Bolin, Leroy Schutz

    Editor’s note: This is the second part of a two-part series on how mine geologists added about 141t (4.53 million oz) at Newmont Mining’s gold operations in Nevada during 2003. Part one (ME, July2004

    Jan 1, 2004

  • NIOSH
    IC 6798 Sand And Gravel Excavation; Part I: The Power Shovel, The Dragline Excavator, And The Excavator Crane ? Introduction

    By J. R. Thoenen

    This circular is the third of a series summarizing the technical problems involved in the production and preparation of sand and gravel. The first, Information Circular 6668, published in December 193

    Jan 1, 1934

  • NIOSH
    Barrier Pillars In Lackawanna Basin, Northern Field - Anthracite Region Of Pennsylvania ? Summary

    By S. H. Ash

    THE BARRIER-PILLAR SYSTEM in the Lackawanna Basin consists of 93 barrier pillars between Archbald and Taylor, Pa. These pillars affect 48 mines, have a total length of 87 miles, and confine 21 undergr

    Jan 1, 1952

  • SAIMM
    Pit Wall Failures On ?Unknown? Structures

    By Phillip M. Dight

    A number of impending and actual pit wall failures have been observed and documented which have been interpreted to initiate on newly generated structural features. This infers failure through intact

    Jan 1, 2006

  • SME-ICGCM
    An Applications Approach To Barrier Pillar Design For Improved Resource Recovery

    By John R. Koehler

    Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu

    Jan 1, 1989

  • AIME
    Institute of Metals Division - The Effects of Irradiation upon Metals

    By F. Seitz

    STAFF: Editor, Gerhard Derge Carnegie Institute of Technology Schenley Park Pittsburgh 13, Pa. Editorial Assistant, M. A. Redmerski Managing Editor, James J. Burke THE METALLURGICA

    Jan 1, 1960

  • SAIMM
    Development And Implementation Of An Electrically-Powered Stope Rockdrill For Tautona Mine - Synopsis

    By A van Jaarsveld

    Environmentally-friendly, safe and cost-effective technology for stope drilling has successfully been introduced at TauTona mine. It has enabled the problem of inadequate compressed air pressure and i

    Jan 1, 2008

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • ISEE
    Blast Vibration and Seismograph Section - A History of the Development of Instruments for Measuring Vibrations of the Earth - Part 1

    By Robert Hopler

    Earthquakes, ground vibrations, seisms, or whatever you want to call the shaking of the earth, have been a fact of life throughout time. In spite of this, most people (except those unfortunate enough

    Jan 1, 2006

  • AIME
    Direct Production of Metallic Zinc by the Electrothermic Process

    By George Weaton

    Two years ago the general features of the St. Joseph Lead Company's zinc-smelting process were described.1 At that time the discussion was limited to a description of the production of high-purit

    Jan 1, 1939

  • DFI
    Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles

    By John F. MacDonald

    From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn

    Jan 1, 1990